Search Documents

  • AUSIMM
    Effective Mining Project Management Systems

    By C Adams

    Reports of delays and cost blowouts in major study and construction projects are becoming increasingly prevalent in the resources industry. This is mainly being attributed to an escalating cost enviro

    Jan 1, 2006

  • AUSIMM
    Kalgoorlie Geology Re-Interpreted

    By Miller F. S

    The famous Golden Mile of Kalgoorlie in Western Australia was, between 1888 and 19ft, one of the richest and most important gold camps in the world. Annual production, which reached a peak of nearly 1

    Jan 1, 1937

  • SAIMM
    Shotcrete Lining Of South Deep Shafts

    By W. P. Erasmus

    This paper will focus on the use of the ?wet-mix? steel fibre re-in forced shotcrete as a permanent lining in deep shafts, assessing gold bearing reef. It will cover all aspects relating to the choice

    Jan 1, 2001

  • SAIMM
    Sampling In The South African Minerals Industry

    Although not fully accepted in South Africa, the Theory of Sampling originally proposed by Pierre Gy is fast becoming the cornerstone of sampling practice throughout the world. The growing acceptance

    Jan 1, 2014

  • DFI
    Rock Sockets

    By D. E. Sherwood

    Mr. Tamaro introduced his paper which concerned the construction of foundations for the buildings and related infrastructure of the World Financial Center on a reclaimed shoreline site at the Southern

    Jan 1, 1991

  • NIOSH
    Abrasive Materials (MATERIALS MINERALS YEARBOOK-1966)

    By Paul M. Ambrose

    Overall the domestic abrasives industry had one of its best years in 1965. Production and value of all commodities increased over that of 1964 which also was a good year. Production of tripoli that wa

    Jan 1, 1966

  • AUSIMM
    Leaching of Metal Sulphide Concentrates at Atmospheric Pressure Using SO2/O2 Mixtures

    By Matthew I. G

    A new process for leaching zinc sulphide concentrates with gaseous mixtures of SO2 and O2 in aqueous solution is described.The reaction of SO2/O2 with Rosebery, Mt. Isa, Broken Hill and Elura zinc con

    Jan 1, 1981

  • AIME
    Geology - Study of the Mechanism and Rate of Ilmenite Weathering

    By L. E. Lynd

    Ilmenite concentrates prepared from beach and dune sands of Florida, India, Australia, and other localities deviate to varying degrees from the theoretical composition of pure ilmenite, and generally

    Jan 1, 1961

  • NIOSH
    RI 8736 Alumina Miniplant Operations - Calcination of Kaolin in a Direct-Fired Rotary Kiln

    By Theodore L. Turner

    This Bureau of Mines report describes calcination of kaolinitic clay in a direct-fired 2-1/2- by 24-ft rotary kiln at 750° and 775° C. Methods for preparing kaolin feed materials and characterization

    Jan 1, 1982

  • AIME
    Special Supplement: Mining Education Today

    How Mining Engineers Will Fare in 1977 Mining Education- The State of the Discipline Coal Mining Technologists are a New Force in the Labor Pool Trained Manpower Provided by Mining Technology

    Jan 1, 1977

  • SAIMM
    Can Artificial Intelligence and Fuzzy Logic be Integrated Into Virtual Reality Applications in Mining?

    The University of New South Wales (UNSW Australia) has been a world leader in the development of innovative virtual reality technologies over the last 15 years. AVIE (Advanced Visualisation and Intera

    Jan 1, 2014

  • AUSIMM
    Pegmont: A Stratiform Lead-Zinc Deposit in the Precambrian of Northwest Queensland

    Stratiform lead-zinc mineralization at the Pegmont prospect occurs as a 4-6 m thick body interbedded within arkose, schist, amphibolite, and pegmatite of the Kuridala Formation in the Eastern Belt of

    Jan 1, 1977

  • NIOSH
    Investigation Of Fully Grouted Roof Bolts Installed Under In Situ Conditions

    By David Oyler, Craig Compton

    The The National Institute for Occupational Safety and Health (NIOSH) Pittsburgh Research Laboratory (PRL) is continuing to investigate the behavior of fully grouted roof bolts in the weak roof rock o

  • DFI
    Seattle Shored Excavation - Design, Construction, Monitoring

    By David Winter

    The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of

    Jan 1, 1987

  • NIOSH
    RI 9533 - Field Evaluation Of Cable Bolts For Coal Mine Roof Support

    By John P. McDonnell

    Cable supports offer several advantages over traditional secondary support methods by enhancing stress redistribution to pillars and gob areas, minimizing or eliminating timbers and cribs that reduce

    Jan 1, 2010

  • SME
    Handling The Impacts Of Blasting On Grand Central Terminal For The MTA?s East Side Access Project

    By A. J. Thompson

    The Metropolitan Transportation Authority (MTA) East Side Access project (ESA) will, when it is complete, provide a new link to the east side of Manhattan from Long Island, NY that, linked with the Se

    Jan 1, 2012

  • AUSIMM
    Underground Mining Methods at Prgera Mine

    The Porgera Joint Venture commenced production during September 1990. A small tonnage underground mine extracts high grade gold ore using small scale stopes. Conventional drill and blast methods a

    Jan 1, 1991

  • SAIMM
    Longwalling At Great Depth In A Geologically Disturbed Environment - The Way Forward

    By F. Russo-Bello

    TauTona Mine (the renamed Western Deep Levels East) is using a longwall mining method with stability pillars to extract the Carbon Leader Reef at a depth ranging from 2097 metres to 3456 metres below

    Jan 1, 2000

  • NIOSH
    MLA 53-83 - Mineral Investigation Of The Italian Peak Rare II Area (No. I-1945), Beaverhead County, Montana, And Italian Peak Middle Rare II Area (No. M-4945), Clark And Lemhi Counties, Idaho - Summary

    By Robert H. Lambeth

    There are no identified mineral resources in the Italian Peak RARE II areas, and there are no producing or developing mines within or adjacent to the study area. Several prospects are in RARE II area

    Jan 1, 1983

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018