Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Evolution of Colliery Winding Engines

    The object of this paper is not to describe any particular type of engine in close technical detail but rather to give a general picture of past and present practice in this important section of the i

    Jan 1, 1945

  • AUSIMM
    Evolution of the Current Legal Environment into the Twenty-First Century - Its Impact on Australian Mining

    The perception of the mining industry in the Australian community has changed considerably over the last four decades. This has been partly brought about by changing values and expectations of the

    Jan 1, 1997

  • AUSIMM
    Contract Versus Owner Mining ù An Update on Australasian Open Pit Mining Practice (Iron Ore Conference Perth, WA, 9 - 11 September 2002)

    With the advent of the resources boom in the late-1960s most of the larger scale resources projects in Australasia were commissioned on an æowner miningÆ basis, where the mine owners owned and operate

    Jan 1, 2002

  • AUSIMM
    Milling at Great Western Consolidated No Liability, Bullfinch, W.A.

    By Howard G. L

    The gold treatment plant of Great Western Consolidated N.L. is at Bullfinch, Western Australia, 22 miles north of Southern Cross, which is 100 miles west of Kalgoorlie. A railway to Southern Cross con

    Jan 1, 1956

  • AUSIMM
    Application of Some Geostatistical Methods to Evaluate Phosphate Deposit (Abu Tartur Area, Egypt)

    By Ibrahim AR

    The experimental phosphate mine of abu Tartur has been recently placed into production. Some problems'have been encountered in maintai- ning grade control due to the differences between early

    Jan 1, 1986

  • AUSIMM
    Saxonvale Mine Development a Case Study in Project Planning and Project Management

    Saxonvale mine is a multi bench open pit coal mine developed to its Stage I capacity of 1.75 Mt/y of run of mine coal. Detailed engineering studies for the mine commenced in April 1980, approval t

    Jan 1, 1983

  • AUSIMM
    A Test of Two Methods of Simulation of Regionalized Variables

    By Armstrong M

    Two methods of Monte-Carlo simulations, one suggested by Matheron (1972) and the other by Rudenno (1983), have been tested for simulating coal deposits. To do this 2160 values of ash percentages were

    Jan 1, 1985

  • AUSIMM
    Opening Address (4b6d459a-ca8a-4164-97f2-7d5dc70ee466)

    I am honoured to have been asked by Sir James Foots, the President of the Congress Organising Committee, to open this, the 13th Congress of the Council of Mining and Metallurgical Institutions. Th

    Jan 1, 1986

  • AUSIMM
    Technical Change - The Impending Revolution

    It is a facet of modern-day life that change, even of a revolu- tionary nature, normally passes without comment. People have become so conditioned to continuous improve- ments in every aspect of their

    Jan 1, 1988

  • AUSIMM
    The Establishment and Operation of Queensland Alumina Limited

    The operation of a one tonne submerged combustion pilot plant for the recovery of copper from anode furnace and converter slags is described and the effects of variables discussed. Using coal as r

    Jan 1, 1978

  • AUSIMM
    Marketing of Mineral Products from Australian Mines

    I trust you know now or will know by the time you havecompleted your degree and added a little on-the-job experience,how to make the product from the mine you are working for. Butyou may not know the

    Jan 1, 1994

  • AUSIMM
    The Optimum Design of Large Open Pit Mines

    By Giannini LM, Carras S

    A fundamental problem in mine planning is that of determining the "optimum pit limit" of a mine. This optimum pit limit yields information which is considered essential in the evaluation of the eco

    Jan 1, 1986

  • AUSIMM
    Evaluation of Heavy Medium Cyclone Performance at the Hamersley Iron Mount Tom Price Concentrator

    By Gomm SA

    The Mount Tom Price Concentrator, which contains a heavy medium cyclone plant for beneficiation of the -6+0.5mm fraction of low grade iron ore, is described. Testwork was carried out on an opportun

    Jan 1, 1987

  • AUSIMM
    Design and Optimisation of Cadia Hill Open Pit, Cadia Valley Operations, Newcrest Mining Limited

    By F Pothitos, S Hewson

    The geological and geotechnical conditions at the Cadia Hill Open Pit are very complex. This complexity coupled with high mining rates has required significant technical input into the design and opti

    Jan 1, 2003

  • AUSIMM
    Ventilation Planning Study of the El Teniente Block Caving Mine in Chile

    By McPherson M. J

    This paper describes a major ventilation study for the expansion of the El Teniente mine operated by Codelco, Chile. El Teniente is one of the world's largest under- ground mines. The design e

    Jan 1, 1988

  • AUSIMM
    Electromagnetic Testing of Mine Winding Ropes û The Field Pattern of an Internal Broken Wire

    With the recent wider introduction of friction hoists of the Koepe type. for winding from depths of more than 3000 feet it has been found that failure by fatigue is the most common form of rope det

    Jan 1, 1971

  • AUSIMM
    Kinetics of Bubble-Particle Interaction, Surface Hydrophobicity and Interfacial Phenomena in Sulfide Mineral Flotation

    Kinetics of bubble-particle interaction, surface hydrophobicity and interfacial phenomena in sulfide mineral flotation are discussed in this paper. Results of the measurements of a bubble and mineral

    Jan 1, 2005

  • AUSIMM
    A Study of the Reaction between Lead Sulphate and a Number of Base Metal Sulphides

    By Wright S, Jorgensen F. R A

    The reaction between lead sulphate and a number of base metal sulphides (galena, sphal- erite, chalcopyrite and synthetic pyrrhotite was studied as a means of desulphurizing lead sulphate containin

    Jan 1, 1987

  • AUSIMM
    Structural Permeability and Fluid Flow in Fault-Fracture Meshes (ba60e8dc-e191-48ef-a87d-4149833572e0)

    IA )W cli',hla cn1cnt fault 7011(-s 0 11Cn cOrnprise a nrc,II of inrcIIinkc(I faults, cvtcnqonal shear and In]rck cxtcnsir>nal vein- fractures. Hydrothermal mineralisation localised around such s

    Jan 1, 1995

  • AUSIMM
    Automating Hoist Rope Inspection Processes

    By B Delaney

    For worker safety, mining companies are required to stop production and inspect hoist ropes. Visual inspection is generally done daily and EM inspection occurs every three to four months. During visua

    Jan 1, 2005