Search Documents

  • CIM
    Integrated Underground Mining and Processing Of Massive Sulphide Ores

    By Bern Klein, Malcolm Scoble, Justin Widdifield, Andrew Bamber

    "It has been suggested that the pre-concentration of ore underground can bring positive economic and environmental benefits to underground mining, particularly at extreme depth. The integration of min

    Jan 1, 2006

  • AIME
    Technical Papers and Discussions - Physical Metallurgy - Young's Modulus-Its Metallurgical Aspects (Metals Tech., Dec. 1945, T. P. 1936, with discussion)

    By David J. Mack

    A survey and critical appraisal of published information about Young's modulus was originally made by the writer because of a complete lack of information about this very important quantity in wo

    Jan 1, 1946

  • AIME
    Geophysics - Progress and Prospects

    By Sherwin F. Kelly

    One of the most succinct and illuminating perspectives of the field of geophysical exploration to appear in recent years is an article by E. A. Eckhardt, in the magazine Geophysics for October 1949. A

    Jan 1, 1950

  • SME
    A study on the optimum arrangement of buoyancy module for stability of marine flexible riser using genetic algorithm & multi-body dynamic simulation

    By Tae-kyeong Yeu, Cheon-Hong Min, Hyung-woo Kim, Sup Hong, Minuk Lee, Chang-Ho Lee

    This paper concerns the optimum arrangement of the buoyancy module, which is used for stable dynamic motion and structure stability of the marine flexible riser. The main method of this study is simul

    Sep 1, 2014

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • NIOSH
    OFR-171-83 Noise Reduction Of Chain Conveyors - Volume II

    By A. Galaitsis

    This report summarizes part of the work performed under the USBM Contract No. H0155113, "Noise Abatement of Continuous Mining Machines." It reviews, briefly, the aboveground tests performed on a Jeffr

    Jan 1, 1983

  • AUSIMM
    Geometallurgy - What do you Really Need to Know from Exploration through to Production?

    By K Ehrig

    You are a geologist, geometallurgist, or metallurgist/process engineer and are fortunate enough to work for an organisation who asks you to design/execute a geometallurgy program. What seems like a si

    Jul 15, 2013

  • IOM3
    Evaluation of wastes from marble quarries as paint fillers

    By D. C. Kaliampakos, A. K. Moutsatsou, J. K. Skotaras

    The wastes from marble extraction in the Thasos- Kavalla-Drama region of northeastern Greece could be utilised as a new source of high-quality white carbonate fillers for the European market. Large de

    Jun 18, 1905

  • AUSIMM
    Flow of Compressed Air in Pipes

    COMPRESSED air is held in high esteem by the mining engineer as a medium for the transmission of power. The transmission, however, is accompanied by a high percentage of loss. Of the total work done b

    Jan 1, 1918

  • NIOSH
    OFR-79-78 Fabrication And Evaluation Of Optimized Operator Compartments

    By Hanns J. Billmayer

    Optimized Operator Compartment layouts based on previous Bureau of Mines activities in standardization and optimization of controls were designed and installed in three operating vehicles. Two Nationa

    Jan 1, 1976

  • TMS
    Plant-Wide Process Control For The Collahuasi Project

    By Alex Del Castillo

    The mineral processing industry has followed the development of database control systems, and various systems have been installed in existing and new plants. The goal is to improve product quality, ra

    Jan 1, 1999

  • NIOSH
    OFR-23-85 Comprehensive Planning For Strip Mining Reclamation In Dry Regions With Emphasis On Water Harvesting

    By John L. Thames

    The benefits of water harvesting as an alternative to conventional reclamation were demonstrated on the Peabody Coal mines in Northeast Arizona. The project produced food crops for four years, and dem

    Jan 1, 1984

  • AIME
    Technical Papers and Notes - Institute of Metals Division - Concerning the Mechanism of Resistivity Recovery Observed in Cold-Worked Molybdenum

    By H. R. Peiffer

    Recently artin has indicated that the recovery of resistivity at 145°C following elongation of molybdenum at room temperature was the result of the annihilation of vacancies. The activation energy for

    Jan 1, 1959

  • CIM
    Experiences from Implementation of Advanced Process Control Projects

    By E. Sharifi

    Advanced Process Control (APC) has been one of the most beneficial tools in the past decades available to minerals processing industry. Low capital cost together with significant improvements in proce

    Jan 1, 2014

  • SAIMM
    A Philosophical View On The Testing Of Rock Support For Rockburst Conditions ? Synopsis

    Physical testing of rock support for rockbursting conditions has been carried out for over 40 years. A review of this testing shows that it has been mostly component?based, rather than actually testin

    Jan 1, 2012

  • NIOSH
    OFR-33-74 Truck Fire Protection System Validation - Final Report-Executive Summary - Introduction And Summary - Introduction

    Development of automatic fire protection systems for large, mobile mine haulage equipment was initiated under Department of Interior's Bureau of Mines-FMC Corp. contract H0122053, "Improved Senso

    Jan 1, 1974

  • AUSIMM
    A Simple On-Stream Xanthate Monitor

    On-stream determination of xanthate concentrations can be made by photometric measurements at 313 nm.A simple double-beam instrument was developed for this purpose. A mercury lamp is used as the light

    Jan 1, 1973

  • NIOSH
    MLA 17-87 - Mineral Resources Of The Silver Peak Range North Wilderness Study Area, Esmeralda County, Nevada ? Summary

    By Terry J. Close

    U.S. Bureau of Mines personnel studied the 33,900-acre Silver Peak Range North Wilderness Study Area (NV-060-338), in order to evaluate its identified mineral resources. The area studied lies between

    Jan 1, 1987

  • IIMP
    Modelo prefabricado para salidas de emergencias en minas subterráneas

    By Roberto Bria

    El presente texto describe el módulo prefabricado para las salidas de emergencia. En este sentido, el sistema modular prefabricado busca facilitar y agilizar la instalación de salidas de emergencia de

    Sep 21, 2013

  • SME
    Ground Support Systems for Heavy, Squeezing Ground at Burgin Mine

    By Donald O. Rausch, William E. Hawkes, Odin Jr. Strandberg

    INTRODUCTION Kennecott Copper Corp.'s Tintic Div. Burgin mine is a 725 t/d (800 stpd) lead-zinc producer, located in the east Tintic mining district, 5.6 km (3.5 miles) east of Eureka, and 130

    Jan 1, 1982