Design And Construction Of The Lenihan DAM Outlet Tunnel And ShaftBy Hemang Desai
A damaged outlet pipe beneath Lenihan Dam has restricted reservoir discharges, severely constraining the owner?s groundwater recharge program. The solution, a new outlet pipeline through the dam?s rig
-
The Ivar Project - An Uncommon, Everyday TBM TunnelBy Yngve Jordal, Sverker Hartwig
The IVAR Project is Norway's largest sewer project presently under construction. One part of it is an 8.1 km (26 575 ft) long, 3.5 m (11 ft 6 in.) diam tunnel, bored in one year. The tunneling pr
Jan 1, 1991
-
In-mine study of high-expansion firefighting foam - SME Transactions 2010By R. S. Conti, M. R. Krump, C. P. Lazzara Ph. D., R. L. Derick, L. L. Chasko
A mine fire is one of the most challenging safety issues facing a mine operator and can occur at any location underground. The National Institute for Occupational Safety and Health (NIOSH) and the Twe
Jan 1, 2010
-
Results Of Instrumentation And Observation Of A Tunnel In Bedded Rock With High Residual (In Situ) StressesBy John D. Morton, J. H. LaVerne Palmer, Douglas J. Belshaw
An extensive programme of ground instrumentation and observation was carried out for the West Duff in Outfall Sewer tunnel project prior to and during construction, to establish the performance charac
Jan 1, 1979
-
Analysis Of Support And Strata Reactions In A Bump-Prone Eastern Kentucky Coal MineBy J. C. Zelanko
The U. S. Bureau of Mines conducted a multi-faceted geomechanics research project at a bump-prone longwall coal mine in eastern Kentucky. This mine presented a unique opportunity to study coal mine bu
Jan 1, 1991
-
Plant-Site Evaluations Of The OPSA System For On-Line Particle Size Measurement From Moving Belt Conveyors (a2c80e29-57fc-42d5-930c-7b75b81ed0dc)By C. L. Lin
The image-based On-line Particle Size Analyzer (OPSA) system has been developed at the University of Utah to measure particle size distributions under plant conditions where overlapped and segregated
Jan 1, 1999
-
Development, Validation, And Use Of An Event-Oriented Haul-Cycle Simulation ProgramBy William C. Dixon
Since the mid 60's, several haul cycle simulation programs have been developed. However, most of these programs are believed to employ the continuous, rather than the discrete, event-oriented sim
Jan 1, 1978
-
The Cost And Benefit Of The Phase 2 Investigation For The Reach 4 Tunnel, How A Roll Of The Dice Came Up BIG In Las VegasBy Ray Brainard
The subsurface investigation for the Reach 4 Tunnel was expected to be completed in a single phase. This assumed that data from two nearby previous tunnels, combined with limited new subsurface inform
-
The Application Of Ore Characterization In The Production Of Iron Ore PelletsIntroduction The science of geometallurgy requires that ore characterization be performed holistically, that is, with consideration of ore quality on plant performance and product quality. Geometall
Jan 1, 2007
-
Extracting Value from Simulation Models: Feasibility Grade ControlBy M. E. Rossi
This paper discusses the use of Conditional Simulation (CS) models to provide mill feed grade profiles for different time periods. The conventional approach of classifying block estimates as ore or wa
Jan 1, 2019
-
The Influence Of Particle Size In Flocculation Phenomena Of Mixed Particles Of Quartz And Fluorite In Aqueous SuspensionBy Furuyama Takashi, Mori Sukeyuki, Hara Tsuyoshi, Fukushima Yujin
In mineral processing practice, flocculation is largely established as an engineering technique of waste water treatment and the study of parameters increasing the settling velocity of particles is st
Jan 1, 1995
-
Control of Coal Worker's Pneumoconiosis: An Assessment of Progress and NeedsBy Raja V. Ramani
Worldwide, promulgation and enforcement of health and safety laws and regulations have been the primary means of ensuring minimum and uniform standards of health and safety in the mining industry. In
Jan 1, 1997
-
Enhancement Of Bacterial Iron And Sulfate Respiration For In-Situ Bioremediation Of Acid Mine Drainage Sites: A Case StudyBy James M. Harrington, A. Azra Bilgin, JoAnn Silverstein
The prevention of AMD in situ is more attractive compared to subsequent downgradient treatment alternatives that do not involve source control. AMD source control can be achieved by shifting the micr
Jan 1, 2005
-
A New Simulator For Designing Belt System Capacities In Underground Coal Mines - IntroductionBy S. D. Thompson
Since 1965 several researchers have independently developed computer models for designing gathering belt and surge bin capacities in underground coal mine belt systems. Table 1 summarizes the models a
Jan 1, 1987
-
Developing Gold Fields’ La Cima Cerro Corona Project in PeruBy Richard W. Graeme, James J. Komadina
Gold Fields acquired an option to purchase the Cerro Corona project, located in Hualgayoc, Cajamarca Department, Peru, in December 2003. In January 2006, the option was taken up and the transaction c
Jan 1, 2007
-
Black Thunder Mine Planning And The Environment ? IntroductionBy Hugh W. Evans
Many reports and papers have been delivered on projects under construction or already in operation, but we believe there are few that have been written about projects yet to be built specifically deal
Jan 1, 1975
-
The Hallandsås Dual Mode TBMBy Werner Burger
The Hallandsås project with a long history, first started in 1991, is well known in the tunneling community. In the past it has been stopped twice for technical and environmental reasons. The third at
-
Evaluation Of Capillary Rise Methods For Determining Wettability Of Powders (5db810bc-2051-4544-80b4-3fdee5f4e379)By R. L. Wolfrom, R. Hogg, S. Chander
A gravimetric method for measuring rates of capillary rise in powders was explored. Methods to improve reproducibility and consistency of the results were investigated. In particular, the effects of
Jan 1, 2002
-
New Water Supply—Oslo - RETC2023By Ingunn Opland, Silje M. Tinderholt
Drill and blast project in Norway’s capital. The contract consists of 7 rock caverns (350–950 m2), 9.2 km tunnels, and four shafts. With 110 blue-collar and 31 white-collar, the project produces an av
Jun 13, 2023
-
Roof Stability Studies In The Bear Mine, Somerset, Colorado; A Case HistoryBy Daryl E. Radcliffe, Raymond M. Stateham
The Bureau of Mines, under a Cooperative Agreement with the Bear Coal Company, Somerset, Colorado, conducted a large scale evaluation of the effect of time lapse on roof stability. Time lapse in this
Jan 1, 1982