    Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation Remediation

    By Michael Arnold, Bob Faulhaber, Joe Nichols

    "Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam

    Jan 1, 2017

  • DFI
    Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing Methods

    By Juan M. Antorena

    A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a

    Jan 1, 1995

  • DFI
    Construction Of Effluent Outfall Diffusers For The Boston Harbor Project

    By Geoffrey D. Collins

    This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay

    Jan 1, 1994

  • DFI
    Design Parameter For Jacked Pile

    By Sugie Prawono

    Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr

    Jan 1, 1999

  • DFI
    Application Of, And Experience With, An Electronically-Controlled Hydraulic Piling Hammer ? 1 ? Introduction

    By D. Arentsen

    Changing environmental laws, new operating requirements and the increasing accuracy with which the bearing capacity of driven piles can be calculated have all led to the development of hydraulic pilin

    Jan 1, 1987

  • DFI
    Micropiles Prove Advantageous Over Drilled Shafts For Merchants Railroad Bridge Rehabilitation

    By Jeffrey R. Hill

    To extend the life of the Merchants Railroad Bridge crossing the Mississippi River in St. Louis, MO, the owner implemented a rehabilitation and reconstruction project. The Merchants Bridge provides a

    Jan 1, 2006

  • DFI
    Ladies And Gentlemen,

    By George Koenig

    I have been granted the outstanding privilege... and pleasure to introduce you this evening to the Grand-Duchy of Luxembourg and to tell you in a few words how this country came into existence, how it

    Jan 1, 1987

  • DFI
    An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - Introduction

    By F. Pagliacci

    Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste

    Jan 1, 2000

  • DFI
    Short Comparison Of The Determination Of Allowable Loads Of Steel H-Piles Following The Practice Applied In Different European Countries - Synopsis

    By L. P. Weber

    During the years 1983-1987, a research programme, jointly performed by the steel producers ARBED, British Steel Corporation, Peine-Salzgitter, Unimetal, and co-sponsored by the European Community for

    Jan 1, 1991

  • DFI
    The Challenges Of Construction In Karstic Limestone: Three Major Case Histories

    By Donald A. Bruce

    The construction of major structures in karstic limestone terrains poses difficult problems to designer and contractor alike. This reflects the inherent variability of such conditions, and also the si

    Jan 1, 2002

  • DFI
    Dynamic Monitoring And Analysis Of Pile Foundation Installations ? Introduction

    By Patrick J. Hannigan

    The pile foundation designer typically performs a subsurface exploration program and static pile capacity calculations before selecting a pile foundation type, length, and capacity. During constructio

    Jan 1, 1990

  • DFI
    A Cut And Cover In Stiff Clay In Eurre-France - Synopsis

    By R. Stenne

    This paper deals with a complementary soil investigation which being part of the contract helped understand the behavior of a softened clay and adjusted the design of a retaining structure accordingly

    Jan 1, 2000

  • DFI
    Base Grouted Piles - Mr. P. M Cashman, Independent Consultant

    By W. J. Kingwell

    My comments and questions are addressed to Mr. Troughton. It seems to me that the tests were very well tailored to determine long term effects on performance of bearing piles as groundwater pressures

    Jan 1, 1991

  • DFI
    Peak And Post-Peak Shear Strength Of Cement-Bentonite

    By Paul J. Axtell

    Self-hardening cement-bentontie (c-b) slurry walls were constructed as shear walls to stabilize the downstream slope of Tuttle Creek Dam near Manhattan, Kansas. The slope stabilization was required t

    Jan 1, 2010

  • DFI
    Diaphragm Walls, Recent Developments to Improve Reliability

    By A. Frits van Tol, Rodriaan Spruit, Jan H. van Dalen

    "Abstract In recent years, there have been major problems with deep excavations in urban areas supported by diaphragm walls. In some cases, like the fatal Nicoll Highway collapse in Singapore the qual

    Jan 1, 2014

  • DFI
    Dynamic Testing Results Indicator Pile Test Program --I-880 - Introduction

    By D. Michael Holloway

    The California Department of Transportation (CALTRANS) evaluated several pile foundation schemes for supporting the structures along the realignment of Interstate 880. The project replaces the double-

    Jan 1, 1995

  • DFI
    Tunnel Headwall Softeyes: Fiberglass Design Applications and Constructability Challenges

    By Shawna Munn, Jakub Hudler

    This paper outlines the use of tunneling headwall softeyes for transit construction projects in the Greater Toronto Area (GTA) over the past decade. Due to spatial constraints, tunnel boring machines

    Jan 1, 2018

  • DFI
    Recent Developments In Secant Bored Pile Wall Construction

    By D. E. Sherwood

    Recent developments in high torque hydraulic rotary rigs has lead to the construction of secant bored pile walls by rotary drilling methods in circumstances where earlier methods were difficult and in

    Jan 1, 1989

  • DFI
    Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case History

    By Christopher J. Pacitto

    This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe

    Jan 1, 2002

  • DFI
    Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial Soil

    By Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi

    "Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei

    Jan 1, 2014