Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Performance of Footings in Rock Based on ServiceabilityBy C. M. Haberfield
"1 INTRODUCTION Around the world, there is a demand for larger structures, tall buildings and large bridges. While good footing design is important for all structures, it is even more important in the
Jan 1, 1900
-
Development of a mechanistic model for prediction of maximum subsidence and subsidence profile due to longwall miningBy Richard D. Begley
This paper summarizes the development of a mechanistic model to predict longwall mining induced surface subsidence. The model was originally developed from data acquired from a recent field study cond
Jan 1, 1989
-
Application Of The Q-System To Australian Underground Metal MinesBy Max F. Lee, Warren A. Peck
The applicability of the Q-system [Barton et al. 1974] to Australian underground metal mines is discussed with reference to two common design issues: ground support for horizontal mine development, an
Jan 5, 2007
-
OFR-15(2)-78 Evaluation Of The Application Of Repetitive Fuel/Air Explosions To Rock Ripping - Final Report - Phase IIBy John W. Colburn
A tractor-integrated version of an explosive ripping system was developed for mining application. This system utilizes diesel fuel and a tractor-mounted blower supplying 30 psig compressed air to a tw
Jan 1, 1977
-
RI 3723 National Safety Competition of 1942By W. W. Adams, T. D. Lawrence
"A. larger enrollment and a greater number of man-hours of employment by the enrolled companies were the outstanding features of the National Safety Competition of 1942, an annual safety contest condu
Oct 1, 1943
-
Settling Pond Design and Performance - The Malvern Hills Coal Mine ExperienceBy J F. Seale
The design of the settling pond for the Malvern Hills opencast coal project was based on a primary requirement to control runoff and sediment generated from the immediate 6 ha mine catchment, which in
Jan 1, 2004
-
OFR-144-82 Social, Economic And Legal Consequences Of Blasting In Strip Mines And QuarriesBy Michael Radnor
The purpose of the study was to 1) examine the social and economic impacts of surface mine blasting in relation to variations in conditions of terrain and geology, population density and type, levels
Jan 1, 1981
-
Paste Backfill at the Brunswick MineBy Michael Cooper, Eric Konigsmann, A. Moerman
"A paste backfill plant and underground piping distribution system was commissioned at the Brunswick Mine in June, 1998. Concentrator tailings, composed mainly of pyrite and lesser amounts of silicate
Jan 1, 1999
-
Quantification and Controls on as Distribution in Westland, NZBy D Craw, J Pope
The Greenland Group, Westland, can be characterised with respect to environmental issues by the application of a GIS database (DAME), and specific sampling campaigns. Waters draining gold mineralised
Jan 1, 2006
-
SilicosisBy S. L. Weber, D. E. Banks
"Silicosis was first reported by the ancient Greeks and is apparently as old as human history. The prevalence of this illness peaked in the last half of the 19th century and the early part of this cen
Dec 1, 1995
-
OFR-3(1)-80 The Development Of A Cross-Pit Overburden Handling System - Volume I - Preliminary DesignBy J. Ritchey
This report describes the engineering feasibility and economic advantages of using a mobile bridge-type cross-pit belt conveyor system in conjunction with a large dragline to excavate and transport sp
Jan 1, 1976
-
Notes on the Geology of the Pinnacles Mine and DistrictA homely simile will serve to epitomise an interpretation of the rock structures and associated phenomena of the block of country under review, as it appears to the writer.Disregarding the many thousa
Jan 1, 1927
-
Predicting methane emissions from longer longwall faces by analysis of emission contributorsBy R. B. Krog
As part of its mining health and safety research program, the National Institute for Occupational Safety and Health (NIOSH) conducted a longwall methane emission and mining time study at a mine operat
Jan 1, 2006
-
Iron and Steel Division - Rate and Mechanism of the Sulfur Transfer ReactionBy S. Ramachandran, N. J. Grant, T. B. King
MANY investigations of the rate of the sulfur transfer reaction between carbon-saturated iron and blast furnace type slags have been made." It is evident that the reaction is complex, the rate being a
Jan 1, 1957
-
Resonant Driving of Sheet Piles: High Production Sheet Pile Driving With Zero Ground VibrationBy Mathew Janes
"Sheet piles remain an economic solution to many shoring problems. However, installation of sheet piling suffers high noise and vibration with conventional impact or vibratory methods or low productio
Jan 1, 2014
-
Contributed Discussion "Instantaneous Outbursts of Coal and Gas - A Review" by Alan J. Hangraves ( Proceeding No. 285, March. 1983)By Rixon K. L
Hargraves (1983) has reviewed the phenomenon of instantaneous outbursts of coal and gas with special attention to Australian occurrences. The purpose of this discussion is to highlight some problems a
Jan 1, 1983
-
IC 6116 Petroleum Refineries In The United States January 1, 1929 ? Introductory SummaryBy G. R. Hopkins
According to reports received by the Bureau of Mines, Department of Commerce, as of January 1, 1929 there were 413 completed refineries in the United States, with a total daily crude-oil capacity of 3
Jan 1, 1929
-
RI 7021 Process Development In Removing Sulfur Dioxide From Hot Flue Gases (In Four Parts) 3. Pilot Plant Study of the Alkalized Alumina System for SO2 RemovalBy D. Bienstock
The use of alkalized alumina in removing sulfur dioxide from a coal-combustion flue gas at 625° F was investigated on a pilot plant scale. The absorber was 26 feet long and 1.6 inches ED. Counter-curr
Jan 1, 1967
-
Development described for fluidized bed combustion at TVA’s 20-MW pilot plantBy James W. Bass
Introduction Atmospheric fluidized bed combustion (AFBC) is an improvement over coal-fired boiler design. It offers several advantages over conventional boilers. AFBC can meet sulfur and nitrogen oxi
Jan 4, 1986
-
Experiences Of The Cast-In-Situ Pile Filling In Stone-Line IntercalationBy Guan Jichang
An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t
Jan 1, 1991