Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Late Cainozoic Uplift of the Ediacara Range, South Australia

    Drilling has disclosed a sequence of Cainozoic sediments immediately to the west of the Ediacara mineral field containing little or no dolomitic debris in the lower and middle sections, but with grave

    Jan 1, 1972

  • AUSIMM
    Studies on the Effect of Burden on Blast Damage and the Inplementation of New Blasting Practices to Improve Productivity at KCGMÆs Fimiston Mine

    By G E. Smith, G N. Lye

    Wall control blasting practices are necessary to reduce the impact of blasting on mine faces but can also have a significant negative impact on mine productivity and operating costs. The conventional

    Jan 1, 2001

  • AUSIMM
    Developing Assessment Methods and Remediation Protocols for New Zealand Sites Impacted by Acid Mine Drainage

    By A Black, A de Jo, J Cavanagh, J Harding

    Acidic and metal-rich waters have been discharging from Sullivan Mine, West Coast, New Zealand since the closure of the mine during the early- 1990s. This has resulted in a decrease in pH from a backg

    Jan 1, 2003

  • AUSIMM
    Application of High Efficient Fine Screen to Improve the Recovery of Tin Concentrate

    By W N. Qin, B Zhang, W Z. Huang, X S Mo

    Mengzi Mining and Metallurgy Co, Ltd (MMMC) polymetallic ore contains recoverable amounts of tin, lead, zinc, pyrite and other valuable minerals. With the change in orebody, the run-of-mine (ROM) ore

    Sep 1, 2014

  • AUSIMM
    A Simultaneous Optimisation Tool for Open Pit Mine Scheduling

    By Y Ren

    The algorithms employed by the commercial tools are either heuristic algorithm or iterative optimisation of a subsystem. This often results in a suboptimal schedule. In this paper, the author presents

    Sep 26, 2013

  • AUSIMM
    Petrographic and Mineralogical Factors Affecting Gold Recovery at Macraes Flat, Eastern Otago, New Zealand

    By D Craw, P V. Angus

    Gold mineralisation at Macraes occurs as late quartz-carbonate veins within a body of sheared and hydrothermally altered Otago Schist, the Intrashear Schist. The alteration is characterised by the pre

    Jan 1, 1999

  • AUSIMM
    Use of Simulation to Support Mining Industry Operators

    By Harper B

    The mining industry has developed a comprehensive view of the need to have production personnel well trained in the use and maintenance of mining equipment. A strong commitment from the industry to th

    Jan 1, 1998

  • AUSIMM
    Super-Scavenging of zinc Residue by the FASTFLOT Process at Pasmico Mining, Broken Hill

    By Fickera M. A, Marshall S, Burgeese F. L, Burgees J, Estrina H

    A new high intensity flotation process FASTFLOT was deployed to recover residual zinc from the zinc circuit tailings at Pasminco Mining's Concentrator, Broken Hill. Performance of the FASTFLOT

    Jan 1, 1995

  • AUSIMM
    The Influence of Energy Policy and Security Energy Supply Policy of Indonesia to Asia-Pacific Coal Distribution in 2025

    By A P. Wibowo

    Indonesia holds a significant role in the utilisation of coal resources in the world. Although the number of Indonesian coal resources and reserves do not fall into the world’s top ten, according to 2

    Nov 22, 2011

  • AUSIMM
    An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations

    By S Q. Liu, E Kozan

    This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is

    Nov 24, 2014

  • AUSIMM
    A new cut-off grade method to maximise resource utilisation of underground metalliferous mining operations

    By M Nehring, M Kizil, P Knights, A Mousavi, F Sotoudeh

    A cut-off grade is used to distinguish an economically viable block of ore from non-economical ones in mining operations. In order to obtain a high Net Present Value (NPV), a strategic and precise det

    Nov 10, 2020

  • AUSIMM
    On the development of a viscosity model for molten multicomponent slag systems with several glass-forming, amphoteric and modifier oxides

    By G M. Zhomin, A S. Arkhipin, A Kondratiev

    Viscosity of multicomponent slags is one of the crucial physicochemical properties for many industrial processes and technologies. While the viscosity-temperature relationship of completely molten sla

    Aug 21, 2024

  • AUSIMM
    Experimental Study on Extinguishing Characteristics of Coal Fire in Confined Space

    By B Wu, B W. Lei, B J. Duan

    When a coalmine fire occurs, it is crucial to judge the developing trends inside the fire area by analysing the changes of gas concentration in order to formulate the proper rescue measures. At presen

    Aug 31, 2015

  • AUSIMM
    Crafers Highway Tunnels, Adelaide, SA

    By G Brewster

    The Eagle on the Hill tunnels form part of an upgrade of Mt Barker Road, 15 km to the southeast of Adelaide. The upgrade significantly improves safety and reduces delays on this major road, which wind

    Jan 1, 1999

  • AUSIMM
    A Comparative Study of Manual Wagon Top Sampling and Auto Mechanical Sampling of 200 mm Size Coal with Respect to Stopped Belt Sampling of Thermal Coal at Indian Super Thermal Powerplants

    By K M. P Singh, K M. K Sinha, G S. Jha, T Gouricharan, K K. Sharma

    The majority of the powerplants in India are fed with non-coking coals, with the coals dispatched from their respective mines via wagons loaded by a rapid loading system or pay loader. The usual top s

    Jul 29, 2014

  • AUSIMM
    Australia's Mineral Resources- A Vital Role: An Uncertain Future

    The long-term outlook Tor Australla's traditional mining products is for flat demand and continuing low prices. This has come about because of three far-reaching changes since earlier boom day

    Jan 1, 1987

  • AUSIMM
    The Eight Millisecond Time Window Myth

    By A B. Richards

    Time window analysis that limits the explosive mass fired within a specified time window (commonly eight milliseconds) has been used for many years in blast design by explosives engineers. Despite sev

    Jan 1, 2003

  • AUSIMM
    Fluxing options and slag operating window for Metso’s DRI smelting furnace

    By K Vallo, T Haimi, J Pihlasalo, J Hamuyuni, M Lindgren, F Tesfaye

    Decarbonisation of the steel industry has recently attracted a lot of research and technological development. Most of the technological developments are centred around the replacement of blast furnace

    Jun 19, 2024

  • AUSIMM
    Application of Semtech Optical Process Control System at Mount Isa MinesÆ Copper Converters

    By O Pasca, B Hogg

    Consistent slag blow end point detection remains one of the challenges in the Peirce-Smith converters at Mount Isa MinesÆ Copper Smelter. Under blowing results in foaming on copper blow and carry forw

    Jan 1, 2005

  • AUSIMM
    Surface and groundwater monitoring and seepage control at the Sungun Copper Mine

    By N Pirouznia, F Rashidi Nejad, S Naraghi

    Sungun Copper Mine, which is the second largest copper mining operation in Iran has a large tailings storage facility with a seepage control dam located downstream of the main dam. Surface and groundw

    Jul 23, 2018