Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Direct determination of failure surfaces in earth slopes

    By S. L. Huang

    The location and shape of potential failure surfaces in soil slopes were directly determined based on the stresses induced in the soil mass and the strength of the soil itself. Stress calculations wer

    Jan 1, 1989

  • SME-ICGCM
    A Test Of Predictive Numerical Models To Simulate Entry Design Changes Using Field Measurements From A Longwall Mining Gateroad

    By Jennifer Riefenberg

    Research efforts by the U.S. Bureau of Mines include running a series of displacement-discontinuity, boundary-element models to simulate the gateroad design at an underground coal mine in northwestern

    Jan 1, 1993

  • SME-ICGCM
    Mine-Wide Monitoring Applications In Ground Control Research

    By David Conover

    Technological advancements in electronic sensors and mine-wide monitoring systems have improved remote monitoring and analysis of underground mining information. The effective use of . these systems f

    Jan 1, 1990

  • SME-ICGCM
    Investigating Abutment Load

    By Ihsan Berk Tulu

    In the Analysis of Retreat Mining Pillar Stability (ARMPS) program, the magnitude of the abutment loading adjacent to a gob area is calculated using an ?abutment angle? concept. The extent of the abut

    Jan 1, 2012

  • SME-ICGCM
    Birth Of A Longwall-Initial Planning To Post-Subsidence Mitigation

    By E. D. Doney

    The Kerr-McGee Coal Corporation's Galatia Mine's first longwall mining system was implemented on May 3; 1989. Start-up of the longwall face represnted the successful conclusion of an effort

    Jan 1, 1990

  • SME-ICGCM
    Realistic Design Of Ground Control Based On Geotechnical Data Obtained During Mine Development

    By Kot F. Unrug

    In the premining stage of engineering design, the only available data are obtained from core drilling. It is often not sufficient for a realistic design of strata control. During the development, an a

    Jan 1, 1994

  • SME-ICGCM
    Subsidence monitoring at a shallow partial extraction room-and-pillar mine in midwestem United State

    By Yoginder P. Chugh

    Subsidence may be observed above partial extraction shallow room-and-pillar mines where the coal seam(s) is associated with weak and thick claystone in the floor. This paper presents results of subsid

    Jan 1, 1989

  • SME-ICGCM
    An analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar mining

    By W. M. Pytel

    The applicability of the beam theory in analysis of roof- pillar-weak floor interaction in partial extraction room-and-pillar mining is presented. The mine structure is modeled as an equivalent multi-

    Jan 1, 1989

  • SME-ICGCM
    The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case Study

    By A. W. Khair

    This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan

    Jan 1, 1986

  • SME-ICGCM
    Rib Support Innovation At Daw Mill Colliery (a22a0861-1502-4d3d-a2cd-8a6ba0c13271)

    By Jon Bowler

    Daw Mill Colliery, UK Coal, near Coventry in England, mines the Warwickshire Thick Seam at 800 m/2500 ft depth using longwall retreat with gateroads supported by rockbolts. Over the last eight years

    Jan 1, 2009

  • SME-ICGCM
    Planning And Design For Barrier Pillar Recovery Three Case Histories

    By David A. Newman

    Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu

    Jan 1, 1995

  • SME-ICGCM
    Roof Control Analysis In North River Mine

    By Mike Watts

    Since the first longwall panel development started in the new mining, (Southern) area, a number of roof falls have occurred in L1 and L2 gate-entries. The longwall was delayed for a total of two month

    Jan 1, 2000

  • SME-ICGCM
    Direct Laboratory Tensile Testing Of Select Yielding Rock Bolt Systems

    By John D. VandeKraats

    Yielding rock bolt support systems have been developed to accommodate ground movement in shifting ground such as in coal operations; in creeping ground such as salt, trona, and potash; and in swelling

    Jan 1, 1996

  • SME-ICGCM
    The Use Of Rim- To Detect Geologic Anomalies In The Clarion Seam

    By M. Craig Miller

    As the trend continues in the U. S. toward inceased capital investment in longwall mining equipment and wider panels. the risk also increases for gotential financial and production loses due to undete

    Jan 1, 1990

  • SME-ICGCM
    Evaluation of Rock Excavation Technologies for Seismically Active Mines

    By S. Paul Singh

    "The long-term viability of seismically active and/or deep mining operations hinges upon the industry's ability to maintain profitability in a climate of increasingly difficult conditions, escalating

    Jan 1, 2010

  • SME-ICGCM
    A Roof Quality Index For Stone Mines Using Borescope Logging

    By John Ellenberger

    The National Institute for Occupational Safety and Health (NIOSH) has collected pillar and span data at 34 stone mines in 10 states to develop pillar and roof span design guidelines for underground st

    Jan 1, 2009

  • SME-ICGCM
    Monitoring Mobile Roof Supports

    By Kenneth E. Hay

    Researchers from the U.S. Bureau of Mines conducted a field study to assess the safety of remotely controlled mobile roof supports (MRS) in a retreat pillar mining operation, Data were collected to pr

    Jan 1, 1995

  • SME-ICGCM
    Numerical simulation of coal pillar loading with the aid of a strain-softening finite difference model

    By A. T. Iannacchione

    Numerical simulation of coal pi1lar loading has traditionally been a difficult task due to the unique and highly variable properties of coal and the inability of numerical procedures to duplicate thes

    Jan 1, 1989

  • SME-ICGCM
    Comparison Of Empirical, Analytical, And Numerical Methods Of Pillar Design And The Development Of A Site Specific Pillar Formula

    By Vincent A. Scovazzo

    Many accepted and useful methods have been developed and used for pillar design. Each method has its own particular strengths and weaknesses. Three methods addressed in this paper are; empirical, anal

    Jan 1, 1995

  • SME-ICGCM
    Computer Modeling Of Rock Mass Geomechanic State In Longwall Design

    By V. D. Jalevsky

    A new methodology of an experimental-analytical approach has been developed. It is used in building an information geomechanic monitoring system for the modeling of geomechanic processes during coal s

    Jan 1, 1996