Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Pillar Strength and Design Methodology for Stone Mines

    By Gabriel Esterhuizen

    Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd

    Jan 1, 2008

  • SME-ICGCM
    Multiple Seam Mining Interactions: Case Histories from the Harris No. 1 Mine (b50cab1b-ba36-4377-a652-1d452c62f433)

    By Frank E. Chase

    The Harris No. 1 Mine, located in Boone County, WV, has been longwalling the Eagle Coalbed for over 30 years. Harris has experienced numerous interactions associated with the extensive room-and-pillar

    Jan 1, 2005

  • SME-ICGCM
    Catastrophic Failures of Underground Evaporite Mines

    By Jeff Whyatt

    Deformation of underground salt, trona and potash mines is generally time dependent, providing for gradual adjustment of strata to mining induced stresses. Time dependence can allow for higher extract

    Jan 1, 2008

  • SME-ICGCM
    Ground Control for Muliple Seam Mining in German Coal Mines

    By Holger Witthaus

    There is more than a century of experience in multiple seam mining in Germany. In several mines up to 20 seams had been excavated within the last decades. Due to the nature of the deposit and the hist

    Jan 1, 2007

  • SME-ICGCM
    Coupon Testing for Field Assessment of Stress Corrosion Cracking of Rock Bolts

    By Damon P. Vandermaat

    Coupon testing allows for the rapid understanding of a material?s likely behavior in service conditions, allowing engineers and operators to make informed decisions about the likely service-life of pa

    Jan 1, 2012

  • SME-ICGCM
    Roof Pressure Monitoring Using The Integrated Longwalt Automation System By WESTFALIA

    By Ulrich Paschedag

    The WESTFALIA group of companies developer and manufactures underground mining machinery for complete high-performance longwalls. WESTFALIA uses a state of the art electrohydraulic system as the most

    Jan 1, 1994

  • SME-ICGCM
    Coal Pillar Design Formulae Review and Analysis

    By Xinzhi Du

    Coal strength is essential to analyze the stability of excavation in coal. It is well known that the strength of coal tested in the laboratory is size-dependent, and different size specimens will prod

    Jan 1, 2008

  • SME-ICGCM
    Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal Mines

    By A. Wahab Khair

    Coal mining has evolved into extensive use of continuous mining machines for development and production. This has resulted in an increase in dependence on the versatile continuous miners. The present-

    Jan 1, 2008

  • SME-ICGCM
    Geologic Conditions Affecting Mineability in the Jane Mine.

    By Stephen J. Harven

    Geologic conditions in eight northern operating sections of Jane Mine, Keystone Coal Mining Complex. Armstrong County, Pennsylvania are defined by utilizing drillhole data and underground geologic map

    Jan 1, 1987

  • SME-ICGCM
    Mitigating the Effects of High Horizontal Stress on Ground Control in An Underground Stone Mine: A Case History

    By John Ellenberger

    The nature of a stone deposit is rarely defined through exploration and engineering design, but more through the actual experience encountered as the mine develops; hence, issues with ground control a

    Jan 1, 2012

  • SME-ICGCM
    Characteristics of Seismic Field Generated by Bed Separation and Application Seismic Technique for Exploration of Bed Separation and Grouting Research

    By Jiulong Cheng

    Underground coal mining causes overburden deformation and failure, one major form of which is bed separation in the overburden. Surface subsidence can be controlled by injecting grout into the bed sep

    Jan 1, 2006

  • SME-ICGCM
    Pillar Stability Issues Based on a Survey of Pillar Performance in Underground Limestone Mines (08bccb54-5d4b-443a-860e-90b5a6841ec3)

    By Gabriel S. Esterhuizen

    A survey of pillar conditions was carried out at 21 operating limestone mines that use the room-and-pillar method. The surveyed pillars were all located in rock that was classified as ?Good? to ?Very

    Jan 1, 2006

  • SME-ICGCM
    Correlation of Sonic Travel Time to the Uniaxial Compressive Strength of U.S. Coal Measure Rocks

    By David Oyler

    Sonic travel time logging of exploration boreholes is routinely used in Australia to obtain estimates of coal mine roof rock strength. Because sonic velocity logs are relatively inexpensive and easy

    Jan 1, 2008

  • SME-ICGCM
    Multiple Seam Highwall Mining In Appalachia (428a0473-c28a-4ef9-81d1-1ed7e6911c69)

    By David Newman

    Multiple seam underground coal mining is ubiquitous in Appalachia. Many coal properties have from two to ten or more economically mineable coal seams. Because of the ability to penetrate 600-feet to

    Jan 1, 2009

  • SME-ICGCM
    Development of a Risk Rating System for Use in Underground Coal Mining

    By Johann van Wjk

    Mandatory Codes of Practice to Combat Rock Fall Accidents came into force on South African Collieries in 1997. These were drawn up in accordance with guidelines issued by the Chief Inspector of Mines,

    Jan 1, 2002

  • SME-ICGCM
    Relocating Mining?Induced Seismicity at the Trail Mountain Mine

    By Meagan S. Boltz

    From October 2000 to April 2001 a local array of fourteen seismograph stations was deployed at the Trail Mountain Mine (TMM), an underground coal mine in Emery County, Utah, to locate mining-induced s

    Jan 1, 2012

  • SME-ICGCM
    Non-confirmation Mathematics for Wall Rock Classification for Mine Support

    By Guangyi Sun

    Wall rock classification method for coal mine support is the main factor affecting mine support. It is greatly affected by the combined effect of randomness, fuzziness and human being's incomplet

    Jan 1, 2005

  • SME-ICGCM
    Mine Stability Mapping

    By Collin L. Stewart

    The high cost and limited flexibility of modern longwall systems has resulted in the need for mine engineers and geologists to predict possible adverse mining areas ahead of mining and to then design

    Jan 1, 2006

  • SME-ICGCM
    Proposed Criteria For Subsidence Damage To Buildings (d2ee0f1e-295b-4fb1-ab17-d19f1e17df4a)

    By Swapan Bhattacharya

    United States federal and state regulatory authorities require underground mine operators to adopt adequate measures to minimize material damage to the surface caused by nine subsidence. This paper pr

    Jan 1, 1984

  • SME-ICGCM
    Strata Management with Ground Behavior Assessment for Mass Exploitation of Coal Deposits: A Case Study of Continuous Miner

    By Sanjay Kumar Singh

    The mechanics of load transfer in bord-and-pillar mining is not well understood despite the evolution of the art of pillar extraction over the last 20 years via trial and error (empirical) or Rock Mas

    Jan 1, 2012