Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Sandwich Wall Beneath Amsterdam Centraal Station - An Innovative Approach For Jet Grouting Under Difficult Conditions

    By J. C. W. M. de Wit

    An excavation, within which a tunnel is sunk as a part of the Centraal Station underground station (platform section) of the Noord/Zuidlijn ('North/South Line'), is to be created beneath the

    Jan 1, 2006

  • DFI
    Load Testing Of Deep Foundations Using The Osterberg Load Cell

    By David E. Thompson

    This paper describes the full-scale field load testing of three deep foundation units using the Osterberg Load Cell. The load tests were completed on three separate projects, two in Massachusetts and

    Jan 1, 1989

  • DFI
    Geotechnical Exploration Phase Drilled Shaft Load Testing

    By Walter E. Vanderpool

    Full scale load tests are frequently performed immediately prior to deep foundation construction to verify the design assumptions. Occasionally, load tests are performed during design development and

    Jan 1, 2011

  • DFI
    Pile Design, Testing, And Installation For A Gated Dam ? Synopsis

    By B. H. Moore

    The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori

    Jan 1, 2010

  • DFI
    Soil Improvement Technique to Mitigate Extreme Settlements on Deep Compressible Deposits in the Bogota Valley

    By Roger A. Archabal, Omar A. Conte, Gustavo Langoni

    This international case study focuses on the rigorous geotechnical interaction and results of a soil improvement program utilized to mitigate consolidation settlements of over 1.5 m [5.0 ft]. The extr

    Jan 1, 2018

  • DFI
    Current Pile Foundation Practice In Taiwan ? Synopsis

    By Za-Chieh Moh

    This paper presents a summary of the current pile foundation practice in Taiwan. Constructions of driven piles, drilled shafts, and barrette foundations are reviewed. This paper also briefly summarize

    Jan 1, 1996

  • DFI
  • DFI
    Hand-Dug Underreamed Piles At Embankment Place, London

    By W. J. Grose

    The Embankment Place office development over the platforms of Charing Cross Railway Station in London has presented many interesting and unusual problems to the engineers involved with the project. Th

    Jan 1, 1989

  • DFI
    Dynamic Pile Testing In Soils Exhibiting Set-Up - Introduction

    By Juan M. Antorena

    A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio

    Jan 1, 1995

  • DFI
    Downtown Seattle Transit Project - International District Station

    By Richard K. Sandaas

    Start Date: April 4, 1988 Completion Date: Dec. 29, 1989 Contractor: SCI Contractors Past and present transportation centers will come together at International District Station, located at th

    Jan 1, 1990

  • DFI
    Argosy Casino Expansion: Open Cell Sheet Pile® Harbor Project

    By Michael Lane

    With the success of their existing casino operation on the Ohio River in Lawrenceburg, Indiana, the Indiana Gaming Co., LP planned a major expansion of the current facilities. This expansion includes

    Jan 1, 2008

  • DFI
    Case Studies In Mission Bay, San Francisco: Deep Foundations In Challenging Soil Conditions

    By Lori A. Simpson

    Mission Bay is a 300-acre reclaimed site in San Francisco, California, that is currently being redeveloped. Plans include new neighborhoods, parks, a new University of California, San Francisco, rese

    Jan 1, 2006

  • DFI
    Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2013

  • DFI
    Railroad Bridge Approach Embankment Settlement Mitigation

    By Moi Arzamendi, Jose Ramirez, Kenneth Kniss, Sunil Arora, James Gingery

    Construction of a new approach embankment for a railroad bridge over a river in Southern California required placing up to 12 ft of fill over soft to medium stiff silts and clays along an approximate

    Jan 1, 2018

  • DFI
    Practical Experience With Nondestructive Testing Of Augered Cast-In-Place Piles

    By Bernard H. Hertlein

    All methods of deep foundation construction present challenges to the contractor and engineer that vary according to the method employed, and the geotechnical conditions in which it is being used. Aug

    Jan 1, 1997

  • DFI
    Conference Papers - Conference Papers: Session 1 - Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project

    By H. Boghosian

    This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w

    Jan 1, 2006

  • DFI
    Piling The Gateway To Europe

    By Howard Roscoe

    Linking Ashford International Station to the new Channel Tunnel Rail Link required over 5000 rotary bored and CFA (continuous flight auger) piles to form tunnel walls and viaduct foundations and to su

    Jan 1, 2002

  • DFI
  • DFI
  • DFI
    Slurry Wall Design For Hong Kong Station

    By Stephen T. Young

    The construction of Phase 2 of Hong Kong Station, its retail podium and International Finance Centre Two, the tallest building in Hong Kong, will be completed in the middle of 2003. This paper describ

    Jan 1, 2003