Search Documents

  • AUSIMM
    A New Effective Labour-Planning Model for Mines

    The mining industry is the largest source of foreign income for South Africa. It is also the main source of employment in the country and, as an industry; it is also one of the largest. Due to the lab

    Dec 6, 2010

  • AUSIMM
    Plastics recycling and sampling

    By S C. Dominy

    This contribution examines the effect of feedstock sampling before the sorting stage of polyethylene terephtalate (PET) bottle recycling. Batches of waste PET bottles may contain non-PET bottles which

    May 9, 2017

  • SAIMM
    Evaluation And Control Of Iron And Steelmaking Slags Through Electrochemical FeO Sensors

    By A. McLean, M. Iwase, K. Wakimoto, K. Katogi, Y. Kikuchi

    One of the greatest obstacles to the application of physical chemistry principles to the elucidation of slag-metal reactions is a lack of knowledge of activities of the reacting species. To a large ex

    Jan 1, 2004

  • AUSIMM
    Mount Morgan Practice in Recording and Estimating Ore Tonnages and Values

    THE irregularity of the Mount Morgan ore body presents problems other than those for mining only. For irregularity of outline is coupled with irregularity of grade, and the ore varies so rapidly from

    Jan 1, 1910

  • CIM
    Geophysical Case Study of Shallow and Deep Structures Based on Traditional and Modified Interpretation Methods: Application to Tectonic Studies and Mineral Exploration

    By J. Asfahani

    "The Schlumberger configuration used in geoelectrical sounding is slightly adapted here to obtain reliable data for both shallow and deep penetration depths from the same survey. In this configuration

    Jan 1, 2009

  • SME
    Trends in Availability of Aggregate

    By G. R. Robinson

    Aggregate resources consist of sand and gravel, and crushed stone. They are large-tonnage, bulk-minable mineral commodities that are used in construction and industrial activities (Tepordei, 1999, 20

    Jan 1, 2004

  • CIM
    Maintenance Control at Algoma's Macleod Mine

    By C. A. Campbell

    "There has been a significant reduction in maintenance hours and improved performance by maintenance crews at the MacLeod mine since the introduction of a Maintenance Control system which includes the

    Jan 1, 1973

  • ISEE
    Journal: Junction Chamber Blasting November 22,1999

    By Edward Walter

    Rock excavation for tunneling projects occurs on a regular basis in the Cleveland area. These tunnels are being constructed to increase the capacity of the sanitary sewer system. Controlled blasting m

    Jan 1, 2001

  • DFI
    Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - Introduction

    By P. A. Neill, O&apos

    The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee

    Jan 1, 1994

  • AUSIMM
    Notes on the Lindsay Reward Tin Mine, Western Tasmania

    WHEN the writer resided at Zeehan, qn the West Coast of Tasmania, some years ago, he took a keen interest in the geology of the district and availed himself of the opportunity to investigate occurrenc

    Jan 1, 1923

  • AUSIMM
    Intensive Boring on the Wonthaggi Coal-Field, Victoria

    THE Wonthaggi coal-field lies south easterly from Melbourne at a distance by rail of 86 miles, on the flats of the Powlett River, immediately to the south of the deep-cut valleys and steep intervening

    Jan 1, 1918

  • SME
    Special Shotcrete to Improve Open-Type TBM Performance Under Difficult Conditions

    By Sohta Takatsu, Hachiroh Mizubata, Shigeki Kudoh, Kazuya Takekuni, Yoshinori Yamada

    A special type of shotcrete is used to improve the performance of open-type TBM in difficult situations. The Hakamagoshi and Johana tunnels are expressway evacuation tunnels of 3.2 km and 5.1 km in le

    Jan 1, 2001

  • SME
    Challenges Of Conveyors In Tunneling

    By Marco Sonnenschein

    As time is costly, engineering companies have developed methods, procedures and mechanical equipment to tunnel faster. But the best excavation method will not be able to cope with the time pressure if

    Jan 1, 2012

  • SME
    Manila Aqueduct (Philippines) — The Construction of the Umiray-Angat Tunnel Project — A Success of Organisation and Technology Against a Unique Combination of the Most Adverse Conditions Ever Encountered in Tunneling

    By Remo Grandori

    The Umiray Angat 13,2 km long tunnel in Philippines have been bored through extremely variable and difficult ground conditions including a number of special events. In particular the following adve

    Jan 1, 2001

  • AUSIMM
    Bulk Sampling of Complex Gold Deposits - Material Characterisation and Program Design and Management

    By I M. Platten, Y Xie

    Complex gold deposits are generally characterised by variable geometries, strong structural controls on grade distribution and a high-nugget effect. The use of diamond drilling and fire assays in this

    Jan 1, 2008

  • CIM
    Alimak Mining at the David Bell Mine

    By Andrew G. Patton

    The Alimak mining method was introduced at the David Bell mine in 1998 to extract an otherwise uneconomic and inaccessible reserve. The success associated with the extraction of these reserves led to

    Oct 1, 2001

  • ABM
    Viabilidade Técnica Para Uso De Gesso Fgd Como Aditivo Retardador Do Tempo De Pega Em Cimento Portland

    By Mariella Cortez Caillahua

    No presente estudo o gesso FGD (flue gas desulfurization) foi avaliado como aditivo retardador do tempo de pega, substituindo o gesso natural na fabricação do cimento Portland (CP II E-32). Os resulta

    Aug 8, 2018

  • NIOSH
    OFR-29-76 An Annotated Bibliography On Mine Fires - Narrative

    By C. E. Gregory

    In terms of a Research Proposals supported by a Grant Agreement dated 30 June 1973, the author was commissioned to prepare an annotated bibliography of mine fires. The main objective was to conduc

    Jan 1, 1974

  • NIOSH
    OFR-62(3)-74 Analysis Of Ore Handling Systems In Underground Metal Mines For Improved Safety And Efficiency - Phase 2. System Improvements And Research Recommendations

    This report covers the results of an industrial engineering study that assessed the safety and efficiency of underground ore handling in U.S. metal mines. Significant conclusions that will be of benef

    Jan 1, 1974

  • SME
    Automation in the Mining Industry: Review of Technology, Systems,Human Factors, and Political Risk Mining, Metallurgy and Exploration

    By Kritika Baxla, M. Mustafa Kahraman, Frank A. Drews, Yaxue Wang, Joel M. Haight, Kody Powell, Mohit Sobalkar, W. Pratt Rogers

    In the opinion of these authors, technology alone can never give an organization an edge over competitors or provide an industry step change. However, history has shown that technology applied with co