Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Plant Improvement and Cost Reduction at the Great Boulder Proprietary Gold Mines LimitedBy Harris J. W
The treatment plant at The Great Boulder Proprietary Gold Mines Limited was designed and erected by Chas. Ruwolt Proprietary Limited in 1934 to mill 12,000 short tons per month. The flow sheet called
Jan 1, 1955
-
Revolutionizing Australia’s Large Underground Infrastructure Projects with Digital Engineerin - NAT2024By Elnaz Saminfar, Jae Bateman, Eric Westergren, Mark Trim
This paper presents a case study of two major Australian infrastructure projects that used digital engineering to facilitate design delivery: WestConnex Project (Rozelle Interchange), and Sydney Metro
Jun 23, 2024
-
Geochemical mapping of carbonate terrainsBy T. Lenarcic, R. Svrkota, J. M. McNeal, E. Prohic, S. Pirc
Paper presented at the 28th International Geological Congress held in Washington DC, July 1989 (International geochemical mapping sessions). Surface drainage samples, the usual media employed in mappi
Jul 1, 1991
-
Freeport McMoran El Paso Refinery Steam ControlBy Bradford C. Wesstrom, Ricardo Parra
The Freeport McMoRan El Paso Refinery uses co-generation to produce some of its electricity and all of its steam. This paper will cover the operation of the co-generation plant natural gas turbine at
Jan 1, 2019
-
Design And Preliminary Investigations For Deep Foundations Of The Charleroi Locks River Wall Project, Monessen, PennsylvaniaBy Brian H. Greene
The U.S. Army Corps of Engineers, Pittsburgh District, is in the final phases of modernizing the locks and dams on the Monongahela River. One facet of this modernization is to replace the existing Lo
Jan 1, 2006
-
The plasma manufacturing of titania pigment and nano-titania in a pilot plant - SynopsisBy J. T. Nel
The establishment of a pilot plant for the continuous production of titania pigment and nano-titania is discussed. The plant was designed, constructed and operated on the Necsa site. The TiO2 producti
Jan 1, 2010
-
Melt Extraction of Gold Fibers and Precious Metal Doped Fibers and Preparation of Porous Gold Fiber StructuresBy Olaf Andersen
Crucible melt extraction yields short metal fibers with eqivalent diameters as low as 50 µm from almost arbitrary metals and alloys. Highly porous components can be made from such fibers by suitable d
Oct 1, 2003
-
Ground Motion Characteristics in an Underground Burst-Prone Coal MineCoal bursts are one of the least understood yet the most critical hazards in underground coal mines. The ground motions induced by seismic events can trigger unstable failure of coal and rock mass and
Jan 7, 2020
-
Vale Inco?s international search to curtail diesel emissionsBy J. S. Stachulak
The Diesel Emissions Evaluation Program (DEEP), a research consortium formed in 1997 by Canadian mining companies, labour unions, and provincial and federal government departments, completed its work
Jan 1, 2009
-
Bulk Sampling of Complex Gold Deposits - Material Characterisation and Program Design and ManagementBy I M. Platten, Y Xie
Complex gold deposits are generally characterised by variable geometries, strong structural controls on grade distribution and a high-nugget effect. The use of diamond drilling and fire assays in this
Jan 1, 2008
-
Economic Geology of the Wolgan Coking Coal Deposit, Western Coalfield, N.S.W., AustraliaBy Graylin R. K, dea T. R, O&apos
The Wolgan Seam of the Upper Permian IlIawarra Coal Measures of the Western Coalfield of New South Wales consists of high volatile, low sulphur, medium hard coking coal with high fluidity. This seam,
Jan 1, 1980
-
Epithermal Vein Mineralisation and Alteration, Waiotahi Valley, ThamesBy D S. Clarke, K B. Sporli
The Thames Goldfi.eld has been a major gold resource in the west of the Coromandel Peninsula, New Zealand, with the Waiotahi quartz vein system forming a large part of the field. Mineralisation is hos
Jan 1, 1991
-
Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill MaterialsBy E. Fried
Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa
May 1, 2007
-
A First Step in Developing Standing Roof Support Design Criteria Based on Ground Reaction Data for Pittsburgh Seam Longwall Tailgate SupportBy Thomas Barczak
Roof support systems are designed for roof control to prevent unplanned falls. It sounds logical and has been the conventional thinking in support design since supports were first installed. In orde
Jan 1, 2008
-
Meeting The Reduced Availability And Rising Costs Of Electrical Power: Anglo Platinum Ventilation And Cooling Strategies - SynopsisThe reality of rising electrical power costs and the haunting prospect of decreasing electrical power availability are a threat to the growth of new projects and expansion programmes that could negati
Jan 1, 2011
-
Mining Methods at Mount Morgan LimitedThis paper gives a general description of mining operations at the Mount Morgan Open Cut. Certain features such as blast hole diamond drilling, which may be of particular interest, have been described
Jan 1, 1952
-
Treatment of Acid Mine Drainage through Chemical PrecipitationBy Carin Laubscher, Francis W. Petersen, Jaap P. Smit
"Waste streams, such as acid mine drainage, are often characterised by low pH values and high concentrations of heavy metals, dissolved solids, calcium and sulphates. Although lime remediation effecti
Jan 1, 2003
-
The Market & Cost Environments For Bulk FerroalloysBy Andrew Jones
This paper discusses the worldwide market and cost environments for the bulk ferroalloys namely manganese alloys (ferromanganese, silicomanganese), ferrosilicon and ferrochrome (high-carbon ferrochrom
Jan 1, 2007
-
From Tribulation to Triumph – Flotation Improvements at the New Lac des Iles ConcentratorBy Tom Olsen, Tom Ohrling, Peter Taggart, Chris Martin
"North American Palladium commissioned the new concentrator at the Lac des Iles mine in the summer of 2001. The 15,000 tonnes per day mill replaced the existing 2,400 tonnes per day facility, as part
Jan 1, 2003
-
Comparison among the Conventional Fully-Grouted Bolt, Combination Bolt, and One-Step Bolt Using Numerical ModelingBy Andre Zingano
The objective of this paper is to compare the behaviors of different types of roof bolts: (1) One-Step Bolt (OSB), (2) Fully grouted Bolt (RB), (3) Combination Bolt (CB), and (4) Torque tension Bolt
Jan 1, 2007