    Extraction of Gold From a Carlin-Type Ore Using Thiourea

    By R. A. Pyper, J. L. Hendrix

    Laboratory leaching experiments were conducted to ascertain the effectiveness of acidic solutions of thiourea, CS(NH2)2, for dissolving gold from finely disseminated gold ores. The ore tested was from

    Jan 1, 1981

  • AUSIMM
    The Post-Mining Water Balance

    By A Watson

    We tend to overestimate the volume of water used to process ore and the evaporation from tailings and heap leach stockpiles. During mine operation, a significant portion of the water collected from on

    Jan 1, 2009

  • SME
    Application Of Fuzzy Set Theory To Rmr Classification For Weak And Very Weak Rock Masses

    By P. Roghanchi

    The Rock Mass Rating (RMR) system is an internationally recognized classification system that can be used for preliminary ground control design. The RMR system assigns quantifiable values to predefine

    Feb 27, 2013

  • SME-ICGCM
    Effect of Full-Extraction Underground Mining on Ground and Surface Waters A 25-Year Retrospective

    By Francis S. Kendorski

    Over the past 25 years, the present author has written with several co-authors a series of papers beginning with the landmark paper in the 1st International Conference on Ground Control in Mining in 1

    Jan 1, 2006

  • CIM
    Introduction to the Meliadine Project

    By M. Gaumont, F. Robichaud

    "Agnico Eagle Mines Limited (AEM) is a Canadian-based gold producer with operations in Canada, Finland and Mexico. In 2010, AEM produced its first gold bar in Nunavut, Canada as it started its Meadowb

    Jan 1, 2016

  • NIOSH
    OFR-84(7)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume VII - Rail Haulage Subsystem

    By C. B. Manula

    This report is volume 7 of an eleven-volume final report for a Grant completed by The Pennsylvania State University for the Bureau of Mines to develop a dynamic general purpose computer simulation mod

    Jan 1, 1974

  • AUSIMM
    Insights From Simulation of a CIL/CIP Circuit

    A model was developed of a CIL/CIP circuit for recovery of gold and silver. The model uses a simple two rate representation of the leaching kinetics. Parameters for the leaching kinetics may be simply

    Jan 1, 2004

  • DFI
    Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management

    By Mario Aiezza

    This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto

    Jan 1, 2002

  • ISEE
    Professional Steps in the Blasting Process

    By Mark William Withey

    "Blasting safety in surface mining is a necessary industrial goal. Proper techniques and disciplinesexercised during the blasting process enhance the probability of achieving that goal.The blasting pr

    Jan 1, 1995

  • AUSIMM
    Surface Tensions of Molten Heavy Metal Iodides and Their Relation to Sulphide Paragenesis

    The sulphides can be arranged in a series determined by the relative amounts of ionic and covalent bonding present. This series is similar to the paragenetic series common to most sulphide ore deposit

    Jan 1, 1956

  • TMS
    Solvent Extraction Of Precious Metals Using Thiodiglycolamide

    By Hirokazu Narita

    Keywords: solvent extraction, precious metals, thiodiglycolamide, rapid separation, hydrochloric acid The solvent extraction of some precious metals (Pd(II), Pt(IV), Rh(III) and Au(III)) and base m

    Jan 1, 2005

  • SAIMM
    EQS: A Computer Software Using Fuzzy Logic For Equipment Selection In Mining Engineering

    By A. Basçetin

    Equipment selection in mining engineering is one of the most important decisions that affects the mine design, production planning and economic parameters in open pit and underground mining. Mine plan

    Jan 1, 2006

  • AUSIMM
    Reclamation by Sluicing of Tailing Impounded in a Valley at Electrolytic Zinc Company of Australasia Ltd., Rosebery, Tasmania

    A unique sluicing process for recovering tailing impounded in a valley was developed by Electrolytic Zinc Company of Australasia Ltd., West Coast Mines, Rosebery, Tasmania.Earthmoving equipment could

    Jan 1, 1973

  • IMPC
    Maximising the Value of ‘A Wealth of Information’ (1e5cd2ab-37d3-481c-b69f-500fafd475e7)

    By Rob Morrison, Andrew Scott

    "Long before a modern mine commences operations it has already become a wealth of information. After start up, it can generate enormous quantities of data – especially with semi-automated data acquisi

    Jan 1, 2003

  • DFI
    Drilled Pile Design and Installation Challenges in an Urban Environment

    By Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran

    This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment

    Jan 1, 2018

  • AIME
    Brief History Of Metallurgical Practice In Cannon-Making With Particular Reference To The Cast-Iron Gun

    By Job Goostray

    IN THIS paper, as in so many other discussions of historical nature, there is little chance for original material and much has had to be rewritten from older papers, documents, accounts, reports, and

    Jan 3, 1925

  • NIOSH
    IC 8881 Minerals Data Source Directory

    The Minerals Data Source Directory is a compilation of descriptive information on the availability, content, and location of minerals data in the Federal Government. It is intended to assist Governmen

    Jan 1, 1982

  • SME
    Crud Processing Improvements Using ACORGA® CB - 1000 Crud Busting Reagent

    By T. McCallum

    Crud is a common concern in SX processes and is formed as a complex solid stabilized emulsion of aqueous and organic.1,3 Crud formation is highly dependent on the amount of solids entering the circuit

    Feb 27, 2013

  • NIOSH
    RI 7882 Tunneling Machine Research - Size Distribution of Rock Fragments Produced by Rolling Disk Cutters

    By Parviz F. Rad

    The Bureau of Mines used a linear cutting apparatus equipped with a 7-inch disk cutter to cut grooves in marble, limestone, granite, and quartzite under a normal force of 7,000 lb. The size distributi

    Jan 1, 1974

  • ABM
    Estudo Da Influência Da Massa De Escória E De Banho Na Desfosforação De Ferro-gusa Com A Termodinâmica Computacional

    By Anna Paula Littig Berger

    A remoção do fosfóro através do processo de desfosforação do ferro-gusa tem sido cada vez mais relevante, devido a influência que exerce de forma prejudicial as propriedades do aço e devido a extensão

    Aug 17, 2017