  • CIM
    Pilot Plant Testing for Column Flotation Circuit Design

    By G. A. Kosick, G. S. Dobby, O. Matwijenko

    "A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl

    Jan 1, 1990

  • CIM
    Cadia SAG Mill Simulated Charge Behaviour

    By Walter Valery, Peter Radziszewski

    "The NewCrest Cadia operation boasts the largest SAG mill commissioned last June 1998. A request was made to shed some more light on possible SAG mill charge behaviour. Three different software were u

    Jan 1, 1999

  • CIM
    Get More from Existing Mining Equipment Through Reliability

    Improved Process & Practices Result In: ? Reduction of undesirable downtime, & expensive secondary damage ? Improved equipment performance & health ? Extension of equipment life, & reduction of ope

    May 1, 2010

  • CIM
    The North American Iron Ore Industry A Decade into the 21st Century

    By J. D. Jorgenson

    ?? U.S. domestic production peaked at 120 Mt during years of the Korean Conflict120 Conflict ?? Pellet production increased, as highPellet high-grade ores decreasedores decreased ?? Until 1982 reces

    May 1, 2011

  • CIM
    The Post-Failure Characteristics of Rock - Pt 1: Intact and Broken Rock

    By T. G. Joseph

    A strain-softening constitutive relationship is introduced that describes the post-failure stress-strain curve for rock regardless of whether the rock is intact or broken. The core of this relationshi

    May 1, 2002

  • CIM
    The Use of Centrifuge Technology in the Removal of Crud and Fine Particles in Mineral Processing

    By Derek Ettie

    "In the Hydrometallurgical processes, the presence of the so-called "crud" is a constant challenge in solvent extraction. Crud is a stable emulsion which forms along the interface between the aqueous

    Jan 1, 2014

  • CIM
    Operational Improvements in Seven Mineral Processing Plants by Increasing Grinding Circuit “Classification System Efficiency (CSE)”

    By Robert E. McIvor

    "“Classification System Efficiency (CSE)” is a powerful, emerging tool that can be used to increase grinding circuit efficiency. It is defined as the percentage of the ball mill energy being used to g

    Jan 1, 2013

  • CIM
    An integrated approach to modelling, design and optimisation of the flotation plant at the Red Dog concentrator

    By Barun Gorain, Andy Stradling

    "The traditional metallurgical scale-up techniques for flotation plants are based on lumped flotation rate constants, dimensionless hydrodynamic numbers and the use of safety factors. Once the plant h

    Jan 1, 2002

  • CIM
    Ultrafine and fine grinding using the METSO Stirred Media Detritor (SMD)

    By Graham Davey

    "Ultrafine grinding of minerals has been in wide spread use in the industrial mineral field for over 30 years. Within the last 10 years the metalliferous industry has shown interest in the ability to

    Jan 1, 2002

  • CIM
    The Design of Instruction to Introduce a New Technology: A Case Study in Canadian Mineral Processing

    By H. D. Stolovitch, M. L. Lavallée

    "An engineering system used to analyze and improve the performance of industrial grinding circuits has been adapted into a training program. The systematic approach to the design of training was appli

    Jan 1, 1992

  • CIM
    The Cinola Project, Process and Environment

    By C. J. A. Davie

    "SUMMARY A practical application of nitric acid oxidation of sulphides, based on the principles of the Arseno process, has been developed for the Cinola ore. Development of the process has been based

    Jan 1, 1989

  • CIM
    Experiences with a New Generation Automated Long Hole Drilling Rigs at LKAB Kiruna Mine in Northern Sweden

    By Patrik Ericsson

    During the 90?s Atlas Copco and LKAB developed a pioneering fully automatic long hole production drilling system based on the Atlas Copco Simba W469 drill rigs. These drill rigs have since then drille

    May 1, 2007

  • CIM
    Propriétés des roches et réponse du massif lors du minage sous contrainte modérée à élevée Partie A - Historique des travaux

    By Denis Labrie

    Le minage en profondeur sous contrainte modérée à élevée présente de nombreux défis aux opérateurs et aux ingénieurs de mine notamment au niveau du contrôle de terrain et de l?environnement minier sou

    May 1, 2002

  • CIM
    The Cigar Lake project - mining, ore handling and milling (1463a4ec-6903-4c1d-b800-831570ba9799)

    By C. R. Edwards

    "The Cigar Lake project will develop the world’s second largest high grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U

    Jan 1, 2002

  • CIM
    Numerical Expansion Analyses of the Strategic Petroleum Reserve in Bayou Choctaw Salt Dome, USA

    By B. Y. Park

    This paper develops a series of three-dimensional simulations for the Bayou Choctaw Strategic Petroleum Reserve. The U.S. Department of Energy plans to leach two new caverns and convert of one of the

    May 1, 2009

  • CIM
    Computer Control of Flotation at Mattagami Lake Mines

    By D. W. Hendriks, C. Daoust, K. V. Konigsmann

    "The concentrator of Mattagami Lake Mines Limited commenced operation in 1963. It had been designed with instrumentation proven at that time. New control techniques were added in subsequent years.An o

    Jan 1, 1976

  • CIM
    Application of 3D X-ray CT Scanning Techniques to Evaluate Fracture Damage Zone in Anisotropic Granitic Rock

    By M. H. B. Nasseri

    Barre granite?s samples have been tested for fracture toughness under mode I along two different directions with respect to microstructural fabrics were investigated. 3D objects counter algorithm tech

    May 1, 2009

  • CIM
    Comparisons of the Geology and Proposed Underground Mining Methods of the Panda and Koala Kimberlites at the EKATI Diamond Mine

    By Peter A. Oshust

    The EKATI Diamond Mine has successfully completed the development and commissioning of the Panda Underground Project to extract the ore below the Panda open pit. The dominant kimberlite domain of the

    May 1, 2006

  • CIM
    Rehabilitation of Tailings Areas of Uranium Mines

    By A. J. Vivyurka

    "This is a talk about the experiences that Rio Algom Mines Ltd. has had in the Elliot Lake uranium area trying to make the tailings more compatible with the surrounding environment. To get a better id

    Jan 1, 1975

  • CIM
    Reduction in Dolomite Contamination in Pine Point Zinc Concentrate

    By D. A. Cormode

    "INTRODUCTIONPine Point Mines, operated by Cominco Ltd., is located approximately 55 miles east of Hay River, N.W.T. by the southern shore of Great Slave Lake.The milling operation commenced in the fa