Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Solid Phase Characterization For Metal Mine Waste Drainage Quality Prediction

    By K. Lapakko

    Several static tests estimate the capacity of mine waste to produce and neutralize acid and are used as tools for predicting metal-mine waste drainage quality. Various methods and their accuracies ar

    Jan 1, 2003

  • SME
    Actual vs. Baseline Tracking During TBM Tunneling In Highly Variable Glacial Geology

    By Ulf G. Gwildis

    The Bright water Conveyance System includes 21 km of tunnels mined by two earth pressure balance Tunnel Boring Machines (TBMs) and two slurry TBMs. The probabilistic baseline approach defined in the G

  • SME
    Development Of An Automated Drill And Blast System

    By Dennis P. Martin, Michael M. Fitz, James E. Friant

    Methods for reducing the cyclic nature of drill and blast tunneling operations have been long needed. A miniature blasting system using 10 mm (.375 in.) holes, 0.91 m (36 in.) deep, and blasting only

    Jan 1, 1989

  • SME
    Stability Prediction And Performance Of Highwall Steepening In Weak Rock

    By D. R. Brox, J. Levell

    The Montana Tunnels Mine was mined out to a depth of 900 feet at the end of 1999. The first signs of instability were recognized in 1996 along the upper slope area of the northwest sector when the pit

    Jan 1, 2001

  • SME
    Cincinnati Features Aggregates and Industrial Minerals Programming

    The 2003 SME Annual Meeting and Exhibit will take place Feb. 24-26 in Cincinnati, OH. The meeting will feature a host of special symposia and programming geared toward the industrial minerals and agg

    Jan 1, 2003

  • SME
    Current Status of Federal Regulations and Rulemaking in Governing Subsidence Due to Underground Mining

    By Dermot Winters

    The Surface Mining Control and Reclamation Act (SMCRA, or the Act) was enacted on August 3, 1977. The Act was written, in part, to put an end to uneven environmental standards and to establish minimum

    Jan 1, 1986

  • SME
    Hydrologic Assessment Of Waste Rock Stockpiles: A Case Study From Ajo Mine, Arizona

    By A. L. Williamson, G. Savci

    Hydrologic assessments of existing and proposed waste rock stockpiles (WRS) are typically required for application of operating and closure permits at mine sites. The results of these assessments can

    Jan 1, 2002

  • SME
    The role of pre-conditioning in mitigating seismic hazards – an innovative method for future caving operations.

    By James Lett

    The role of pre-conditioning in a caving operation has multiple benefits, ranging from assisting with improved caveability, normalising fragmentation and improving draw point hang-up frequency. At New

    Apr 26, 2022

  • SME
    Horizontal Stress And Longwall Headgate Ground Control – Preprint 97-187

    By Thomas P. Mucho, Dennis Dolinar, Christopher Mark

    Horizontal stresses are caused by global plate tectonic forces. During 1995 alone, they were largely responsible for closing two U.S. longwall mines. This paper presents six case histories from Penns

    Feb 24, 1997

  • SME
    Paragenesis And Metal Associations In Interior Alaska Gold Deposits: An Example From The Fairbanks District (78a5358a-5cda-49ae-b93d-ba8558df1a55)

    By K. Severin, B. Flanigan, P. Marion

    “Plutonic-related” gold deposits in Interior and SW Alaska (Tintina Gold Belt) vary significantly in size, grade, vein/deposit morphology, depth of emplacement, distance from causative pluton and meta

    Jan 1, 2000

  • SME
    Reducing Mine Accidents By Design

    By J. H. Daniel

    The reduction of accidents will play an ever increasing role in the mining of coal and hardrock ores as mining operations become more mechanized, the equipment becomes more costly and sophisticated, a

    Jan 1, 1991

  • SME
    Development And Large-Scale Testing Of Innovative Tunnel Support Systems

    By Robert M. Semple, Harvey W. Parker

    INTRODUCTION Two promising innovative tunnel support systems are being developed by the Civil Engineering Department of the University of Illinois. One of these is a lining which can be placed by a

    Jan 1, 1997

  • SME
    Dewatering for the Lenox Avenue Subway Reconstruction Project

    By Paul C. Schmall, Thomas Tuozzolo, Arthur B. Corwin

    The Lenox Avenue Reconstruction Project involved the excavation and replacement of 750 m (2,500 ft) of deteriorated subway invert concrete, 5 to 7 m (15 to20 ft) below water table in very permeable gr

    Jan 1, 2001

  • SME
    Comparison of Underground Coal and Trona Mine Seismicity

    By W. G. Pariseau

    "BACKGROUND Strata mechanics of three underground coal mines in central Utah were recently studied using a specialized finite element technique [1, 2, 3, 4]. The purpose of these studies was to examin

    Jan 1, 2017

  • SME
    A Tunnel Boring Machine at the South Pole

    By Michael R. Walsh, John H. Wright, Eivind B. Jensen

    A tunnel boring machine (TBM) was designed and built at the Cold Regions Research and Engineering Laboratory in 1992 for use in Antarctica. The TBM system was tested at the South Pole where a 120-m lo

    Jan 1, 2001

  • SME
    Utilizing Paste Technology For Reclamation Of The Ute-Ulay Upper Tailings Impoundments, Lake City, CO - Project Background

    By T. Tafi

    The Ute-Ulay project area is located approximately five miles west of Lake City, in Hinsdale County, Colorado. The Ute-Ulay Mine site is approximately one mile east of the project area. The elevatio

    Jan 1, 2011

  • SME
    Adaption of Protective Linings for Sewer Tunnels to Project Needs

    By Gilles Recher, Jörg Riechers, Albert Lueghamer

    "INTRODUCTIONIn view of a global trend towards urbanization, more and more trunk sewers and combined sewer overflow tunnels (CSO) with medium to large diameters and the corresponding link sewers are c

    Jan 1, 2016

  • SME
    Short Tunnels with Shallow Cover

    By David Smith

    Construction of a new transportation link frequently requires crossing under an existing highway or railroad. Although traffic diversions may permit a cut and cover structure to be built, ‘zero impact

    Jan 1, 2005

  • SME
    Increased Prodcution Planned at Anshan Iron and Steel

    The Anshan Iron and Steel Co. (AISC) broke its steelmaking design capacity in 1978, bringing its total production of steel products to 6.86 Mt. Located south of the industrial city of Shenyang, Liaon

    Jan 3, 1980

  • SME
    Optimizing the "Resource-To-Market" Supply Chain by Embracing Variability

    By D. Spitty

    Mining companies often have many disparate systems and repositories of data in their organization for planning and scheduling outbound mining supply chains. To optimize ore quality, throughput, transp

    Feb 23, 2014