Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Modeling The Influence Of Slurry Temperature On Gold Leach And Adsorption Kinetics At The Fort Knox Mine, Fairbanks, Alaska

    By Eric M. Hill, Daniel E. Walsh, Hsing K. Lin, John T. Hollow

    The Fort Knox Mine is located in Alaska’s interior where the average ambient air temperatures range from -24°C in January to 16°C in July. The mill processes a free milling gold ore utilizing both a

    Jan 1, 2005

  • SME
    Leaching Practices At Smoky Valley Mine

    By C. Arthur Lefler

    The hydrometallurgical processes for recovery of gold and silver in use at Round Mountain, Nevada and the practical aspects of the operation are discussed. Included are heap leaching by cyanidation, u

    Jan 1, 1981

  • SME
    Limestone Mining – Is It Noisy Or Not? (a6f0b5ad-a610-4972-afd6-68c53ccd734c)

    By D. R. Babich, E. R. Bauer

    National Institute for Occupational Safety and Health (NIOSH) researchers are conducting a cross-sectional survey of equipment noise and worker noise exposures in the mining industry. Surface and und

    Jan 1, 2006

  • SME
    Exploration (2303cc71-ebf3-44eb-bd90-42769f9f3467)

    By D. R. Wilburn

    The worldwide budget for nonferrous, nonfuel mineral exploration was expected to increase by 58 percent in 2004 from the 2003 budget, according to Metals Economics Group (MEG) of Halifax, Nova Scotia.

    Jan 1, 2005

  • SME
    Extensive Concrete and Shotcrete Systems for the World?s Longest Tunnel (Gotthard Base Tunnel?56km)

    By Jürg Schlumpf

    Concrete is one of the decisive construction materials, also for the AlpTransit Gotthard Tunnel. The client has many requirements, and many are the solution possibilities that concrete systems can off

    Jan 1, 2008

  • SME
    Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel

    By Michael Rehbock-Sander

    The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked

    Jan 1, 2012

  • SME
    An Approach To Successful Development Of International Mineral Projects

    By T. L. Owen

    Since 1993 Cyprus Amax has brought $2.5 billion dollars of greenfield and expansion projects into production, taking it from a mid-sized domestic minerals company into a major international minerals o

    Jan 1, 2000

  • SME
    Effect Of Ore Particle Size On Gold Dissolution In A Cyanide Solution

    By J. Egan

    The recovery of gold by ore leaching is influenced by the size of the particles and the chemical environment. Within the experimental error associated to the testing of gold ore, results of a series o

    Feb 27, 2013

  • SME
    112th National Western Mining Conference attracts heavyweights

    The 112th Annual National Western Mining Conference (NWMC) hosted by the Colorado Mining Association (CMA) drew some political heavyweights, if by voice only, into the fray of two of the hottest topic

    Jan 4, 2010

  • SME
    IntelliMine - Innovative technologies and concepts for the sustainable and intelligent Deep Mine of the future

    By H. Hejny

    "The mine of the future will exploit mineral raw materials at greater depths than today, requiring completely different approaches compared to today’s deep mines, in order to get mineral rights. Only

    Jan 1, 2011

  • SME
    The Effect Of Frother Type And Concentration On The Water Recovery And Entrainment Recovery Relationship

    By J-P Franzidis

    A study was undertaken to determine the effect of five industrial frothers on the relationship between entrainment recovery and water recovery. The experiments were conducted using a Batequip rectangu

    Jan 1, 2000

  • SME
    Rib Support Optimization for a Room-and-Pillar Mine

    The National Institute for Occupational Safety and Health (NIOSH) conducted a monitoring field study to optimize the rib control plan in a room-and-pillar coal mine. The study mine is located in the C

    Jul 28, 2020

  • SME
    Annual Review 2003 - Mining Review

    By P. A. Plunkert, D. E. Morse, L. McCartan, S. F. Sibley

    The average annual growth rate of real gross domes-tic product (GDP) from the third quarter of 2001through the second quarter of 2003 in the United States was about 2.6 percent. GDP growth rates in th

    Jan 1, 2004

  • SME
    Methane Emissions And Airflow Patterns On A Longwall Face

    By S. J. Schatzel

    Coal mine longwall face ventilation is an important component of the overall mine ventilation system. Increases in the production rate due to higher capacity mining equipment tend to increase methane

    Jan 1, 2012

  • SME
    Finite Element Assessment Of The Influence Of Caving On Barrier Pillar Loads In Deep Coal Mines - Introduction - Preprint 09-065

    By W. G. Pariseau

    Conventional barrier pillars in underground coal mines are intended to protect mains and sub-main entries for relatively long periods of time. Inter-panel barrier pillars that may be used in especia

    Jan 1, 2009

  • SME
    Steel-Fiber-Reinforced Shotcrete For Tunnel Linings: The State Of The Art

    By Don Rose

    INTRODUCTION A number of tunnels supported and permanently lined by steel-fiber-reinforced shotcrete (SFRS) have been built in North America in the 1980s. The material is more economical than, and

    Jan 1, 1985

  • SME
    Doing It All: Cut, Crush, And Load With One Machine Wirtgen Surface Miner

    By D. van der Veen

    Mining companies and contractors are looking at Wirtgen Surface Miners to provide flexibility at their operations. Wirtgen Surface Miners have been used in the surface mining industry for over fifteen

    Jan 1, 2002

  • SME
    A Review Of Subsidence Prediction Research Conducted At Sandia National Laboratories

    By H. J. Sutherland

    This paper reviews the results of the subsidence research prop ram at Sandia National Laboratories. The manuscript highlights the following: the application of empirical methods (profile functions) to

    Jan 1, 1982

  • SME
    Small Mine Contractor Safety - Case Studies

    By F. Calizaya

    The Western Mining Training and Translation Center is a consortium of four universities devoted to developing educational and training projects to reduce the incidence/accident rates in the mining ind

    Jan 1, 2008

  • SME
    Interpretation Of The Effect Of Frother Type And Concentration On Flotation Performance In An OK3 Cell

    By B. A. Comley

    Over the past few decades a great deal of effort has gone into characterizing the effects of frother type and concentration in flotation using a variety of two-phase techniques. Whilst useful and info

    Jan 1, 2007