Search Documents

  • NIOSH
    RI 7271 Vapor Pressures Of Liquid Titanium (2,008° To 2,379° K) And Liquid Platinum (2,045° To 2,442° K)

    By R. K. Koch

    The vapor pressures of liquid titanium and liquid platinum were studied under the Bureau of Mines program for the determination of thermochemical data on the transition elements. Beating was done in a

    Jan 1, 1969

  • NIOSH
    IC 7267 Geophysical Abstracts 114 July - September 1943 ? Foreword

    Geophysical Abstracts 1 - 83 were issued in mimeographed form by the Bureau of Mines; Abstracts 87 - 111 were published in bulletins of the Geological Survey. Abstracts 112 and 113 were issued in mime

    Jan 1, 1943

  • AUSIMM
    An Update of Exploration at Gladstone and Union Hills, Waihi

    Mineralisation was identified at Gladstone Hill as far back as the late 1870s-early 1880s, shortly after the initial discovery of mineralisation at what is now the Martha Mine. Indeed, early recovery

    Jan 1, 2000

  • SAIMM
    Design Of Permanent Intruded Plugs At South Deep Gold Mine

    By G. S. Littlejohn

    In anticipation of the flooding of an adjacent dolomitic groundwater compartment, five rough parallel sided boundary plugs at 58 and 50levels have been designed to resist safely hydrostatic heads of 1

    Jan 1, 2006

  • NIOSH
    RI 7329 Energetics Of Percussive Drills-Longitudinal Strain Energy

    By Robert G. Lundquist

    The Bureau of Mines compared longitudinal strain energy output of a percussive drill to energy determined by measuring maximum piston velocity. Strain gages were used to determine the strain-time wave

    Jan 1, 1969

  • SME
    Rich Hill, Arizona: Historic Gold District, Modern Gold Rush

    By Erik Melchiorre, M. Katherine Crombie, Dante Lauretta, Chris Gholson

    Rich Hill, also known as Weaver District No. 2, is among the most productive placer gold locations in Arizona. Located near Congress, AZ (Fig. 1), this district hosted major placer rushes in the 1860

    Jan 1, 2003

  • NIOSH
    RI 6772 Demonstration And Evaluation Of Five Methods Of Secondary Backfilling Of Strip-Mine Areas

    By F. E. Griffith

    Cost data are given for five methods of secondary backfilling of strip mines previously partially backfilled. The operations were conducted in north-central Pennsylvania; an average of 600 linear feet

    Jan 1, 1966

  • SME
    Underground Mine Air and Strata Temperature Change Due to the Use of Refuge Alternatives

    By M. A. Reyes, L. Yan

    Heat and humidity buildup within refuge alternatives (RAs) may expose occupants to physiological hazards such as heat stress. The Mine Safety and Health Administration (MSHA) regulations require RAs i

    Nov 22, 2019

  • DFI
    Some Experience With Large Diameter Caissons ? Synopsis

    By I. H. Wong

    The large diameter caisson foundations and their construction methods for three 50 to 60 storey high buildings in Singapore are described. The caissons are 5 m to 8 m in diameter and 40 m to 100 m dee

    Jan 1, 2010

  • ABM
    INFLUÊNCIA DA POTÊNCIA DO LASER PARA O CORTE DE UMA LIGA DE NiTi COM AUSTENITA ENCRUADA

    By Andersan dos Santos Paula

    O objetivo deste trabalho foi avaliar a influência da potência do laser Yb:vidro a fibra, no que diz respeito a extensão dos efeitos estruturais promovido e a possibilidade de corte de uma chapa de Ni

    Aug 16, 2017

  • NIOSH
    Bulletin 90 Abstracts of Current Decisions on Mine and Mining

    By J. W. Thompson

    ORES PROCESS OF ORE CONCENTRATION-PATENTABILITY. The patent issued to Sulman, Pickard, and Ballot, November 6, 1905, and assigned to Minerals Separation and Minerals Separation American Syndicate, for

    Jan 1, 1915

  • CIM
    Tof-SIMS Surface Analyses as a Diagnostic and Predictive Tool for Mineral Processing: New Developments and Applications

    By Brian Hart, Stamen Dimov

    "The Time of Flight Secondary Ion Mass Spectrometer (ToF-SIMS) is unique in that it measures the outermost atomic layers of any material. The technique is particularly suited for determining surface c

    Jan 1, 2010

  • TMS
    Production Of Elemental Sulphur From Non-Ferrous Smelter Gas (Keynote) (0da863a0-3b55-4ebb-968f-68550bd51096)

    By Takahiko Okura

    Most non-ferrous raw materials are associated with sulphur. To extract the metals, the sulphur is recovered typically as Sulphuric acid or liquid S02. On the other hand, natural gas may contain over 2

    Jan 1, 2003

  • NIOSH
    RI 6574 Lightweight Aggregates Expansion Properties of Selected Indiana Shales

    By Howard P. Hamlin, John W. Sweeney

    Shales from 14 locations in Indiana were sampled , tested , and evaluated to determine feasibility of producing lightweight aggregates by rotary - kiln and sintering methods . Sampling procedures and

    Jan 1, 1965

  • SME
    New Insitu Instrumentation Technique For Tunneling & Mining Design: Field Examples

    By Yoshinori Iwasaki, Shosei Serata, Yutaka Mochida

    A new comprehensive insitu instrumentation technique named this RCC Method has been developed for rapid assessment and improvement of the structural stability of underground openings. When applied to

    Jan 1, 1976

  • CIM
    Future of Oxygen Steelmaking: Myths and Reality

    By R. J. Fruehan

    Oxygen steelmaking (OSM) is not only the dominant steelmaking process but defines the structure of the industry. There are a number of myths regarding the future of OSM, which are false. These myths i

    Jan 1, 2004

  • SME
    Selective Flotation of Quartz from Hematite by Amide‑Amine: Fundamental Studies - Mining, Metallurgy & Exploration (2021)

    By Rosa Malena Fernandes Lima, Kerollan da Silva Ramos, Joyce de Assis Silva, Geriane Macedo Rocha

    This study evaluated the effects of collector type amide-amine compared with those of conventional etheramine acetate (both cationic collectors) on the surface properties of quartz and hematite. An ex

    Jul 30, 2021

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • SME
    SVCW Gravity Pipeline—Ground Movements During Construction - RETC2023

    By Nik Sokol, Eric Sekulski, Leo Weiman-Benitez, Jon Hurt, Shrinidhi Vijayakumar, Phaidra Campbell

    The Silicon Valley Clean Water (SVCW) Gravity Pipeline (GP) is the first Progressive Design Build (PDB) tunnel completed in North America. As part of the Regional Environmental Sewer Conveyance Upgrad

    Jun 13, 2023

  • AIME
    Biographical Notice Of Charles B. Dudley, Ph.D.

    By R. W. Raymond

    (Pittsburg Meeting, March, 1910.) IN the long list of our illustrious and lamented dead, there are names which recall personality as well as career and achievement; social as well as scientific merit

    Jun 1, 1910