Ground Support Systems for Heavy, Squeezing Ground at Burgin MineBy Donald O. Rausch, William E. Hawkes, Odin Jr. Strandberg
INTRODUCTION Kennecott Copper Corp.'s Tintic Div. Burgin mine is a 725 t/d (800 stpd) lead-zinc producer, located in the east Tintic mining district, 5.6 km (3.5 miles) east of Eureka, and 130
Jan 1, 1982
-
Achieving a Great Start-Up: Action Plan to Maximise Your Chances of SuccessBy S. Bellec, P. Champagne, J. Châteauneuf, A. Berton, S. Fortier
"The start-up of new plants, extending from the commissioning of equipment to the production ramp-up, is a critical period where the processing circuit operation must be done in a structured and well
Jan 1, 2016
-
Centrifuge Units for Gravity Separation - An UpdateBy André R. Laplante
"This presentation reviews three continuous centrifuge separators, the Falcon-C, Kelsey Jig and Multi-Gravity Separator, two units with possible synergies with centrifuges, the In-Line Pressure Jig an
Jan 1, 2000
-
Evaluation Of Gas-Enhanced Foam For Suppressing Coal Mine FiresBy M. A. Trevits, A. Ozmet, A. C. Smith, J. B. Walsh, T. P. Mucho
Improvements in remote fire fighting technology are needed to reduce miner exposure to the dangers of fires and possibly save the lives of those who may become trapped. The National Institute for Occ
-
Use Of Sintered Pellets In Production Of High Carbon Ferro ChromeBy C. N. Harman, N. S. S. Rama Rao
Production of Ferro-alloys through submerged electric arc furnace involves use of electric power as one of the major inputs. Hence the production by this power intensive process can be made economical
Jan 1, 2007
-
Training to Process Analysis Methods using a Gold Leaching SimulatorBy Jessica Egan, Daniel Hodouin, Mohammed Reza Khalezi, Steve Bellec, Claude Bazin, Carl Duchesne
"A model for gold leaching was developed and implemented into a simulator. The simulator uses a description of the ore that is based on the mineral composition and precious metal content. The model ac
Jan 1, 2008
-
Numerical Modelling of Confinement Effects on Mechanical Properties and Failure Pattern of Brittle Rocks in Triaxial Tests with PFC3DOne of the most important goals of the experiments is to determine deformation and strength of the rock specimen under applying triaxial load, the status of failure condition is one of the subjects wh
Nov 25, 2010
-
Lateral Capacity Of Rigid Piles In Clays Based On Earth Pressure Concepts - SynopsisBy S. Narasimha Rao
Significant amounts of lateral load may act on pile foundations supporting structures such as transmission line towers, tall structures, bridge abutments, offshore platforms, quay wails, harbour struc
Jan 1, 1996
-
Evaluation Of Ct-Based Coal Washability Analysis System Under Simulated On-Line ConditionsBy J. D. Miller, C. L. Lin
Appropriate software and hardware necessary to adapt a x-ray CT analyzer for determination of coal washability has recently been developed and sucessfully tested for well characterized samples under l
Jan 1, 2001
-
Application Of Augered, Cast-In-Place Displacement (ACIPD) Piles In New York CityBy Willie M. NeSmith
Conventional augered, cast-in-place (ACIP) piles were introduced into the New York City area as a result of the damage to existing structures caused by pile driving operations. ACIP piles are often sp
Jan 1, 2004
-
Fully-Grouted, High-Strength, Mechanical Shell Tensioned Bolt Improves Pittsburgh Seam Primary Roof SupportBy Daniel Su
Approximately 90% of the primary roof bolts used in CONSOL?s Pittsburgh seam coal mines is 2-piece, 8-foot long, 7/8? (or ¾?), high-strength, resin assisted, mechanical shell tensioned bolt. The remai
Jan 1, 2007
-
Geostatistical Determination of Production Uncertainty: Application to Pogo Gold ProjectBy J. A. McLennan
Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo
May 1, 2004
-
Critical Parameters In The Dump And Heap Leaching Of Gold, Silver, Copper And Uranium: Permeability, Solution Delivery And Solution RecoveryBy Manuel R. Lastra
Critical to successful dump and heap leaching for gold, silver, copper and uranium are factors such as permeability, solution delivery to the ore, and solution recovery. This paper deals with possible
Jan 1, 1984
-
Innovative use of SMART Cable Bolt Data: Numerical - Back Analysis for Interpretation of Post Failure Rock Mass Properties Post-By Jason J. Crowder
Presentation Outline ? Introduction ? Costs of ground support and rehabilitation ? Why post-failure rock mass properties are necessary ? The Rock Mechanics Problem ? Present State of Modelling a
May 1, 2006
-
The Influence Of The Quality Of Ferrosilicon On The Rheology Of Dense Medium And The Ability To Reach Higher Densities - IntroductionBy H A. Myburgh
The beneficiation of heavy metal oxides, such as iron ore, is usually performed with heavy medium separation in cyclones, static baths and lately with Larcodems. Atomized ferrosilicon is most suitable
Jan 1, 2006
-
Mineral Deposits, Time And EvolutionSequential and evolutionary changes through time are recognizable in many, perhaps most major families of ore deposits and their geological environments. These changes are additional useful indicators
Jan 1, 2013
-
Ventilation planning at Energy West?s Deer Creek MineBy L. Tonc
In 2004, the engineers at the Deer Creek Mine located near Huntington, Utah initiated the ventilation planning to exploit a remote area of the mine?s reserves. This area was located under a mountain w
Jan 1, 2009
-
Shaft Construction in Toronto Using Slurry WallsBy Vince Luongo
PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located just north of Toronto, Ontario, Canada will see the construction of a tunnel extending a
Jan 1, 2007
-
Design And Construction Aspects Of A Deep Basement In Dublin - SynopsisBy Philip J. Daynes
As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase
Jan 1, 2003
-
Fire Safety Design for the New South Ferry Terminal Project in the New York City SubwayBy J. Greg Sanchez
The New South Ferry Terminal in the New York City Transit system represents an important milestone for the city. This is the first station designed and built in the 21st century. The design of the fir
Jan 1, 2008