Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The use of Multispectral Remote Sensing to Map Reclaimed Areas at Highland Valley Copper

    By Mark Richards

    Highland Valley Copper is a large, open-pit copper mine in the southern interior of British Columbia. Reclamation has been in progress on the site since 1987. Some 6,300 hectares will have been distur

    May 1, 2003

  • CIM
    Development of Flowsheet and Reagent Scheme for the Treatment of Martison Lake Phosphate Niobium Ore

    By S. M. Bulataovic, D. M. Wyslouzil

    "The Martison Lake phosphate-niobium deposit is composed of unconsolidated residuum containing clay and silt-size particles of phosphate, niobium, iron and clay minerals. This paper deals with the lab

    Jan 1, 1986

  • CIM
    Where Did the Gold and Silver Go? (f8d50070-6e64-4c07-a792-b7c79c525953)

    By John C. Loretto

    "Answers to some of the problems ofRecovery and Metallurgical AccountingIn Gold and Silver Hydrometallurgical PlantsThe start-up over the last few years of new hydrometallurgical plants for the recove

    Jan 1, 1982

  • CIM
    Study on Acoustic Wave Propagation in Fractured Rock Mass under High In-Situ Stress of Model Test and Damage Constitutive Relation (da00ca07-9cc1-45ad-9211-b9f1f4c94af2)

    By Hang Zhao, Xinping Li, Pingan Wu, Yi Luo

    The deep-buried rock surrounding the Jinping II Hydro-power Station was taken as the engineering background. Using model specimens of classified rock materials to simulate fractured rock mass under hi

    Jan 1, 2015

  • CIM
    The Economic of Energy Conservation in Heated Crushing Plant

    By E. Norton

    "Even though the subject of this panel discussion is dust control, rather than dwell on the design aspects of dust collection systems which are well documented in numerous publications, :it was consid

    Jan 1, 1976

  • CIM
    Cathode catalyst layer as the watershed in PEMFC

    By M. Eikerling

    The full competition between mass transport and reaction in PEMFC unfolds in cathode catalyst layers (CCLs). Recently developed models provide vital insights into effects of thickness and composition

    Jan 1, 2005

  • CIM
    The Start-up and Operation of the Gibraltar Mines SX-EW Plant (e864bb9e-42ee-4b0f-8109-3374578f0d92)

    By J. C. O'Rourke

    "Gibraltar Mines Ltd. has been operating its open pit copper mine for fifteen years. In that time over 140 million tons of waste and low grade material has been placed on the mine waste dumps. Laborat

    Jan 1, 1988

  • CIM
    The Effect of Stope Inclination and Wall Rock Roughness on Backfill Free Face Stability

    By A. P. E. Dirige

    In order to maximize the recovery of ore in variably dipping ore zones of moderate width, cemented backfill is normally placed to serve as structural support. With the intention of saving on costs, ba

    May 1, 2009

  • CIM
    Optimal Synthesis of Energy Supply Systems for Remote Open Pit Mines

    By M. Carvalho

    The primary motivation underlying the proposal of polygeneration systems for mine sites is to increase the efficient use of natural resources by combining different technologies and energy resources w

    Aug 1, 2013

  • CIM
    Lessons Learned from Wide Area Risk Assessment Studies of Mining and Smelting Sites

    By E. Sigal

    Overview ?Intrinsik has completed several wide area HHRA and ERA studies of mining and smelting communities ?Several ?Lessons Learned? ?Key areas related to: ?Study Design ?Data Quality ?Bioac

    May 1, 2009

  • CIM
    Surface Interaction between Biopolymers as Bioflocculants and Clay Minerals in Mining Tailings

    By N. Molaei, E. R. Bobicki

    The continued demand for mineral products, coupled with the depletion of high-grade ore resources, has led to the mining of lower grade ores, which often require fine grinding to achieve mineral liber

    Jan 1, 2019

  • CIM
    An Intelligent System for Monitoring Tower Cranes on Construction Sites

    By M. A. Nadar

    Harsh and dynamic construction sites are generally equipped with cranes in order to rapidly and conveniently move heavy loads from one location to the other. If not properly inspected and managed, thi

    Aug 1, 2013

  • CIM
    Decarbonisation of the Outotec® Ausmelt Process

    By Jacob Wood, Robert Matusewicz

    The Outotec® Ausmelt Top Submerged Lance (TSL) Process has achieved widespread commercial acceptance over the past 40 years for the processing of copper, nickel, lead, tin, zinc and precious metal bea

    Jan 1, 2019

  • CIM
    Thermodynamic and Process Evaluation of Direct Blister Copper Smelting

    By Xian Jian Guo, Lei Li, Hua Wang

    Direct smelting of copper concentrate to blister copper has the advantages of energy saving and environmental protection. There has been a lot of effort invested in process development including test

    Jan 1, 2019

  • CIM
    Computer Control of a Flotation Circuit

    By M. Amsden

    "Since the computer program is far from complete this must be only a brief progress report on the computerization of flotation metallurgy at the Ecstall concentrator at Timmins.Ecstall is currently tr

    Jan 1, 1971

  • CIM
    Geochemical Characteristics of the Paleozoic Sedimentary Rocks in the Winnemucca Quadrangle, Nevada, U.S.A.—Background Values for Gold Exploration (6b443b5c-ea0d-4a12-805c-382a3d930636)

    By L. C. Hsu, M. O. Desilets, P. J. Lechler, Jr. Bonham, J. G. Price, L. J. Garside

    Geochemical background levels have been established for unmineralized sedimentary rocks that are elsewhere the hosts of Carlin-type gold deposits in the Getchell Trend. The Paleozoic rocks in the Winn

    Jan 1, 1995

  • CIM
    Deportment Behaviour of Tin in Copper Smelting

    By Chunlin Chen

    Published data on thermodynamics of tin in liquid copper, matte and slag have been reviewed, assessed and used in development of thermodynamic solution models of melts. The developed model/database wa

    Jan 1, 2019

  • CIM
    Speciation of Iron-Arsenic-Copper-Sulfuric Acid Solution during Copper Electrorefining from 25°C to 70°C

    By Yongteng Dong, John P. Quinn, Bradford Wesstrom, Guikuan Yue

    With increasingly low-grade copper ores being mined, it is difficult to handle growing concentrations of As, Sb, Bi and/or Fe in the whole flowsheet, especially during copper electrorefining. To bette

    Jan 1, 2019

  • CIM
    Back-analysis of the Extreme Squeezing Conditions in the Exploratory Adit to the Lyon-Turin Base Tunnel

    By G. Russo

    During the construction of the S.Martin La Porte access adit, 9m in diameter, extreme squeezing conditions occurred while crossing Carboniferous schistose formations, with diametric convergence up to

    May 1, 2009

  • CIM
    Global Survey of Copper Electrorefining: 2019 World Tankhouse Operating Data

    By Tim Robinson, Michael S. Moats, William G. Davenport, Andreas Filzwieser, Andreas Siegmund, Shijie Wang

    This survey continues the long tradition of providing a snapshot of operating data from industrial electrorefineries. It is a supplement to previous surveys that were performed in 1987, 1991, 1995, 19

    Jan 1, 2019