Vibration Reduction to Presere the Integrity of an Aboriginal Rock Shelter Near Blast OperationsBy D P. Blair
Rio Tinto’s Hope Downs Operations are currently mining iron ore in their South Central Pit. Prior to the commencement of mine operations, Hope Downs carried out an extensive archaeological investigati
Nov 8, 2011
-
Seismic Stability Analysis of Sangan Iron Mine Project Tailings DamBy N Ganjian, A Delavar, F Rashidi Nejad
Iran is one of the most seismically active countries in the world, being crossed by several major fault lines that cover at least 90 per cent of the country. As a result, earthquakes in Iran occur oft
Jul 27, 2015
-
Evaluation of Limestone Covers and Blends for Long-Term Acid Rock Drainage Control at the Grasberg Mine, Papua Province, IndonesiaBy J Andrina, D Richar, R Smart, A Neale
The Grasberg is a large copper and gold open pit mine operated by PT Freeport Indonesia and located in the high equatorial mountains of Papua Province, Indonesia. The climate is alpine/sub-alpine with
Jan 1, 2003
-
Computer-Based Resource Estimation in Accordance with the 1999 JORC CodeBy P Hanna
Following the Busang fiasco, more detailed guidelines were appended to the latest revision of the JORC Code released in September 1999 (JORC, 1999). Although the definitions and terminology essentiall
Jan 1, 2000
-
Sampling for Realisation-The Practice in JapanMost mineral products exported from Australia to Japan, with the notable exception of coal, are purchased with weight and quality determined on discharge. Sampling of imported minerals for purpose
Jan 1, 1976
-
Aligning Resource Estimates with Mine PlanningBy D Kentwell
A resource model serves two main purposes depending on the stage of a project. The first is to provide an early indication of likely tonnages and grades at certain cut-offs so that decisions can be ma
Nov 24, 2014
-
REFLUX versus hydraulic classifier – a comparative analysis for hematite concentrate cleaningBy E Bouchard March, F Lavoie, B Legare, K Bourassa
Quebec Iron Ore (QIO), a subsidiary of Champion Iron Limited (Champion), completed the restart of the Bloom Lake iron ore mine located in the heart of the Labrador Trough region of Northern Quebec, Ca
Nov 8, 2021
-
Optimisation of constant rate of loading slurry consolidometer testing of fine-grained coal tailingsBy D J. Williams, S Islam
Fine-grained coal tailings slurry undergoes only limited settling and self-weight consolidation, and tends to remain slurry-like and unsuitable for conventional laboratory consolidation testing. In ad
Jul 23, 2018
-
Recovery and Removal of Uranium by Using BiosubstancesBy Nakajima A
Some attempts were made to recover uranium from aqueous systems by using various biosubstances including microbial biomass. Of hundreds species of microorganisms tested, extremely high uranium absor
Jan 1, 1993
-
Technical Challenges Faced With Extracting a Transverse Pillar at Mount Isa Mines, Xstrata CopperBy A Winchester, D Grant
The massive 1100 Orebody in Mount IsaÆs X41 Copper Mine has been extracted over the last 40 years form north to south utilising sublevel open stoping methods.De velopment has continually stepped ahead
Jan 1, 2005
-
Steve and Fred would have been mates – a comminution design evolution storyBy D David
Amongst those whose task it is to design tumbling mills and other comminution machines there is an almost religious divide between devotees of the Bond method and devotees of other methods developed i
Sep 11, 2017
-
The Anchor Mine Operation (52dfa9d7-8b17-4c08-b69e-95fca5390990)This paper reviews the development and operation of a small underground tin mine in NE Tasmania. Tin mineralisation was discovered in the Lottah area in the 1880's with early alluvial and eluvial
Jan 1, 1990
-
Laboratory evaluation of ventilation effects on the self-heatingincubation behaviour of high volatile bituminous coalsBy B Beamish
The concept of a ‘critical velocity zone’ in the longwall goaf environment for the development of a spontaneous combustion event has been supported by numerical modelling. However, there is no experim
Oct 12, 2022
-
Future Climate – Is Heat Stress a Real Risk for the Future and How Can We Better Manage It?By C Killip
Working in Australia’s harsh climate can have a significant impact on the health, safety and productivity of our teams, but is our working environment expected to be more prone to heat stress in the f
Nov 4, 2015
-
Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushersBy J V. Mehrabani, A R. Sayadi
Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul
Sep 26, 2011
-
Precision Analysis of Iron Ore Sampling, Preparation and Measurement -Overcoming Deficiencies in the Current Standard ISO 3085At Cliffs Natural Resources Ltd (CNR) crushing and shipping sample stations, precisions are estimated for the sampling, preparation and measurement stages of iron ore sampling in accordance with ISO 3
Mar 1, 2010
-
Use of Paste for Tailings Disposal (b5c201be-4c25-4c8e-a498-2a2e4672d3d4)By Shillabeer J
Paste backfill has been adopted by many underground mines in North America and a growing number elsewhere. Paste offers a number of advantages. This paper suggests wider applications of paste techno
Jan 1, 1998
-
Flotation Mechanism Design for Improved Metallurgical and Energy PerformanceBy R Coleman
The flotation mechanism plays a key role in the flotation process. It is used to provide the contact between solid particles and bubbles and also the energy for these particles and bubbles to attach.
Aug 8, 2011
-
The Paddington Gold Mine Project a Case StudyIn 1980 Pancontinental Mining Limited decided that while the Jabiluka uranium project was still a major focus of the company's efforts some diversification was necessary. At this time it was
Jan 1, 1986
-
Comparison of Acid Production From Pyrite and JarositeBy M Berndt
Four siltite-argillite rock samples were characterised (particle size, chemistry, mineralogy) and subjected to laboratory dissolution testing for 36 to 298 weeks. In two samples sulfur (0.99, 1.69 wt
Jan 1, 2003