Search Documents

  • CIM
    Development of the SII “Mission” Mineral Sands Project

    By D. Settles, R. Rose, P. L. Dunn

    "A new mineral sands operation is being developed in Georgia by Southern Ionics, Inc. (SII). Prevailing mineralogy and certain design constraints required detailed testing and circuit analysis to cre

    Jan 1, 2015

  • NIOSH
    OFR-11-83 Portable Trailing Cables, Splices, And Couplers Design And Installation Considerations

    By L. A. Morley

    This report summarizes the work performed on Bureau of Mines Contract J0199106, "Portable Trailing Cables, Splices, and Couplers - Design and Installation Considerations," from May 1, 1979 until Decem

    Jan 1, 1982

  • CIM
    Gestion De Résidus Miniers Stabilisés Par Ajout De Chaux Et De Ciment Chez Zinc Électrolytique Du Canada À Valleyfield, Québec

    By Benoît Demers

    Dans ses opérations de traitement de concentré de zinc, l?usine de Zinc Électrolytique du Canada à Valleyfield génère un résidu minier appelé « jarosite ». Jusqu?en 1998, le jarosite était transporté

    Nov 1, 2002

  • SME
    Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and Tunnels

    By Joseph Gildner, Donald J. Phelps, Jürgen Laubbichler, Christopher Tattersall, David McAllister

    The Beacon Hill Station and Tunnels portion of the Sound Transit Central Link Project consists of one mile of twin rapid transit tunnels, an underground station, portals and ancillary works constructe

    Jan 1, 2005

  • CIM
    Stratigraphy and Structure of Bituminous Coalfields in the Vicinity of Jasper Park, Alberta

    By B. R. MacKay

    Introduction During the past six seasons the writer has been engaged in semi-detailed investigations on the coal areas lying along the front of the Rocky mountains between the Brazeau river and the

    Jan 1, 1930

  • NIOSH
    RI 3847 Selective Reduction of Iron in Chromite by Methane-Hydrogen and Similar Gas Mixtures

    By F. S. Boericke

    "INTRODUCTION The mineral found in natural-chromite deposits is never pure Fe0.Cr203, but rather one in which the Fe0 and Cr203 are in part replaced by Mg0 and A1203, respectively. The purest gravity

    Feb 1, 1946

  • CIM
    Cyanide Recovery and Detoxification Study on Seabridge Gold’s KSM Project

    By Dean Lindsay, Inna Dymov, Mariam Melashvili, Jim Smolik, Chris Fleming

    "This paper presents results from the proposed cyanide detoxification circuit for Seabridge Gold’s KSM project. The proposed flowsheet uses a two-stage CCD (counter-current washing/decantation) circui

    Jan 1, 2015

  • NIOSH
    IC 9245 A User's Manual For MFIRE: A Computer Simulation Program For Mine Ventilation And Fire Modeling

    By Xintan Chang

    MFIRE is a computer simulation program that performs normal ventilation network planning calculations and dynamic transient-state simulation of ventilation networks under a variety of conditions. The

    Jan 1, 1990

  • SME
    SME Research Forum - Mining Technology and Research Needs – Chemical Products Suppliers’ Perspective

    The minerals industry consumes billions of dollars in raw materials, equipment, tools, services and chemicals. The industry, though, has turned overmuch of the research and development (R&D) for thes

    Jan 1, 2000

  • NIOSH
    RI 2570 A Float-And-Sink Method And Apparatus For Testing Coarse-Size Coal

    By Byron M. Bird, Earl R. McMillan

    "The method and apparatus described herein was developed at the Northwest experiment station of the Bureau of Mines, Interior Department, in cooperative research work with the University of Washington

    Feb 1, 1924

  • SME
    Characterization Of Coal And Quartz Dust In Interior Basin Coal Mines

    By Y. Paul Chugh

    NIOSH and the Illinois Clean Coal Institute are funding studies on characterization of coal and quartz dust in Interior Basin mines since 2009. Coal dust characteristics vary significantly and, are vi

    Jan 1, 2011

  • DFI
    Downtown Seattle Transit Project - International District Station

    By Richard K. Sandaas

    Start Date: April 4, 1988 Completion Date: Dec. 29, 1989 Contractor: SCI Contractors Past and present transportation centers will come together at International District Station, located at th

    Jan 1, 1990

  • AUSIMM
    Processing of Hard-to-Treat Copper Ore and Flotation Middlings Using Chemical Treatment

    Processing of Hard-to-Treat Copper Ore and Flotation Middlings Using Chemical Treatment

    Sep 13, 2010

  • CIM
    Assessing the Total Cost of Representativity in Flotation Plants

    By D. Brand

    "The risk management objective of the AMIRA Code of Practice for Metal Accounting has seldom been systematically investigated in the literature up to the authors’ knowledge. Risk is defined in the Aus

    Jan 1, 2017

  • SAIMM
    A Case Study Of Risk Evaluation At Cerrejon Mine

    By Luis-Fernando Contreras, Juliano Maran, Richard LeSueur

    A risk study was carried out at the Cerrejon coal mine in order to assess the impacts of pit slope failure in terms of safety of personnel and destruction of equipment with economic consequences. Res

    Jan 1, 2006

  • SAIMM
    Testing Tendon Support Units Under a Combination Loading Scenario

    By N. L. Ayres

    Tendon support systems have been successfully used to stabilize excavations. Tendon support systems are routinely designed using the axial load-bearing capacity of tendons, namely the tensile strength

    Jan 1, 2014

  • NIOSH
    Coal Mine Seismicity And Bumps: Historical Case Studies And Current Field Activity

    By Keith A. Heasley, John L. Ellenberger

    The National Institute for Occupational Safety and Health (NIOSH) has continued the research role of the former U. S. Bureau of Mines to develop techniques that will reduce the hazards in the mining w

  • SME
    Landslides, Drought, And Brown Trout In The Red River, NM

    By D. Conklin

    Annual fish monitoring of the Red River, NM from the town of Red River to downstream of Questa, NM has been conducted since 1997. This long-term dataset, sponsored by the Chevron Mining Inc. Questa M

    Jan 1, 2011

  • CIM
    Recent Changes at the Sarcheshmeh Copper Mine Flotation Circuit

    By S. Banisi, M. Pourkani, A. Kargar, D. Hamidi, M. Sarvi

    "Flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. To study the stage recovery of copper, one of the

    Jan 1, 2001

  • NIOSH
    RI 4234 Edison Spodumene Mine, Pennington Co., S. Dak.

    By Fermont F. Clarke, Others, Paul Zinner

    "INTRODUCTION The Edison mine comprises workings on two irregular spodumene-bearing pegmatite dikes which outcrop near the town of Keystone in the southern portion of the Black Hills of South Dakota.

    Apr 1, 1948