Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Soil Mixing - Title ? Table Of ContentsJan 1, 2001
-
Cofferdam Failures ? IntroductionBy Richard J. Hartman
This presentation identifies some of the more common problems associated with cofferdam construction. After the various problems are identified, they are briefly explained and possible solutions and p
Jan 1, 1987
-
An In-Situ Model Test For A Large Hydraulic Press Foundation ? SynopsisBy R. J. Yan
There was a plant equipped with a 32000t Hydraulic Press to be built, under which a box foundation of 22.5m x 15m x 14.25m (depth) with a base slab of, varying thickness was proposed. The subgrade rea
Jan 1, 2010
-
Analytically Modelling Dst Arrival Time Databases With High Order Polynomials For Optimal High Resolution ImagingBy Gerald Verbeek, Erick Baziw
Downhole Seismic Testing (DST) is an extensively utilized geotechnical tool for site characterization. DST provides low strain (<10-5) in-situ interval shear and compression wave velocity estimates. T
Oct 1, 2022
-
Dynamic Monitoring And Analysis Of Pile Foundation Installations ? IntroductionBy Patrick J. Hannigan
The pile foundation designer typically performs a subsurface exploration program and static pile capacity calculations before selecting a pile foundation type, length, and capacity. During constructio
Jan 1, 1990
-
House & Commercial Building Foundation - Introduction & HistoryBy Roger A. Bullivant
As the UK's foremost domestic foundation underpinning contractor over the last 25 years it has become abundantly clear that the size of the repair market, some £500m per annum is a significant wa
Jan 1, 1995
-
Micropiled Foundations of Telecommunication TowersBy Racquel Nottingham, Marc Mastrantuono, Freddy Lopez
In the digital era that we live in, connectivity and mobility play a decisive role in our daily activities. In this context, insufficient telecommunication infrastructure gives origin to the so called
Sep 8, 2021
-
Assessment of the Durability of Cementitious Barrier MaterialsBy Stephan A. Jefferis, Adrian H. Bath
"This paper draws together some themes on the durability of barrier systems, and particularly cementitious systems. For contaminated land and water retaining structures, durability can be poorly addre
Jan 1, 2016
-
Non-Destructive Testing Of Drilled Shafts - Title ? Table Of Contents - Introduction And OverviewBy Edmund J. Cardoza
WELCOME TO THE DEEP FOUNDATIONS INSTITUTE 26TH ANNUAL CONFERENCE AND WELCOME ESPECIALLY TO THIS SEMINAR ON NON-DESTRUCTIVE TESTING OF DRILLED SHAFTS, PRESENTED BY MEMBERS OF THE DFI DRILLED SHAFT COMM
Jan 1, 2001
-
The Use of Controlled Modulus Column (CMC) Ground Improvement for Support of Large WarehousesBy Brandon T. Buschmeier, Sonia S. Swift, Michael P. Walker, Frederic Masse
"Ground improvement has undoubtedly become a cost-efficient and effective solution to support the development of poor soil sites. Ground improvement elements, such as Controlled Modulus Columns (CMCs)
Jan 1, 2017
-
Evaluation Of A New P-y Analysis Tool For Lateral Analysis Of Drilled Shafts Using Load Tests In NevadaBy David H. Sanders, Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan
Large-diameter drilled shafts (DS) are a critical part of a seismic-resistant system, and therefore it is important to be able to accurately model lateral resistance. To undertake the lateral load ana
-
Maturation of Risk Concepts in the Management of Infrastructure - Lessons from the US Army Corps of EngineersBy Eric C. Halpin
"1. Introduction and Backgrounda. In its fundamental form, risk is simply the likelihood of an adverse impact. Expanding on this theme, the Corps of Engineers has broadly defined risk associated with
Jan 1, 2014
-
Utilizing Drones to Improve Project WorkflowsBy Barritt Lovelace
Collins Engineers has been researching and implementing the use of drones on Civil Engineering Projects since 2015. Applications include bridge inspection, asset management, mapping, construction site
Jan 1, 2019
-
8000 Series Piling RigBy Roger A. Bullivant
The introduction of this size and type of piling rig is intended to address a multipurpose foundation activity. The 8000 denotes the size of equipment that is attached to the mast, namely 8000 Kg. Lar
Jan 1, 1995
-
Making Foundation Design Courses More Engaging and Effective for StudentsBy Evangelia Ieronymaki
Civil engineering education relies on traditional methods of teaching, comprising mostly of deductive instruction by presenting the theory, followed by applications. This paper presents an alternative
Jan 1, 2019
-
Laboratory Validation Of In-Situ Tests - 1. IntroductionThis paper summarizes seven years of Italian experience with the use of large calibration chambers for the calibration, under closely controlled stress and strain conditions, of some in situ testing
Jan 1, 1987
-
Proceedings Of Earth Retention Systems 2003: A Joint Conference - Earth Retention Systems In The Urban Environment - Special ConsiderationsBy George J. Tamara
The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence
Jan 1, 2003
-
Field Tests Of Soft Clay Stabilized By Stone Columns In Coastal Areas In ChinaBy Han Jie
The results of full scale plate load tests on stone columns on soft clay in coastal areas are presented in this paper. Four load tests were made, two of which were performed on the ground treated with
Jan 1, 1991
-
Piling Adjacent To Rail Tunnels At King’S Cross CentralBy David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott
This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600
May 1, 2022
-
Willow Island Hydroelectric Project: Taming the Ohio River to Create Green EnergyBy James M. Tantalla, Jr. Ellman
"Construction of the powerhouse for the Willow Island Hydroelectric Project, located at the Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular coff
Jan 1, 2016