Search Documents

  • AUSIMM
    The Importance Properties of Hydraulic Fill, with Particular Reference to Mechanized Cut and Fill Mining Operations

    Essential features of the role of the fill material in mechanized cut and fill mining are discussed, with particular emphasis on its dewatering and strength development after emplacement. The fill mat

    Jan 1, 1966

  • CIM
    Economic Considerations in the Production and Preparation of Coal for the Carbonization Market

    By Gerald Blackmore

    "This paper suggests that with the settlement of long-term contracts of fifteen years' duration, with prospects of extension, the coal mining industry has, for the first time, a complete commercial ju

    Jan 1, 1970

  • NIOSH
    IC 7283 Permissible Mine Equipment Approved During 1943

    By E. J. Gleim

    A list of permissible mine equipment, tested and approved by the Bureau of Mines previous to January 1, 1942, was published in Bureau of Mines Information Circular 7207.3/ The list of that date was co

    Jan 1, 1944

  • SME
    SAG Mill Pilot Testing Of A High-Clay Silver Ore At Gumuskoy, Turkey

    By A. C. T. Bigg, Y. Kocak, N. K. Bodur

    The Gumuskoy silver mine, owned by the Etibank, in the province of Kutahya, Turkey, has been operating since 1987 with primary, secondary and tertiary crushers, and two parallel single stage ball mill

    Jan 1, 2000

  • NIOSH
    RI 3218 Volatilization of Impurities from Zinc Concentrates

    By G. L. Oldwright, F. K. Shelton, W. E. Keck

    "INTRODUCTION Zinc must be of high grade to satisfy the present demand. Even when the amount of premium paid is small, the purer metal as the buyers' preference. The following specifications for spelt

    Jun 1, 1933

  • ABM
    Análise Da Vida Estrutural De Tubos De Plástico Reforçado Com Fibras De Vidro (Prfv) Destinados Às Aplicações De Redes De Adução De Água Com Expectativa Mínima De Cinquenta Anos

    By Anderson Nogueira Vidal

    Os tubos de Plástico Reforçado com Fibras de Vidro, também conhecidos como tubos de PRFV são pouco utilizados em obras de infraestrutura no Brasil, principalmente por desconhecimento técnico da sua vi

    Aug 8, 2018

  • SAIMM
    Fan-Structure Shear Rupture Mechanism as a Source of Shear Rupture Rockbursts

    By B. G. Tarasov

    This paper proposes the further development of a recently identified shear rupture mechanism (fan mechanism) that elucidates a paradoxical feature of hard rocks ? the possibility of shear rupture prop

    Jan 1, 2014

  • NIOSH
    OFR-69(2)-75 Research And Development Contract For Coal Mine Communication System - Volume 2 - Section 1 - Analysis of Mine Communications

    A working understanding of present coal mine communications equipment and its usage is an essential prerequisite to the determination of future communications systems needs. As a means of gaining this

    Jan 1, 1974

  • SAIMM
    Effect of inorganic chloride on spontaneous combustion of coal

    By Y. I. Yang, Y. -B. Tang, D. -J. Ma

    Chlorine-containing minerals are commonly present in coal. Associated minerals such as pyrite can undergo exothermic reactions. Consequently, it is of great significance to study the effect of inorgan

    Jan 1, 2015

  • NIOSH
    Technology News - No. 494 - Expert Miner Training Video Released By NIOSH

    Objective To develop safety training tools for mine safety and health professionals that fill gaps in currently available materials. Background Over the past 4 years, NIOSH has developed and

    Mar 1, 2002

  • AUSIMM
    The Calc-silicate-hosted Watershed Tungsten Deposit, Far North Queensland, Australia

    By J Williamson, M Griessmann

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Watershed tungsten deposit is located in the Hodgkinson Province of north Queensland, A

    Mar 18, 2015

  • DFI
    Recent Evolutions In Deep Foundation Technologies

    By Maurice Bottiau

    It is a quite challenging objective to aim at covering in one paper the most recent evolution in piling and deep foundations technologies. This report has to be understood within the limits of the ses

    Jan 1, 2006

  • AUSIMM
    Performance of Outotec FloatForce« Flotation Mechanism - A Study in Both Computational Fluid Dynamics and Industrial Scale Measurement

    Performance of Outotec FloatForce« Flotation Mechanism - A Study in Both Computational Fluid Dynamics and Industrial Scale Measurement

    Sep 13, 2010

  • CIM
    Recent Gravity Improvements at the Porcupine Joint Venture

    By Ron Millions, J. A. Folinsbee, Ishwinder Grewal, Michael Fullam, Don Strickland, Tony Y. Chong

    "Since milling began in 1912, the Dome mill, now part of the Porcupine Joint Venture (PJV), has been expanded several times, the most recent increasing the milling rate from 3,500 to 11,500 tonnes per

    Jan 1, 2004

  • DFI
    Vibwall Installation - Cardiff Bay Barrage ? Synopsis

    By Graeme McWhirter

    This paper discusses the Installation of a Vibwall for the Cardiff Bay Barrage Project Wales, UK, by Kvaerner Cementation Foundations. Only the second use of the technique in the UK the wall was succe

    Jan 1, 2000

  • ISEE
    Demolition of the Milwaukee Railroad Trestle Pier, Lind, WA

    By William C. B. Gates

    Demolition blasting next to an active railroad can be very challenging because of track safety, blasting vibrations, potential track fouling by blast debris, and short work windows on a live track. Re

    Jan 1, 2016

  • SME
    The Tai Po to Butterfly Valley Aqueduct in Hong Kong

    By Derek. C. Arnold

    In order to meet increasing demands for water supply in the next millennium, the Government of the Hong Kong Special Administrative Region have identified the need for a major new water treatment and

    Jan 1, 1999

  • SAIMM
    The role of gravity flow in the design and planning of large sublevel stopes

    By M. Pineda

    Sublevel stoping (SLS) is one of the oldest and most used methods for underground mining. It relies heavily on the use of drilling and blasting techniques to remove the rock, and gravity to transport

    Jan 1, 2015

  • DFI
    The Realities Of Foundation Engineering ? Synopsis

    By J. O. Osterberg

    The realities of foundation enginering are that the work never proceeds exactly as expected. The various reasons, exploration, design, construction, and legal are discussed. Case histories are present

    Jan 1, 2010

  • CIM
    Selectivity in the Collectorless Flotation of Two Complex Sulphide Ores

    By M. Leroux, P. Lacombe, S. R. Rao, J. Y. Kim, J. A. Finch, G. Labonté, N. Macminn, M. Ounpuu

    "Laboratory investigations on two complex ores, the A1 zone ore from Les Mines Selbaie and the Lyon Lake ore from Mattabi Mines Ltd. (Division of Noranda Minerals), have been carried out to determine

    Jan 1, 1990