Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Discussion - Commercialization of eastern US oil shales — a review - Technical Papers, MINING ENGINEERING, Vol. 97, No. 12, December 1985, pp. 1381-1385By V. Rajaram
R.K. Leininger, N.R. Hasenmueller, and D.D. Carr The content of the paper by V. Rajaram does not fulfill the expectations of the title. But Rajaram submitted the article in October 1983, and he cou
Jan 10, 1986
-
Large Grinding Mill Bolted Joints – A Topic Of Concern (11a1f463-ada3-4cfb-90bc-0f7f4fabdaf0)By R. L. Guerguerian
Critical fasteners are described as they apply to the specification, manufacture, and assembly on large grinding mill bolted joints. The importance of adequate design methods, related joint diagrams
Jan 1, 2001
-
Using Metal-Tolerant Plants to Reclaim Mining WastesBy David R. Morrey
During the past 50 years, significant research has been performed in the ecology and physiology of plants that colonize soils containing elevated concentrations of heavy metals. Similar work has also
Jan 1, 1995
-
Reducing Mine Accidents By DesignBy J. H. Daniel
The reduction of accidents will play an ever increasing role in the mining of coal and hardrock ores as mining operations become more mechanized, the equipment becomes more costly and sophisticated, a
Jan 1, 1991
-
“They Want to Dig a 100-Foot Hole in Front of My House for Two Years!” - Community Mitigation and Outreach for DC Water’s First Street TunnelBy Carlton M. Ray, William P. Levy, Thomas Lindberg
"The District of Columbia Water and Sewer Authority (DC Water) is implementing its $2.6 billion DC Clean Rivers Project to reduce combined sewer overflows to the District’s receiving waterbodies and m
Jan 1, 2016
-
TECHNICAL NOTE - Accommodating the Land Use Planning Provisions of the Surface Mining Control and Reclamation ActBy L. W. Saperstein
Public Law (PL) 95-87 contains explicit demands for land use planning in its reclamation and designation sections. Both sections require recognition of local land use plans; however, they are not well
Jan 12, 1983
-
Evaluating Ventilation Parameters For Extended-Cut Mining – Preprint 97-148By J. P. Rider
The number of extended cut mining systems has increased significantly in coal mines over the last decade, and there is a constant push to extend the face ventilation systems to even greater setback di
Feb 24, 1997
-
Increasing Coarse Particle Recovery Using The Flsmidth Selective Froth Recovery SystemThe recovery of coarse particles has been widely recognized as being limited by the froth in mineral flotation. In response to this, FLSmidth has developed the Selective Froth Recovery (SFR) System.
Feb 27, 2013
-
La Ciénega – A New Gold Mine in MexicoBy F. Grajales Muñoz
The Ciénega project, now under construction by Peñoles group, is located in the mountains of northwest Durango, Mexico. The gold and silver deposits are found in a 4-km (2.5mile) long system of veins.
Jan 1, 1994
-
Rational Design Of Yield Pillars: Improved Understanding Of Yielding MechanismBy K. T. Lee, M. U. Ozbay, M. D. G. Salamon
Design of yielding chain pillars in deep coal longwall mines is not as well established due mainly to the lack of knowledge in the behavior of coal pillars in the post-peak regime. This study shows t
Jan 1, 2001
-
Prediction Of Geology For Tunnel Design And ConstructionBy Charles S. Robinson
INTRODUCTION Geology, the science of the earth, is the fundamental science in the construction of a tunnel. The approximate site of a tunnel is determined by its purpose. The geology of the tunnel
Jan 1, 1997
-
Mine Truck ServicingBy T. W. White
One of the objectives of today's mine superintendent is to increase his equipment availability. To this end we have seen improved scheduling procedures, preventive maintenance programs and extens
Jan 1, 1972
-
Construction Management Saves Time, Money and Improves Quality During Design and ConstructionBy Behrouz Tehrani
The size, complex issues, and requirements to construct large number of tunnels, for a single project, expeditiously, and without exceeding the overall project budget, a program Construction Managemen
Jan 1, 2008
-
Workshop Attendees Compare Ore Modeling and Mine Planning Software SystemsBy Betty Gibbs
The Ore Body Modeling and Mine Planning Worshop, sponsored by the Society for Mining, Metallurgy, and Exploration, Inc. (SME), was held Feb. 22-24, 1991 before the SME Annual Meeting and Exhibit in De
Jan 1, 1991
-
Heartland Corridor TunnelsBy Frank P. Frandina, Michael J. Loehr, Paul E. Gabryszak
The Heartland Corridor Clearance Improvement Project is part of a regional Public-Private initiative to allow double stack container trains a direct route from the Port of Norfolk through Virginia, We
Jan 1, 2007
-
Underground Mining: A Challenge to Established Open-Pit OperationsBy Timothy D. Arnold
Barrick Gold’s Bullfrog underground mine, near Beatty, NV, was established as an after-thought to the main open pit. As open pit ore dwindles, the underground mining became increasingly more importan
Jan 1, 1996
-
Dewatering, Interpretation Of Landform, And Installation Of Steel Arches For Reinforcement Of Tunnel SectionBy D. J. Gilbert
As a preventive action, the geotechnical department at the mine analyzed the original topography overlying a conveyor tunnel at the mine. Several dewatering drains were installed to intercept water co
Jan 1, 2011
-
Conversion Of Fixed Speed To Variable Speed For Sag Motors At The Barrick Goldstrike MineBy J. Hebert, J. Donnelli, J. Sedey
Installation of a Load Commutated Inverter (LCI) provides an economical method for conversion of a Fixed Speed Semi-Autogenous Grinding Mill into one with variable speed, qualities. Though capital int
Jan 1, 1999
-
Tunnel Cost ModelBy Charles H. Minott, Michael J. Markow, Robert D. Wyatt, Fred Moavenzadeh
The substantial investment in tunnels anticipated in the next twenty years has focused new attention on the economics of tunnel construction itself and on some costly problems associated with undergro
Jan 1, 1974
-
Correlations of Grinding Mill Structural Design ProceduresBy V. Svalbonas
When the Trelleborg Divisions of Boliden Allis and Mineral Processing Systems (MPSI) merged, a unique opportunity occurred for two independent mill fabricators to compare design pro¬cedures and the re
Jan 1, 1992