Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Stability of Hydraulic Backfill Barricades (eefd356e-6d40-4b19-af58-7f0537046a1f)

    Hydraulic backfill is generally retained in slopes using permeable barricades. Mitchell et a! (1975), Mitchell (1992) and Grice (1989) have shown that under normal drainage conditions, barricades e

    Jan 1, 1998

  • AUSIMM
    Mining and Handling of Nauru Phosphate Rock

    Nauru Phosphate, which is one of the world's highest grade deposits discovered to date, contributed in 1969, 2.2 million tons of the total world production of 77.7 million tons. Phosphate produ

    Jan 1, 1971

  • AUSIMM
    Quantifying the Economic Risk of Suboptimal Mine Plans and Strategies

    By J C. de Vries

    When times are tough in the mineral industry û as they have been for some time û typical responses by mining companies are to cut costs and/ or increase production. The latter is seen to spread fixed

    Jan 1, 2003

  • AUSIMM
    Paper No. 163. The Mining And Metallurgy of Copper, Silver, Lead, and Zinc

    In order that the processes seen may be followed in their proper 'order, the subject will be dealt with as follows, (1) Wallaroo and Moonta Mines; (2) Wallaroo and Moonta Mines Smelting Works; (3

    Jan 1, 1907

  • AUSIMM
    The Underground Quarrying of Backfill Material - A Potentially Viable Option

    By A C. Robertson

    Studies by Tennent, Isokangas Pty Ltd (TIP) have indicated that underground quarrying of backfill may be a cost competitive option for providing backfill for specialised situations in underground mini

    Jan 1, 1998

  • AUSIMM
    Studies on the Scale-Up of Ball Mills

    By Whiten WJ, Narayanan S

    Data from ball mills of a wide range of sizes are analysed using detailed mathematical models and non-linear least squares fitting techniques. This analysis reveals that the relative power ineffici

    Jan 1, 1978

  • AUSIMM
    The Evolution of Stope Backfill at Olympic Dam Operations

    Backfil ling of excavated Sub Level Open Stopes has been underway since March 1989 and as at December 1992 some 1 100 000 cubic metres of Cemented Aggregate Fill have been placed. During these three y

    Jan 1, 1993

  • AUSIMM
    Mining Geophysical Methods for the 21st Century

    To help meet the challenge of mine finding at the start of the 21st century, the exploration geophysicist will have at his command a powerful range of tools, some new, some improved, and some whic

    Jan 1, 1986

  • AUSIMM
    Telfer Commences Underground Mining - A Case Study

    Newmont Australia Limited has for some 15 years mined a number of large open cuts associated with the Telfer Gold Dome deposits. The principal ore body exploited has been the East Flank of the Main

    Jan 1, 1991

  • AUSIMM
    Low Shock Energy Emulsion Based Wet Hole Explosives

    By Moxon N. T

    A series of low shock energy water resistant emlulsion based explosives have been developed by combining inert materials, such as Perlite P500, into the formulation. The material handling, water res

    Jan 1, 1990

  • AUSIMM
    Methane Drainage Investigation as a Method of Control of Outbursts at West Cliff Colliery

    By Griffiths L, Marshall P

    fhis paper describes investigations into drainage of gas from the solid to control outbursts. Initial studies conducted on drainage of shear zones showed that, given enough time, these can be succ

    Jan 1, 1980

  • AUSIMM
    Gold mineralisation on Woodlark Island, Papua New Guinea

    By Shatwell DO, Hayward SB, Leach TM

    Following acquisition of the Woodlark Island tenement by Highlands Gold Limited, an exploration programme using extensive diamond drilling has confirmed that the style of gold mineralisation is simila

    Jan 1, 1994

  • AUSIMM
    A systematic approach of sample selection to predict processing performance of an ore body

    By K Tungpalan, E Wightman, M Edraki, E Manlapig, L Keeney

    The depletion of easily mined high-grade ore bodies resulted in the industry having to exploit lower grade, complex resources (Albanese and McGagh, 2011; Darling, 2011; Randolph, 2011). The trend is n

    Nov 21, 2018

  • AUSIMM
    Designing and Operating Heap Leaching Processes with Both Eyes Open

    Process engineering principles are used to analyse the features of leaching processes for large masses of low grade, unprocessed ore. Different performance characteristics are related to the numerou

    Jan 1, 1994

  • AUSIMM
    Primary vertical Crafter Retreat Mining at the Zinc Corporation, Limited

    By Hebbard GJ

    Vertical crater retreat mining is being used at Zinc Corporation, Limited and New Broken Hill Consolidated, Limited for pillar recovery between previously mined and filled stopes. In order to increase

    Jan 1, 1985

  • AUSIMM
    Commissioning of Production Blasting with the EXEX 1000 Electronic Delay Detonator Sytem

    By Jones M

    The concept of precise, accurate timing with Electronic Delay Detonators (EDDs) was first seriously addressed in the mid-1980s and much was made of the cheapness and profusion of digital watches in

    Jan 1, 1995

  • AUSIMM
    Strata Mechanics of Pillar Extraction Goaf Edges

    By Chaturvedula V. K

    Pillar extraction carried out using various methods (split and lift, Wongawilli and Old Ben) involves the formation of narrow fenders (commonly 7 m of coal) formed by driving "splits" for lifting

    Jan 1, 1992

  • AUSIMM
    Cornish Beam Engines in Early South Australian Mining

    South Australia was founded as late as 1836, forty- eight years after New South Wales, yet within five years had announced the first discovery of metals in Australia. Throughout the 1840s the mining

    Jan 1, 1987

  • AUSIMM
    Some Coal Washing Developments in Australia

    Coal washing practice can be improved not only by critical examination of the plant being operated but also by studying plants operated in other areas. The developments at the Australian Iron & Steel

    Jan 1, 1975

  • AUSIMM
    The Composition of Some Copper Slags From Port Kembla

    INDEX OF CONTENTSBlast Furnace SlagsForehearth AccretionsConverter SlagsConclusionsIllustrationsCOMPOSITION OF SOME COPPER SLAGS FROM PORT KEMBLASamples of copper slags from the Port Kembla Smelter of

    Jan 1, 1949