Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Laboratory Investigations Leading to the Design of the King Island Scheelite Company's New Concentrator

    CONTENTSThe significance of values givenINTRODUCTIONTHE ORE1. DATA SECURED FROM THE MILLING PLANT AS OPERATING BETWEEN 1938 AND 1942(a) Mill Recoveries(b) Mill Flow Sheet(c) Scheelite-Garnet Associati

    Jan 1, 1944

  • AUSIMM
    The Importance of Mineralogical Input into Geometallurgy Programs

    By K S. Smith, J Woodhead, K Olson Hoal

    Mineralogy is the link between ore formation and ore extraction. It is the most fundamental component of geomet programs, and the most important aspect of a life-of-project approach to mineral resourc

    Sep 29, 2013

  • AUSIMM
    Meteorological Forecasting of Blast Noise from the Del Park Minesite (fbcdcfc5-5412-43cd-8805-cbe0739cecc8)

    Alcoa of Australia's Western Australian bauxite mining operations in the Darling Ranges, southeast of Perth, present major challenges in the control of air blast. The close proximity of rural com

    Jan 1, 1983

  • AUSIMM
    Multicommodity Exploration in the Murray Basin, Victoria, Australia

    By Preston JC, Richards DJ

    A multicommodity exploration programme was mounted in the 1970s by CRA Exploration Pty. Limited over a major part of the southern Murray Basin in Victoria. Commodities sought were brown and black

    Jan 1, 1986

  • AUSIMM
    The Development of Hilton Mine, 1947-1985

    By Mutton B. K

    Hilton Mine is being developed as an integrated component of the Mount Isa operation, to achieve continuity of silver/lead/zinc production well into the next century. The mine has a chequered hist

    Jan 1, 1986

  • AUSIMM
    Chlorine Based Flooded Pit Leaching of Oxide Gold Deposits

    The capacity of chlorine based solutions to rapidly and effectively dissolve coarse gold in oxide ores is well established. The inherent advantages of chlorine are high dissolution rates (10 - 100 tim

    Jan 1, 1992

  • AUSIMM
    The Application of Phase Equilibrium Studies to the Characterisation of Zinc and Lead Blast Furnance Sinters

    By Nairin J. D, Hayes P. C

    Detailed studies of the microstructures and compositions of zinc and lead blast furnace sinters have been undertaken. An analysis of the results obtained has indicated that in many cases the microst

    Jan 1, 1992

  • AUSIMM
    Rise and Pillar Rill Stoping at Golden Crown Mine

    By Rogers M, Sullivan B

    Golden Crown Mine is a narrow vein gold mine producing 75000 tpa. Production has been predominantly by shrink stoping using hand held machine and airleg. Bogging from these stopes is done with Toro 15

    Jan 1, 1993

  • AUSIMM
    Transport in Drifts and Shafts

    From depths of 400 - 600 m, coal is transported by a conveyor in a drift or a bulk winder in a shaft, whilst men and/or materials are transported by a slope hauler or a cage winder. Assessment of t

    Jan 1, 1976

  • AUSIMM
    Erosion Prediction Models and Factors Affecting the Application of the Universal Soil Loss Equation to Post-Mining Landscapes in Central Queensland

    By Aspinall T. O, Bell L. C

    Increased awareness and stricter enforcement of regulatory requirements for adequate rehabilitation of surface mining sites has made environmental planning an essential part of strip mine planning.

    Jan 1, 1991

  • AUSIMM
    Application of SMELT-2 Package to a Study of Continuous Converting in Sirosmelt Reactors

    By Denholm W. T

    The SMELT-2 package is specifically designed to perform on-line simulation of smelting processes. This paper describes its application to the simulation of continuous matte converting followed by r

    Jan 1, 1989

  • AUSIMM
    Conceptual and Geochemical Modelling at Mt Mackenzie, Central Queensland

    High sulphur volcanic-hosted hydrothermal environments are favourable geological environments for gold mineralisation. Numerous world-class gold deposits including Pueblo Viejo (Dominican Republic),

    Jan 1, 1994

  • AUSIMM
    The Control of Rotary Vacuum Filters in a Gold Recovery Plant

    By Peverett N. F

    The purpose of filtration in a gold reco- very plant is to separate the gold bearing liquid from the solids in the slurry. Some of the gold is inevitably lost due to incomplete separation. An inves

    Jan 1, 1977

  • AUSIMM
    Selection and Evaluation of Tunnel Excavation Methods for Heterogeneous Grounds

    By Tagawa H

    In Japan, geological condition do not only vary in a wide range of strata but are also extremely complex with the existence of faults and aquifers. With respect to rocks, in particular, it is very

    Jan 1, 1987

  • AUSIMM
    Mining Operations at Que River

    The Que River Mine is a small under-ground base and precious metals mine located in north-western Tasmania. Current production rate is 220,000 tonne/yr from reserves grading 0.37% copper, 7.1% lead, 1

    Jan 1, 1985

  • AUSIMM
    Removal of Iron from Bauxite

    By Gardner H. J, Wadsley m. W

    Bauxite from the Weipa and Andoom (North Queensland) deposits was treated to provide a low-iron raw material for high- alumina refractories or aluminium chloride manufacture. The operation involved

    Jan 1, 1979

  • AUSIMM
    Initiation Systems - What Does the Future Hold?

    The rapid industrialisation of the world was driven by an improved ability to utilise chemical energy. Unfortunately harnessing explosive energy did not come cheaply given the hundreds of lost live

    Jan 1, 1990

  • AUSIMM
    A Full Scale Coke Oven and Blast Furnace Trial with Bentonite Coke

    A nine-month investigation was conducted into the effect on coke quality and blast furnace operation of the addition of bentonite and southern coal to the northern coal fed to the coke ovens at the Ne

    Jan 1, 1962

  • AUSIMM
    Geostatistical Modelling of the Hilton and Mount Isa Lead-Zinc Orebodies, Mount Isa, Australia

    By Raymond G. F

    Geostatistics - a tool used by geologists and mine planning engineers to estimate grades and rapidly evaluate alternative mining strategies has reached an advanced stage of development for the silver-

    Jan 1, 1993

  • AUSIMM
    Large Scale Development of Submerged Lancing Sirosmelt Tin Process at Associated Tin Smelters

    By Jones KW, McClelland RA, Denholm WT, Taylor RN, OÆShea J

    Associated Tin Smelters, Sydney, are developing tin smelting operations in a prototype commercial SIROSMELT plant comprising two furnaces of 5 to 8 tonnes capacity. Features of the plant and its

    Jan 1, 1984