Search Documents

  • NIOSH
    IC 9090 Primary Silver Availability-Market Economy Countries - A Minerals Availability Appraisal

    By E. H. Boyle

    The Bureau of Mines has evaluated the potential availability of silver from 436 mines and deposits in 41 market economy countries (MEC?s) comprising five major economic categories of deposits: predomi

    Jan 1, 1986

  • AUSIMM
    Fundamentals Research on the Port Pirie Lead Blast Furnace Slags

    The great problem at Port Pirie and many other lead smelters has always been to keep the lead content of the slags down to a low level. This has been done in the past largely by empirical methods, the

    Jan 1, 1956

  • AUSIMM
    Mine Planning and Risk Management Associated with the Breakthrough of the Telfer Sublevel Cave into the Active Telfer Open Pit

    The Telfer main dome open pit is operated by Newcrest Mining Limited at a current production rate of 50 Mt/a from a pit dimension compromising 2 km strike length, 1 km width and 250 m depth. As part o

    May 1, 2010

  • SME
    Interpretive Geotechnical Investigation For Onion Creek Wastewater Interceptor Tunnels - Austin, Texas

    By Robert M. Valentine, Randall L. Lentell

    Interpretive geotechnical investigations were performed for the construction of approximately 15,250 m (50,000 ft) of wastewater interceptor tunnels in Austin, Texas. Subsurface materials consist of c

    Jan 1, 1985

  • SME
    Observation Methods Using Real-Time Surface Settlement Monitoring On The South Toulon Tunnel Project

    By B. Caro Vargas

    The Toulon Tunnel project is a key component of the highway corridor on the French Riviera between Marseille and Nice and is a fundamental transportation infrastructure for the region. The first desig

    Jan 1, 2012

  • DFI
    Analysis Of A Deep Excavation In Calgary, Alberta

    By Thomas Lardner

    Excavation for The Bow, EnCana, in downtown Calgary, occurred between May 2007 and September 2008. A monitoring programme was used to determine the behaviour of the shoring wall, soil and bedrock dur

    Jan 1, 2010

  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001

  • NIOSH
    The Mineral Industry Of Central American Countries

    By Doris M. Hyde

    Mineral output and trade in the Central American countries were directly or indirectly affected by the sometimes violent civil unrest and recessionary economic developments that have pervaded the regi

    Jan 1, 1985

  • CIM
    On the Use of Large OK-16 Flotation Machines at the Concentrators of Outokumpu Oy

    By Tapio Leskinen

    "In the 1960’s, when large flotation machines appeared on the market, this was a part of a world-wide trend towards the use of ever larger machine units.One factor that has played a decisive part in t

    Jan 1, 1976

  • AUSIMM
    Control of Manganese Level in an Electrolytic Zinc Plant Circuit by Anodic Deposition of Oxide

    By Bratt G. C

    When zinc is electrowon from concentrates or residues of high manganese content, the zinc sulphate electrolyte may contain high levels of manganese. The manganese level is usually controlled by remova

    Jan 1, 1975

  • DFI
    Innovative Use Of Micropile Load Test Data For 18th Street Expressway Bridge

    By Lance A. Roberts

    Micropiles are commonly utilized for applications other than foundation retrofit. In bridges, for example, micropiles can serve as the permanent foundation elements or can be used in temporary suppor

    Jan 1, 2009

  • AUSIMM
    The Wakamarina Gold-Scheelite-Quartz Lodes, Marlborough, New Zealand

    By R L. Brathwaite

    The gold-scheelite-quartz lodes of the Wakamarina valley were the most productive of the mesothermal gold-bearing areas in the Marlborough Schist. Most of the production came from the Empire City and

    Jan 1, 1995

  • SAIMM
    Evaluation Of The Behaviour Of High-Density Tailings Deposition - CODELCO Pilot Plant - Synopsis

    By J. Engels

    CODELCO is considering the implementation of high-density tailings management at the Chuquicamata mine in northern Chile for its long term disposal plan. To achieve this, CODELCO commissioned the desi

    Jan 1, 2012

  • NIOSH
    RI 6027 Hydrogenation Of Coal To Gaseous Hydrocarbons ? Summary

    By Raymond W. Hiteshue

    Experiments were conducted al temperatures of 480° to 800° C. and hydrogen pressure of 6,000 p.s.i.g. to determine the effect of coal residence time on the conversion of a high-volatile bituminous C c

    Jan 1, 1962

  • SME
    Ground Freezing Under the Most Adverse Conditions: Moving Groundwater

    By Paul C. Schmall, Lucian P. Spiteri, Arthur B. Corwin

    Moving groundwater is generally recognized as the most adversarial condition for ground freezing. Moving groundwater can occur due to natural or man-induced groundwater flow, but either way may result

    Jan 1, 2007

  • SME
    Pitfalls And Lessons Learned In Pump Station Construction

    By Steven R. Lowe

    Construction of a pump station, consisting of an inlet chamber, wet well and pump chamber, required excavation to a depth of 9.7 m (32 ft) below ground surface and more than 7.6 m (25 ft) below the gr

    Jan 1, 2011

  • SME
    Field-Scale Investigation Of Pulverized Coal Mill Power Consumption

    Twenty field-scale tests were conducted in a 28 MW pulverized coal power plant in Healy, Alaska, to examine mill power consumption in relation to coal grind size. The intent in this field-scale study

    Jan 1, 2008

  • DFI
  • SME
    Application Of Modern Technology In Today’s Limestone Quarry Operation

    By B. Moore, Y. J. Zhang

    In today’s competitive dimensional stone business environment, use of available technology is critical to achieve and maintain a competitive advantage. Awareness of improvements in diamond cutting tec

    Jan 1, 2004

  • ISEE
    Pressure Measurements in a Low Density Explosive

    By Guillermo Silva, P. Katsabanis

    The conventional approach to design wall control blasts relies on the borehole pressure as the most important explosive parameter. Borehole pressure is intimately linked to explosion pressure, which i

    Jan 1, 2003