Centrifuge Modeling of Temperature Effects on the Pullout Capacity of Energy Piles in ClayBy John S. McCartney, Ismaail Ghaaowd
This study presents the results from centrifuge modeling experiments performed to understand the effects of temperature changes on the pullout capacity of scale-model energy piles embedded in normally
Jan 1, 2018
-
Ground Improvement for the Distressed Earth Bund Using Stone Column - A Case StudyBy M. Kumaran, A. Vetriselvan, A. Purantharan
"This paper presents a case history of evaluating the stability of a distressed earth bund and rectification measures carried out. A 5.45 km long, 7m high earth bund for drinking water storage was con
Jan 1, 2017
-
Final Report – Workshop on Quality Assurance for Post-Grouted Drilled ShaftsBy Mary Ellen Bruce Large
"In partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC), Deep Foun
Jan 1, 2016
-
Workshop on Quality Assurance for Post-Grouted Drilled ShaftsBy Mary Ellen Bruce Large
"INTRODUCTIONIn partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC
Jan 1, 2016
-
Field Tests Of Soft Clay Stabilized By Stone Columns In Coastal Areas In ChinaBy Han Jie
The results of full scale plate load tests on stone columns on soft clay in coastal areas are presented in this paper. Four load tests were made, two of which were performed on the ground treated with
Jan 1, 1991
-
-
Design and Construction of Mixed Ground Working Platform for a CCR Surface ImpoundmentBy Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste
An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D
Jan 1, 2019
-
Effect Of Pressurized Drilling Methods On The Lateral Load Capacity Of Drilled Shafts - A Practical Insight And An Analytical ApproachBy Özgür Bezgin
This paper presents observations on the installation of drilled shafts from two construction projects and an academic study with experimental and analytical parts. The construction projects involved t
Jan 1, 2009
-
Design Of Drilled Shafts Supporting Sound WallsBy Ke Yang
Drilled shafts are widely adopted as the foundation for sound walls. However, there has been a lack of uniformity in design and analysis methods and design criteria, in terms of factor of safety again
Jan 1, 2007
-
Load In A Drilled Foundation. Where Did It Go And When Did It Get There?By Walter E. Vanderpool
Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.
Jan 1, 2004
-
Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And StationsBy Marlion T. McQuinn
This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys
Jan 1, 2006
-
-
Modelling For Consolidation Around The Pile TipBy Emöke Imre
A point-symmetrical linear coupled consolidation model with displacement boundary condition is suggested for the description of the consolidation around the pile tip after pile penetration. Analytical
Jan 1, 2002
-
The Type Of Wharf Structure On Soft Soil With Undulating Weathered Rock BedBy Sun Shao Xian
The Port of Shekou is situated at Shenzhen Bay on the east side of the Pearl River estuary. Geological condition of the site is quite complicated. On top of the sea bed, there is a layer of soft silt
Jan 1, 1991
-
Safety And Economics Of Working Platforms – A Uk PerspectiveBy David Corke
The paper presents the development of Federation of Piling Specialists (FPS) calculation of rig track loading, the production of the Building Research Establishment document “Working platforms for tra
May 1, 2022
-
250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group TechnologyBy Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni
"Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity
Jan 1, 2014
-
Effects Of Helical Anchor Geometry On Long-Term Performance Of Small Wind Tower Foundations Subject To Dynamic LoadsBy Amy B. Cerato
The application of this study is to use helical anchors as a foundation system for small wind tower (1 ? 10 kW) guyed cables. Helical anchors are currently used to anchor guyed cables of telecommunic
Jan 1, 2008
-
Lateral Capacity Of Rigid Piles In Clays Based On Earth Pressure Concepts - SynopsisBy S. Narasimha Rao
Significant amounts of lateral load may act on pile foundations supporting structures such as transmission line towers, tall structures, bridge abutments, offshore platforms, quay wails, harbour struc
Jan 1, 1996
-
Examples Of The Use Of Temporary Works Soil Nailing In The UK And IrelandBy Martin J. Pedley
The use of soil nailing has grown steadily in the UK over the last 15 years and it has recently become more popular in the Republic of Ireland. This paper presents three soil nailing temporary works c
Jan 1, 2000
-
High Capacity Barrettes In A Region Of Old Underground QuarriesBy F. Schlosser
The extension of Montparnasse Station in Paris required the construction of supports of very high unit capacity to support a particularly rigid super-structure. The majority of the site is characteriz
Jan 1, 1989