The Limitations and Potential Design Risks When Applying Empirically Derived Coal Pillar Strength Equations to Real-Life Mine Stability ProblemsBy Guy Reed, Russell Frith
"The method of determining coal pillar strength equations from databases of stable and failed case histories is more than 50 years old and has been applied in different countries by different research
Jan 1, 2018
-
IC 7687 Review Of Literature On Health Hazards Of Fluorine And Its Compounds In The Mining And Allied Industries ? IntroductionBy S. J. Davenport
The increased consumption and importation of fluorspar and cryolite (1)3/ in recent years, and especially the addition of fluorine compounds to drinking water in the United States, have aroused renewe
Jan 1, 1954
-
Solidification Of An Al-Zn Alloy During Semi-Solid Processing - SynopsisBy S. L. George
The semi-solid metal casting process results in a unique solidification path. The microstructural features that were identified during the characterization of the as-cast microstructure, were used as
Jan 1, 2011
-
Uncertainty And Bias In Evaluation Of LRFD Ultimate Limit State For Axially Loaded Driven PilesBy James A. Schneider
Selection of resistance factors within Load and Resistance Factor Design (LRFD) requires accurate assessment of uncertainty and bias in load and resistance. To date, many studies have focused predomin
Jan 1, 2009
-
112th National Western Mining Conference attracts heavyweightsThe 112th Annual National Western Mining Conference (NWMC) hosted by the Colorado Mining Association (CMA) drew some political heavyweights, if by voice only, into the fray of two of the hottest topic
Jan 4, 2010
-
Jet Grouting for Tunnel Support Below Runway 15R-33L at BWI AirportBy Joseph K. Cavey
To accommodate the new Pier A expansion at BWI airport, a 1.8 m (6.0 ft)diameter stormwater pipe was constructed below active Runway 15R-33L. The jacked tunnel alignment runs east/west below the runwa
Jan 1, 2003
-
Estudo Da Influência Da Temperatura De Recozimento Intercrítico Nas Propriedades De Um Aço Dual-phaseBy Luara da Costa Morais
O objetivo deste trabalho é avaliar a influência da temperatura de recozimento intercritíco na microestrutura e nas propriedades de um aço dual-phase. Para isto, amostras do aço em estudo foram recozi
Aug 8, 2018
-
Research Projects for Enhancing Work Safety in Mines Implemented Following the Request of the President of the State Mining AuthorityBy Piotr Litwa
The paper focuses on actions aiming at improvement of work safety in mines, particularly in those extracting hard coal, taking into account the characteristics of natural hazards in Polish underground
Aug 1, 2013
-
Applications of geophysical methods to resource development in northern CanadaBy A. E. Taylor, A. S. Judge, P. T. Lafleche
"Resource development in northern Canada has special requirements which derive from the unique environmental and eco-logical nature of the northern environment. In this paper several case histories in
Jan 1, 1987
-
Mill Drives In The Third MillenniumBy G. A. Grandy, P. F. Thomas, C. D. Danecki
When considering the mill drive system for a grinding application, a large number of questions must be answered. Depending on the mill size and type, the mill can be driven by several configurations
Jan 1, 2001
-
Circuit Design and Operational Philosophy Related to Custom Gold Ore Processing at PamourBy R. D. Lindsay
Pamour Porcupine Mines, Limited has been actively engaged in the ''Custom Tolling'' of Gold-Bearing materials throughout the past decade. Experience acquired in this area was utilized to design and co
Jan 1, 1987
-
Safe Continuous Precipitation And Disposal Of Arsenic And Other Toxic Elements From Biological Processing Of Refractory Gold OresBy Satid Therdkiattikul, Donald A. Dahlstrom
By oxidizing the pyrite matrix through biological leaching of precious metals ores or concentrates, better than 90% recovery of gold and silver is achieved. The paper develops three precipitation proc
Jan 1, 1995
-
Grasberg Block Cave Haulage Project – Design and Construction UpdateBy B Mead, N D. Pascoe
The Grasberg block cave rail haulage system will be located in the Grasberg mining district on the island of Papua, Indonesia at an elevation of almost 3000 m above sea level. It will transport 160 00
May 9, 2016
-
Measurement and Analysis of Foundation Tilt Resulting From Mine Subsidence in Southern IllinoisBy Larry R. Powell
The Bureau of Mines, in cooperation with the Illinois Mine Subsidence Insurance Fund, is monitoring the response of two foundations to ground movements induced by subsidence from high extraction minin
Jan 1, 1986
-
IC 8447 Secondary Gold In The United StatesThe Bureau of Mines analyzed the cycle of secondary gold to determine the quantity of gold not being recovered from scrap, and to identify areas for research to increase the supply of gold from scrap.
Jan 1, 1970
-
RI 3531 Air Flow At Discharge Of Fan-Pipe Lines In Mines - Part 1. - 10-Inch Line In Development End ? Introduction (e8c34429-6cef-40b1-87cf-4e08b99ca8c5)By G. E. McElroy
[The ventilation of development faces In nines for diluting Gas or dist concentrations and, in hot nines for providing air-motion cooling effect, by fan-pipe units discharging high-velocity steams of
Jan 1, 1940
-
Trend in Steam Boiler and Furnace DesignBy R. E. MacAfee
THERE have been great changes in the design, capacity, and pressure of steam generating units over the past fifty years. If we go back as far as 1890, the plants then existing were largely horizontal
Jan 1, 1939
-
Footwall anchoring at Smoky River Coal LimitedBy Peter L. Sheehan, David A. Fawcett, Dennis C. Martin
"Smoky River Coal Limited has successfully completed a major program involving the pattern rock anchoring of a high, steeply dipping footwall slope. The slope dips at approximately 65 to 70 degrees to
Jan 1, 1988
-
Rock Socketed Drilled Shafts in Electrical SubstationsBy Brock Wallis, Steve Davidow
The following text will present the concept of rock socketed drilled shafts used to support electrical substation structures, and discuss the cost and schedule risks that traditional design responses
Jan 1, 2018
-
The Design of Instruction to Introduce a New Technology: A Case Study in Canadian Mineral ProcessingBy H. D. Stolovitch, M. L. Lavallée
"An engineering system used to analyze and improve the performance of industrial grinding circuits has been adapted into a training program. The systematic approach to the design of training was appli
Jan 1, 1992