Search Documents

  • CIM
    Wear

    By H. R. Banks

    IF you have ever travelled in the valley lying between the Selkirks and the Rockies in the East Koorenay district, you will have noted that the former mountains are rounded and massive, while the serr

    Jan 1, 1943

  • AUSIMM
    Manganese and Iron in Broken Hill Sphalerite

    Individual specimens of sphalerite from the Broken Hill lode vary considerably in manganese and iron contents, even within the same orebody, so that study of the overall variation of manganese and iro

    Jan 1, 1956

  • TMS
    Depth through Breadth: Addressing the Grand Challenges of Teaching Sustainability

    By Svetlana Nikitina

    While many question "sustainability" as an intellectual field on the grounds that it is too broad and "undisciplined," we are able to achieve a good balance between breadth of coverage and depth of in

    Jan 1, 2010

  • AIME
    The Precious Metals

    By Arthur Mackwell

    The role of the precious metals is changing rapidly. They are becoming primarily materials of modern industry, and their decorative and monetary functions are diminishing in relative importance. Certa

    Jan 1, 1976

  • SME
    Soil Deformation Analysis During TBM Excavation: Comparing Three Different TBM Technologies Used During the Construction of the Toulouse Metro Line B

    By Richard Kastner, Emilie Vanoudheusden, Fabrice Emeriault, Jacques Robert

    INTRODUCTION The subway line B of Toulouse (France) has been realized with three different tunnel boring machines (TBM) techniques: Contracts 2 and 5 are excavated with earth-pressure balanced TBM

    Jan 1, 2007

  • AUSIMM
    New Directions - Old Ideas Hydrocarbon Prospects of the Strzelecki Group Onshore Gippsland Basin

    By McNicol M. D

    Petroleum exploration in onshore Gippsland was directed in the 1950s and 1960s towards plays in the basal Latrobe and Strzelecki Groups, but these became forgotten in the 1970s with the Latrobe play

    Jan 1, 1992

  • IIMP
    Implementación de un Roadmap de Tecnologías 4.0 como estrategia para incrementar la eficiencia del proceso de Molienda Polimetálica en la unidad minera Cerro Lindo

    By Leonardo Bravo, Leonardo Almeyda

    El desarrollo de proyectos de I&D es fundamental para maximizar la eficiencia del beneficiamiento de minerales. Por ello, Nexa Resources busca captar nuevas variables, controlar y optimizar los proces

    Sep 29, 2023

  • ISEE
    Wall Control Blasting Practices at Kisladag Gold Mine

    By Ekin Güngor, Berkant Ozdemir, Erkan Bayrak, Serdar Ergün, Sedat Esen

    "This paper presents the final wall blasting practices at Eldorado Kisladag Gold Mine in Turkey. Benchmark and improved wall control designs were explained in detail. Kisladag Mine has been implementi

    Jan 1, 2017

  • SAIMM
    Impact of deep-hole opencast blasting on the stability of water dams of a close-by underground coal mine ? Synopsis

    By C. Sawmliana

    Deep-hole blasting operations in opencast mines are always associated with some annoyance to the surrounding areas in terms of ground vibration, noise, flyrock, etc. These become more severe when unde

    Jan 1, 2009

  • ISEE
    Diagnosing and Modifying Off-Site Blast Effects by Seismic Means - A Case Study

    By Stuart Brashear, Robert Brush, Ben Cook

    In early 1993, the Piney River quarry owned and operated by the Blue Ridge Stone Corporation of W W? Boxley received a series of complaints from the owners of a 130 year-old historic farmhouse that ha

    Jan 1, 1996

  • CIM
    Demonstration Campaign Results on a Cyanide-Free Process for Gold Extraction from a Refractory Pyrite Concentrate

    By A. Drouin, D. Lemieux, C. Chouinard

    "A gold bearing pyrite concentrate was treated at the demonstration scale (15 t/d) for the extraction of gold using a cyanide-free process. The pyrite was depressed in the flotation circuit in order t

    Jan 1, 2017

  • CIM
    Towards Sustainable Mining

    ?Why TSM in Canada ?How it was developed ?Architecture and Goverance ?COI panel ?Performance indicators and how they work ?External Verification ?Reporting ?The national organization of the Can

    May 1, 2011

  • TMS
    Microstructure of Al2O3/YAG/ZrO2 Eutectic in Situ Composite Prepared by Laser Floating Zone Melting

    By Kan Song, Lin Liu, Hengzhi Fu, Jun Zhang, Haijun Su, Xiaojiao Jia

    "Al2O3/YAG/ZrO2 eutectic in situ composite has been regarded as new generation of high temperature structural material due to its excellent performance even close to its melting point. The directional

    Jan 1, 2012

  • SAIMM
    Annual Mine Planning And Execution Buffering - A Safety Imperative ? Synopsis

    By R. C. D. Phillis

    The annual mine planning process is one of the most important tactical/operational steps towards achieving strategic goals. These tactical plans are part of a very comprehensive Mineral Resource Manag

    Jan 1, 2011

  • NIOSH
    RI 3722 Inflammability and explosibility of metal powders

    By John Nagy, Hylton R. Brown, Irving Hartman

    "INTRODUCTION The tests described in this publication were planned to provide information on the explosibility of metal-powder dust clouds. This subject has become increasingly important because of th

    Oct 1, 1943

  • SAIMM
    Rapid Sensors For Ferroalloy Production And Processing

    By A. McLean, M. Iwase, K. Wakimoto, K. Katogi

    For many decades control strategies have been based upon samples taken from liquid steel, molten slag and gas phase as well as from solid products. Because of recent developments in the areas of dynam

    Jan 1, 2004

  • AIME
    Iron-ore Sinter

    By G. M. Schwartz

    THERE has been considerable controversy regarding the structure and mineral constituents produced when iron ore is sintered. This investigation was undertaken in order to establish the fundamental rea

    Jan 1, 1929

  • SAIMM
    Development and application of new technology for 3D Geomechanical model test of large underground group caverns

    By S. Jiansheng, H. Nakayama, D. Lu, A. Wang

    ABSTRACT: New techniques and methods for 3D geo-mechanical model test are presented in this paper. The new model material NIOS with high density and low cost; the so-called DPSS (Discrete Principal St

    Jan 1, 2003

  • CIM
    The Bethlehem Molybdenum Plant

    By E. A. Lowe, A. F. Bellamy, J. W. Smith

    "In the autumn of 1977 Bethlehem management initiated feasibility studies on recovery of by-product molybdenum from concentrate produced at the existing Highland Valley mining operation. Over the fall

    Jan 1, 1980

  • TMS
    Bonded Permanent Magnets -An Overview

    By Mitchell L. Spencer, Viswanathan Panchanathan

    "Bonded magnets are important category in permanent magnets. They are made by one of the following processes: compression bonding, injection molding, extrusion, calendering. An overview of the various

    Jan 1, 2013