Search Documents

  • CIM
    Performance and Monitoring of the Louvicourt Mine Tailings Disposal Area

    By Michel R. Julien, Michel Lemieux, Jean Cayouette, Daniel Talbot

    "The Louvicourt Mine located near Val d’Or, Quebec has been in operation since 1994. It produces copper and zinc concentrates. The tailings generated from the ore processing operations have a strong n

    Jan 1, 2004

  • NIOSH
    OFR-86-86 Development Of The Capacity To Assess Occupational Noise Overexposure In The Mining Industry

    By A. G. Galaitsis

    This report summarizes the work performed under the USBM Contract No. J0245001. The purpose of this work was to expand and improve the scope and accuracy of the method developed under USBM Contract No

    Jan 1, 1986

  • AUSIMM
    Innovative Technology for Optimised Thickening Sedimentation

    Innovative Technology for Optimised Thickening Sedimentation

    Sep 13, 2010

  • NIOSH
    OFR-91-78 Preprototyple Machine-Mounted Respirable Dust Monitor

    By Pedro Lilienfeld

    This report describes a program to develop, design, fabricate and subject to environmental testing three prototype collection-sensing devices of an eventual mining-machine mounted automated monitor fo

    Jan 1, 1977

  • NIOSH
    IC 8551 Bureau Of Mines Energy Program, 1971 ? Introduction

    By John D. Spencer

    Clean energy production from coal, oil, and gas, and the development of these and other energy sources continued to be a major objective of the energy research program of the Bureau of Mines.3 In 1971

    Jan 1, 1972

  • AIME
    Geophysics - Progress and Prospects

    By Sherwin F. Kelly

    One of the most succinct and illuminating perspectives of the field of geophysical exploration to appear in recent years is an article by E. A. Eckhardt, in the magazine Geophysics for October 1949. A

    Jan 1, 1950

  • SME-ICGCM
    Optimizing Pillar Design In A Multi-Seam Environment

    By R. Kanniganti

    The primary problems of pillar design in seams subject to interaction are due not only to difficulties in predicting loading, but also to the often unsymmetrical nature of the stress fields. The effec

    Jan 1, 1995

  • AIME
    Reservoir Engineering - General - Effect of Composition and Temperature on Phase Behavior and Dep...

    By T. K. Perkins, L. R. Kern, R. E. Wyant

    Many factors influence the results of hydraulic fracturing to stimulate well productivity. Most of these factors have been studied and their effects discussed in the literature. However, the movement

  • TMS
    Electrolytic Salt Splitting for Sulfuric Acid and Caustic Recovery: Can It Be Cost-Effective?

    By Alexander Burns

    Electrolytic salt splitting is a technology where acid and/or base is regenerated from a neutral salt using membrane electrolysis. Recent advances in the understanding of brine treatment, membrane sta

  • NIOSH
    IC 8539 Bureau Of Mines Safety Research Center Research And Development Activities: Fiscal Year 1970 ? Introduction

    On July 1, 1969, the Explosives Research Center merged with the Health and Safety Research and Testing Center to form the Safety Research Center, with facilities at Pittsburgh and Bruceton, Pa. Subseq

    Jan 1, 1972

  • AUSIMM
    Epithermal Zeolite Deposits in Lacustrine Tuffs, Ngakuru, Taupo Volcanic Zone, New Zealand

    In the Ngakuru area, zeolite deposits occur in late Quaternary lake sediments and ignimbrites. The deposits are associated with sinters, hydrothermal eruption breccias, and quartz-adularia altered fau

    Jan 1, 2002

  • AUSIMM
    Ironstone Deposits, Iron Knob, Middleback Range Area South Australia: Discovery and History of Early Prospecting

    Very little has been written about the discovery and early history of prospecting of ironstone deposits in the Iron Knob-Middleback Range area of South Australia, the main source of supply of ironston

    Jan 1, 1969

  • SAIMM
    A Hybrid Location Methodology

    By S. M. Spottiswoode

    The aim of the hybrid location method is to improve seismic event locations by reducing the effects of errors in the wave velocity of ray paths between each event and each recording site. We report on

    Jan 1, 2005

  • AIME
    Cycles in Metal Production

    By D. F. Hewett

    ALTHOUGH most persons will agree that an individual or a nation can profit from the experience of other individuals or nations, there is always room for debate over the degree of similarity of their p

    Jan 1, 1929

  • AUSIMM
    Quantity Estimation of Concentrate in Dams

    At the treatment plant of the Broken Hill South Limited, Broken Hill, the zinc concentrates, with water, are pumped out to a more or less level area, and stored in dams to dry by drainage and evaporat

    Jan 1, 1925

  • IOM3
    Liberation of accessory minerals from various rock types by electric-pulse disintegration: method and application

    By B. E. Burakov, S. D. Lupal, O. A. R. Thalhammer, B. Saini-Eidukat

    Electric-pulse disintegration is a mineral separation technique that liberates all mineral grains from any igneous or metamorphic rock irrespective of its lithology or grain-size distribution. The nor

    Apr 1, 1995

  • AIME
    Extractive Metallurgy Division - Kinetic and Equilibrium Studies of Redox Reactions in Liquid Bismuth

    By D. H. Gurinsky, D. G. Schweitzer

    The empirical equilibrium constantsd the heat of reaction for the reduction have been determined from 300° to 500°C. The mechanisms of the oxidation of uranium and magnesium fro

    Jan 1, 1962

  • AUSIMM
    Exploration along the Hyde Macraes Shear

    By C E. J de Ronde, J G. Scott

    Economic gold mineralisation was discovered at Round Hill by Homestake NZ Limited in 1984 and was subsequently put into production by Macraes Mining Company Limited (MMCL) in 1990. The total mineral r

    Jan 1, 1997

  • AUSIMM
    Lessons Learnt from Mine Explosions

    By H R. Phillips

    During the 1980s and early 1990s, the South African coal industry experienced a series of methane explosions in which well over 200 coal miners lost their lives. In addition, a fire and an explosion i

    Aug 31, 2015

  • SME
    Small footprint, big challenges: Design and construction of the Allen Park storage tunnel

    By Brain E. Gombos

    The Allen Park Sanitary Sewer Overflow (SSO) Tunnel and relief sewer project, located in the city of Allen Park, MI, is a long-term corrective action designed to bring Sanitary District One?s sanitary

    Jan 1, 2013