Real Time Integration Of Mining And Metallurgical Information For Efficient Use Of Energy And Water - Preprint 09-133
By O. A. Bascur
The lack of integration of mining and metallurgical information with sufficient detail for analysis causes inefficient operation and hence sub-optimal energy and water use. It is difficult to analyze
Jan 1, 2009
-
Molybdenum Flotation Practice - Cell Type Selection And Design Considerations
Several of the larger copper projects recently built have included a molybdenum byproduct circuit as part of the overall project due to the favorable molybdenum market conditions and overall economic
Feb 27, 2013
-
Stress, Geologic, And Support Design System (SGSSM) For Underground Mine Slopes
By J. C. Stankus
Accurate evaluation of stress and geological conditions is critical to ground control design in underground openings. For a slope entry, the problem is more difficult because a slope will transverse
Jan 1, 2011
-
Identification And Enumeration Of Asbestos Fibers In The Mining Environment: Mission And Modification To The Federal Asbestos Standard
By Arthur M. Langer
Since the promulgation of the first Federal Asbestos Standard by the Occupational Safety and Health Administration in 1972, other federal agencies have modified the standard to better carry on their
Jan 1, 2008
-
Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project
By Brian Fulcher
The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1
Jan 1, 2008
-
Recovering Carbon From Anthracite Using Hindered Settling Column
By J. Kim, H. Cho
The objective of the experiment was to investigate the efficiency of hindered-settling column in recovering carbon from anthracite. Two types of Korean anthracites were prepared for feed materials. Ea
Jan 1, 2002
-
Improving Empire?s Grinding Circuit Performance Using Six Sigma - Preprint 09-059
By H. Walqui
The Empire concentrator was built in four stages, with the latest stage accounting for 50% of the overall plant capacity. Over the past 5 years, the average throughput of the three grinding lines has
Jan 1, 2009
-
MINExpo INTERNATIONAL 2000 Largest Ever Held
By Tim O’Neil
The search for precious metals opened up the American West. And Nevada was right in the heart of this development. In the mid-19th century, prospectors seeking gold roamed the hills of Nevada and di
Jan 1, 2000
-
Enhancements to the LaModel Stress Analysis Program
By R. Hardy
LaModel is a boundary-element program capable of calculating the displacements and stresses in thin bedded deposits such as coal, salt, or potash. Throughout its history, it has continually been upgr
Jan 1, 2006
-
Application of Predictive Maintenance Techniques for Large Electric Mining Shovels – Preprint 97-205
By Michael Lenz
Predictive maintenance technologies including vibration analysis, tribology, infrared thermography, ultrasonic detection, and electrical measurements have been applied to large electric mining shovels
Feb 24, 1997
-
Long-Range Planning Commission - Report of the Management and Organization Committee
By A. Tobey Yu, W. Joseph Schlitt, Alfred Weiss, Frederic L. Kadey, Louis Kuchinic
Introduction The February and April 1984 issues of MINING ENGINEERING have already provided introduction to the long-range planning efforts of the Society of Mining Engineers (SME). These efforts are
Jan 6, 1984
-
Industrial Minerals 2008 - Ball Clay
By R. L. Virta
Editor?s note: Each year, the June issue of Mining Engineering features an industrial minerals review. Several people put in a fair amount of time in developing the material for this issue. Thank y
Jan 1, 2009
-
bauma ’04 Attracts More Than 410,000 Visitors
More than 410,000 visitors from 171 countries helped bauma ’04 set new attendance records at the world’s largest construction machinery and mining technology show. The show, held in Munich, Germany M
Jan 1, 2004
-
Design and Startup of Cortez Gold Mine’s Pipeline Mill
By Randy N. Powell
The Pipeline gold ore body was discovered in Lander County, NV in March 1991. Construction of the new mine and mill did not start until early March 1996. The $289-million project was placed on a fas
Jan 1, 1999
-
Conveyor Pulley Specifications For Aggregates
By D. Keech
The Conveyor Equipment Manufacturers Association (CEMA) specification B105.1 “Welded Steel Conveyor Pulleys” adequately defines standard pulleys for most aggregate material handling applications. How
Jan 1, 2003
-
Underground Construction Is Crucial To Success Of Olympic Games Venues
When the 2008 Olympic Games begin in Beijing, China is September it will not only mark the end of the journey for the Olympic torch and the thou-sands of participating athletes, but the games will als
Jan 1, 2008
-
White Pine Copper-An Environmental And Economic Assessment
By Ronald M. Hays
The White Pine Copper Division of Copper Range Company is a large copper producer operating an underground mine, mill, and smelter on Michigan's Upper Peninsula. Principal water discharges are fr
Jan 1, 1979
-
Successful Application Of Remote Seals Used To Extinguish A Coal-Mine Fire
By D. Bour, C. Nyikos, R. Curtice
Fire in a coal mine can be disastrous on many levels. In most cases, when a fire is detected, mining operations cease and all personnel are evacuated. Underground coal-mine fires are difficult to exti
Jan 1, 2002
-
Subsidence Impacts On Infrastructure And Drainage: Reestablishing A Stable Channel Using Geomorphic Design Principles
By G. Krogman, C. Walla, B. Wood
The Gebo Mining District (District) is located in the Bighorn Basin of Wyoming. Commercial underground coal mining began in 1906 with the arrival of the railroad in Thermopolis, which is located appro
Jan 1, 2006
-
Financing Options For Small Mines—what We Learned In Our Senior Design Project - SME Annual Meeting 2022
By G. V. Campbell, O. T. Holdsworth, M. G. Nelson
A senior design project is required by all accredited mining engineering degree programs. Often referred to as the capstone of a student’s education, this project is expected to include all the import
Mar 2, 2022