Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Everyone Has a Plan Until They Get Punched in the Mouth – Creating Trust, Commitment and Results in Tough TimesBy P Moynagh
"A plan is critical but on its own it is a bit one dimensional, the three dimensions critical to success over the long-term, through changing economic, geological and management conditions are:the qua
Nov 15, 2016
-
Highlighting duct constraints in duct-fan systems operating under negative pressureBy M Francoeur
Oct 12, 2022
-
What do High Reliability Organisational principles look like in practice in Queensland mines?By M S. Tuohy
Since the independent review of fatal accidents in the mining industry carried out by Dr Sean Brady (the ‘Brady Review’), High Reliability Organisations (HROs) and their operating principles have been
May 5, 2022
-
Measurements and Modelling of Evaporation from Abandoned Mine Pit LakesBy T van Niel, M Trefry, B Baker, I Rea, A Hawdon, D McJannet, D Boadle, R Fandrich, A Littleboy
Many open cut mines extend to depths well below the natural water table level with constant dewatering required to maintain operations. When mining activities cease the groundwater starts to fill the
Jun 28, 2016
-
Ventilation contaminant characterisation for a greenfield projectBy A Hatt
This paper presents a case study of characterisation work undertaken at a greenfield exploration project to provide engineering and OH&S inputs for the design of a ventilation system. The paper discus
Oct 12, 2022
-
Direct gold measurement for bulk ore sortingBy Y V. Haarlem, P Coghill, N G. Cutmore, M Millen, I Carter
Due to the low concentration of gold, ore sorting for gold has always required measuring indirect properties, such as density or colour, to allow separation on a rock by rock basis. This only works on
Nov 10, 2020
-
Proximity Cameras and Global Positioning Systems - An Integrated ApproachSafe, efficient production is a common objective for all large open pit mines. Despite comprehensive policies, procedures and regulations aimed at protecting workers, several people die each year in m
May 1, 2010
-
Building Sustainability Into a ProjectOrganisations are starting to develop processes for achieving sustainability principles they have defined for their organisation. The foundation for these principles is now well accepted. The definiti
Jan 1, 2004
-
Trigger Action Response Plans for Diesel Exhaust ExposuresBy J Jeffery, P G. Knott, F Velge, C Evans
A trigger action response plan (TARP) provides a structured response to escalating levels of risk. In mining, TARPs are typically applied to primary hazards such as inrush, strata failure or heating.
Aug 31, 2015
-
Project-Finance Risks ù Due Diligence MattersProject-finance risk assessment is mature and approached systematically. Mining industry due diligence remains fragmented with specialists addressing different aspects of the project such as reserves/
Jan 1, 2007
-
Removing some Subjectivity from Traditional BS 848 and ISO 5802 In Situ Fan Flow TestsTraditional in situ fan flow test methods under accepted standards require determinations to be made of both static pressures and total pressures during testing. This is to determine the resultant vel
Jul 1, 2013
-
Recent Grinding Practice in the Copper Concentrator of Mount Isa Mines LimitedBy M Gao, V Lawson, W Valery
Changes in metal prices and mine output over recent years have required the Copper Concentrator of Mount Isa Mines to operate at annual tonnage rates varying from 4.0 million to 6.5 million tonnes. Se
Jan 1, 2000
-
Working in Metallurgy ResearchWhen studying minerals degrees at university, all the emphasis is towards sending the graduates into the bush to work at a remote mine; however, that is not the only option available to new graduates.
Jan 1, 2006
-
Integration of real-time, online, individual cyclone measurement at Cerro Verde – challenges and lessons learnedBy A Castillo, K Wiese, L Panduro Robles
For decades, organisations worldwide have been working to overcome challenges associated with new technology adoption while keeping up with rapid growth, development, and globalisation. In minerals pr
Aug 24, 2022
-
KEYNOTE: Using Metallurgical Data to Drive Continuous ImprovementBy R Dunne
"Continuous improvement on metallurgical treatment plants is possible only when good data and analysis of the data are available. Good data implies appropriate and accurate mass measurement coupled wi
Oct 10, 2016
-
From paper to bytes – digital mapping implementationBy A Whaanga
The use of photogrammetry has greatly increased the accuracy of 3D mapping underground. However, this has not reduced the need or desire for geologists to produce plans and sections showing an interpr
Mar 22, 2022
-
Shifting Waters in the Pilbara’s Iron Ore IndustryBy I Brandes de Roos
Water has played a key role in the Pilbara’s 60-year history of iron ore operations. In contrast to many of the current-day mining environments, iron ore mining was initially hosted by geological form
Jul 13, 2015
-
The Merlin Zone – Rhenium Quality AssuranceBy D A. Sketchley
The Merlin Zone, a 2008 high-grade Mo-Re discovery, is a part of the Mount Dore Deposit in the Eastern Succession of the Mount Isa Inlier in Queensland, Australia. Hosted by carbonaceous metapelites a
Aug 22, 2011
-
Blast design and execution drives mine site profitsBy J Loeb, J Dampney, P Cameron
Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load
Jun 22, 2022
-
Mine Project Risk ManagementRisk management has become an essential tool for mining companies to ensure their projects are well-managed and profit expectations are achieved. Risk management has also become a mandatory corporate
May 24, 2012