Search Documents

  • AUSIMM
    Some Less Common Minerals in the Rosebery and Hercules Zinc-Lead Ores

    The Rosebery and Hercules mines, situated in the Rosebery-Williamsford district in western Tasmania, have a history of production dating back to 1896-7, although full scale production did not commence

    Jan 1, 1960

  • TMS
    Recent Developments In Electric Furnace Smelting Technology At Mufulira Zambia

    By I. S. Blair

    The introduction of the 36 MVA smelting furnace at Mufulira, and the experience gained during the first five years of operation have been described previously (6). Based on this experience the furnace

    Jan 1, 1983

  • CIM
    Management of Environmental Emissions at Boliden Harjavalta Oy’s Smelter

    By H. -L. Heikkilä, E. Peuraniemi

    "Boliden Harjavalta Oy has a long tradition in the Finnish metal industry starting from the 1930's. The Smelter consists of copper and nickel flash smelting lines. Off-gases are captured in the acid p

    Jan 1, 2012

  • ISEE
    Vibration Effects on Historic Structures

    By Randy Wheeler

    One of the more difficult topics to address concerns the effects of vibration on historic structures. Not only blast induced vibration, but also vibration from other transient and semi-continuous sour

    Jan 1, 2004

  • CIM
    The Otjikoto Gravity Circuit: Test Work, Design, Commissioning, and Operation

    By E. Barnard, J. Tero, J. Rajala, N. Avenido, M. Fullam, A. Nashitati, S. Mbalamba

    "The Otjikoto mining and milling complex is 90% owned by B2Gold Corporation, and began commercial operation on February 28, 2015. The milling circuit operates at a throughput 3.3 million tonnes per an

    Jan 1, 2018

  • AIME
    Technical Notes - Availability of Cesium for Ion Rockets (Mining Engineering May 1960, pg 482)

    By R. Greenwood

    The advent of the space age and its promise of interplanetary flight has prompted new ideas for propulsion systems that will allow maximum energy with minimum fuel weight. The use of cesium as the sou

    Jan 1, 1961

  • SME
    Discussions - Reserves, resources, and pie-in-the-sky

    By K. A. Grace

    K.A. Grace's article advocates usage of the terms describing resources as defined by the US Bureau of Mines (USBM) and the US Geological Survey (USGS). Originally recommended in 1943, the terms w

    Jan 8, 1985

  • AUSIMM
    Industrial Minerals Potential in New South Wales

    Despite a long history of production of industrial minerals and rocks, New South Wales still offers significant opportunities for exploration for and development of these minerals. Exploration for

    Jan 1, 1989

  • DFI
    Value Engineering – Design Risk and Reward at Major Sport Arena Projects

    By Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli

    Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw

    Jan 1, 2018

  • AIME
    Zonal Relations of the Lodes of the Sumpter Quadrangle

    By D. F. Hewett

    CONTENTS PAGE Introduction 1 Geologic features of eastern Oregon 2 Geology of the Sumpter quadrangle 2 Rocks older than the ore deposits 3 Rocks younger than the ore deposits 8 Lodes of the S

    Jan 1, 1931

  • AUSIMM
    Permitting the Grey River Dredge

    By E Breese

    The Grey River dredge is the first large scale alluvial operation to be permitted under the Mining Act 1971 and the Water and Soil Conservation Act 1967. The experience of Grey River Gold MiningLimite

    Jan 1, 1989

  • AUSIMM
    Triboelectric Charge and Separation Characteristics of Industrial Minerals

    Triboelectric Charge and Separation Characteristics of Industrial Minerals The basic principles of triboelectric charge and separation of minerals and the factors affecting the entity of the charges

    Sep 13, 2010

  • SME
    A study on the optimum arrangement of buoyancy module for stability of marine flexible riser using genetic algorithm & multi-body dynamic simulation

    By Tae-kyeong Yeu, Cheon-Hong Min, Hyung-woo Kim, Sup Hong, Minuk Lee, Chang-Ho Lee

    This paper concerns the optimum arrangement of the buoyancy module, which is used for stable dynamic motion and structure stability of the marine flexible riser. The main method of this study is simul

    Sep 1, 2014

  • AUSIMM
    Management of Hydrogeological Risk in Tunnelling Projects

    A key driver to the success of a tunnelling project (the project) is the management of hydrogeological risk. The hydrogeological risk, if not managed, may cause significant impacts on the overall perf

    Jan 1, 2008

  • AUSIMM
    Influence of Cognitive Biases on Project Evaluation

    By S Love, M Anderson, M Boland

    "The high rate of failure of new mine developments to meet feasibility study expectations has been the subject of many fine technical papers. Yet failure rates remain stubbornly high.Similarly, the co

    Mar 8, 2016

  • SME
    Shaft Construction in Toronto Using Slurry Walls

    By Vince Luongo

    PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located just north of Toronto, Ontario, Canada will see the construction of a tunnel extending a

    Jan 1, 2007

  • SME
    The present work proposes a novel process to sinter porous iron ore (porosity ~23-24%) with enhanced productivity and quality.

    By M. SIDDARAJU, Rameshwar Sah, Satendra Kumar, Arvind Jaiswal

    The study explores a novel process to sinter porous iron ore with improved productivity and quality. The iron ore is pre-processed with calcined lime to temporarily close pores, preventing water absor

    Feb 28, 2022

  • NIOSH
    RI 7774 Sulfur Dioxide Emission Control By Hydrogen Sulfide Reaction In Aqueous Solution - The Citrate System

    By J. B. Rosenbaum

    Prolonged laboratory and limited pilot plant tests have shown that the Bureau of Mines buffered S02 -H2S process is capable of removing 95 to 99 percent of the S02 from industrial waste gases. Most of

    Jan 1, 1973

  • ABM
    Estimativa Do Módulo De Tenacidade Através De Integração Numérica

    By Daniel Antonio Kapper Fabricio

    O módulo de tenacidade é um parâmetro que representa a energia absorvida por um material até a ruptura, e é uma variável importante para avaliar se o material sofrerá fratura quando em serviço. A tena

    Aug 7, 2018

  • AIME
    Certificate of Incorporation

    WE the undersigned, being all persons of full age and citizens of the United States, and a majority residents of the State of New York, desiring to form a corporation pursuant to the provisions of the

    Jan 1, 1942