Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Improvement of the technology for performing blasting works in Studena quarry

    By Valeri Mitkov

    Studena Quarry is one of the main suppliers of inert materials for concretes production in Sofia. It is characterized by massif heterogeneity in density and fissuration. Failure to take into consider

    Jan 1, 2010

  • ISEE
    Blasting Improvements by Using Most Active Rock Variations on Blast

    By Alain Blanchier, Anne Charline Sauvage

    Rock mass variations have a huge influence on explosives efficiency and on blasting results. Numerous blasting improvements could be gained by taking into account rock mass and its variations. However

    Jan 1, 2004

  • ISEE
    Structure Responses to a Confined Opening Cut Blast, Sumterville, FL

    By Jeff Senules, Oana Meins, Catherine Aimone-Martin, Scott Lanker, Brent Meins

    Global wall strains from 4 to 77 micro-strains were measured at three structures adjacent to a highly-confined Florida quarry blast when PPV amplitudes ranged up to 6.05 in/s. Increasing the peak zero

    Feb 1, 2020

  • ISEE
    Quantifying NOx Fume Events in Blasting using Drones: Improving Environmental Performance and Public Perception

    By A. Lindo, M. Held

    The formation of NOx fumes is an undesired occurrence and is dependent on a variety of variables. Methods for detection of such fumes with blast analysis tools are available using color schemes for gr

    Jan 1, 2024

  • ISEE
    Performing decking with the use of an inflatable plug in high or total submergence applications in blastholes to improve final wall profile & stability

    By Glenn Tobin

    The overarching goal in modern drill and blasting operations is that of optimising mining operations to achieve higher levels of productivity, safety, profitability and sustainability. Air decking, a

    Jan 1, 2012

  • ISEE
    Bench Blasting Design Based on Analysis of Blast-Induced Ground Vibrations at an Open Pit Coal Mine in Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Alper Celtikci, Serdar Celik, Yucel Karakus

    This paper presents bench blasting designs based on results of vibrations analysis on test shots organized in an open pit coal mine located near to Soma district at Manisa province in Turkey. There ar

    Jan 1, 2012

  • ISEE
    The Investigation Of Establishing The National Damage Criteria For Blast-induced Ground Vibrations In Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Umit Ozer

    The environmental problems such as vibration, and air blast are often faced, and discussed on mining, quarrying, civil constructions, shaft-tunnel, pipeline, and dam operations where blasting is inevi

    Jan 1, 2010

  • ISEE
    Blasting Versus Non-blasting Related Sounds in a House Near Surface Blasting

    By Braden Lusk

    A typical rural house surrounded by a surface coal mine was instrumented in 2008. Information regarding ground vibration, airblast, and sounds inside the house was collected. Previous publications hav

    Jan 1, 2011

  • ISEE
    Preventing the next Terrorist Attack is a Shared Responsibility

    By Joseph Kennedy

    How do terrorists and other criminal bombers acquire explosives to be used in an attack against U.S property and/or citizens? The Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF) with nearly

    Jan 1, 2010

  • ISEE
    Electronic Detonator Timing Approaches for Surface Quarries and Metals Mines

    By Tristan Worsey, Nathan Rouse, Evan Thibaud

    Electronic detonators allow for variability and accuracy with blast delay selection and timing sequence. However, a single published guideline for selection of electronic timing delays is not availabl

    Jan 21, 2025

  • ISEE
    Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" Dam

    By Jennifer Williams, Donald J. Berger

    Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of

    Jan 1, 2014

  • ISEE
    Crack Displacement and Vibration Measurement of an Underground Portal

    By Douglas Rudenko PG, Jay Elkin, Siavash Mahvelati Ph. D.

    Very little studies have investigated the behavior of cracks in unlined tunnels over long periods of time, especially when such flaws are subjected to blast-induced vibrations. Using a pool of 30+ bla

    Feb 1, 2020

  • ISEE
    Precision Delay Detonators: A Decade of Progress

    By M. Y. Wong

    Electronic detonators have been used on a trial basis for over a decade, and found more recent application in production blasting as well. The relative merits of these detonators and their applicabili

    Jan 1, 2004

  • ISEE
    Digitized, Integrated and Optimized Drill and Blast

    By Sushil Bhandari, Amit Bhandari

    In this paper, a case study is presented of a large global cement company using a cloud and mobile based platform across 17 of their mines consistently over a large number of users over a period of ov

    Feb 1, 2020

  • ISEE
    Blast Optimization Through Drilling Information: GBlast®, a Predictive Modeling Software

    By Claudio Lechuga, Carlos Scherpenisse, Juan Rafael Otaiza

    From the analysis of drilling process, Block Model information, drilling pattern data and expected fragmentation targets; GBlast® software optimizes the explosive charge design in order to standardize

    Feb 1, 2020

  • ISEE
    Safe Blasting Parameters And Seismic Influences During Construction Blasting

    By Mario Dobrilovic, Zvonimir Ester, Vinko Skrlec, Vjecislav Bohanek

    The first public garage in the city of Dubrovnik has been built in highly urbanized area, on location Ilina Glavica. The excavation of the building pit has been done partly by construction machinery,

    Jan 1, 2009

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

    Feb 1, 2020

  • ISEE
    Development of a new contour blasting system using bulk emulsions

    By Peter Moser, Mark Ganster, Radoslava Ivanova, Florian Bauer

    Blasting accurately in underground drifts and creating a smooth contour requires proper drilling, knowledge about the apparent geology, a well designed blast pattern and ideally a smooth blasting prod

    Jan 1, 2012

  • ISEE
    Displacement and Mixing of Blasted Sedimentary Rocks in Quarrying

    By Stephen Chung, John Carpenter, Scott Gosch, James Breedlove

    While controlling fly rock and ground vibration in quarrying in the neighborhood of a residential area, producing good fragmentation and keeping different grades of material separated in a muckpile ar

    Jan 1, 2001

  • ISEE
    Super Accurate Detonators - A Rockblaster's Dream

    By Jan Westberg, Roger Holmberg, Bernt Larsson

    Over the last couple of decades there has been an increased demand from the market for precision detonators, partly because of a need for better blasting results and partly because of a need for bette

    Jan 1, 1988