Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Biodegradation of manganese dioxide tailingsBy Madgwick J. C
Microaerobic biodegradation oflow-grade manganese dioxide slurry tailings was demonstrated in enrichment cultures treated with dilute molasses at 30°C and pH 5·8. Supplementary nitrogenous n
Jan 1, 1986
-
The Extraction Nickel from Nickel Sulphides and Nickeliferous Laterites Using Chlorinated ParaffinsThe passage of chloroform vapour in a carrier of oxygen through two nickel sulphide ores heated to 380°C converted the nickel to the water soluble chloride form. In one ore the nickel (2·75
Jan 1, 1972
-
Human Resources Management at Grey River Gold Mining LimitedGrey River Gold Mining Limited (GRGML) has constructed and largely completed the commissioning of an alluvial gold dredge designed to recover gold from a low grade gold deposit in the Grey River Valle
Jan 1, 1989
-
Proceedings, 107th Annual General Meeting, 2004The 107th Annual General Meeting of The South African Institute of Mining and Metallurgy was held at The Country Club, Johannesburg, Napier Road, Auckland Park on Wednesday, 11 August, 2004. Welcom
Jan 1, 2004
-
Regional geochemical mapping of Pt, Pd and Au over an obducted ophiolite complex, Shetland Islands, northern ScotlandBy D. M. A. Flight, G. E. M Hall, P. R. Simpson
theoretical viewpoints.
Apr 1, 1994
-
Mettalurgical evaluation of iron ore drum separators using density tracersBy Lyman G. J
Dense medium drum separator efficiency was analysed at two Western Australian iron ore concentrators. Efficiency data had hitherto been difficult to accumulate due to the high cost of analysing repres
Jan 1, 1987
-
Integrated Operations for Maximizing ResultsBy D. Schleiss
Reduced access to knowledgeable workers is creating challenges for operations. We are doing more 4D Operations - dirty, dull, dangerous, and distant. Personnel costs in these environments are high, an
Jan 1, 2014
-
Changes In The Seismic Properties Of The Cover Produced By Longwall MiningBy Guoqi He
Common offset seismic data collected over two active longwall panels at different stages of mining reveal that significant arrival time delays are produced in reflections from different levels within
Jan 1, 1989
-
Montreal Meeting - September, 1879Jan 1, 1880
-
Linking the Internal and External Players of the Mining Game - Corporate Public AffairsThe Johnny Mercer lyrics 'You've got to accentuate the positive, Eliminate the negative, Latch on to the affirmative à' would best sum up the traditional approach to community relations
Jun 1, 2010
-
Managing cyclones: A valuable asset, the Copper Mountain case studyBy M. Westendorf, T. Banerjee, S. Kaushik, D. Tinney
"Cyclones are one of the most extensively used pieces of equipment within the mineral processing industry because of their simplistic operating and maintenance philosophies. They are commonly used as
Jan 1, 2014
-
Adsorção Do Azul De Metileno Por Rejeito De Caulim Quimicamente Tratado Visando Seu Uso Na Remoção De Corante Em Solução AquosaBy Verônica Scarpini Candido
Foi notado que o rejeito originado a partir do beneficiamento do caulim é rico em silico-aluminatos, apresentando assim potencial em processo de adsorção. O presente trabalho consiste em avaliar o pot
Oct 30, 2017
-
Effect of Activated Carbon on the Leaching of Cobalt-Rich Ferromanganese Crust in Sulfuric AcidEffect of Activated Carbon on the Leaching of Cobalt-Rich Ferromanganese Crust in Sulfuric Acid
Sep 13, 2010
-
Thermal Effects On Carbon Based Electrodes Close To A High Current Electric ArcBy J. A. Bakken, M. T. Jonsson, G. A. Saevarsdottir, H. Palsson
The electrodes of a Submerged Arc Furnaces carry a high current and are subject to enormous stresses caused by both the electric arc itself, and the current distribution within the electrode. The exte
Jan 1, 2007
-
RI 7785 The K2HfF6-K2ZrF6-1.25 Percent HF System At 40° C With Other Solubility Curves From 25° To 70° CBy Stanley C. Rhoads
The Bureau of Mines investigated the complete ternary system K2 HfF6¬K2ZrF6-l.25 weight-percent HF at 40° C. In addition, solubility curves have been established at 25°, 30°, 500, 60°, and 70° C. Thes
Jan 1, 1973
-
OFR-78-86 Belt Conveyor Maintenance And Installation ProceduresBy Svend [Bue] Rondum
The final report contains a summary of the work performed under this contract, In addition to the report itself, other products were derived from this effort. Several hardware items were prototyped fo
Jan 1, 1982
-
Are REE Exploration Companies Doing Enough and/or the Right Testwork to Avoid Plant Failure?By B. Yu, N. Verbaan, A. Mezei
The recent 20 years witnessed a boom and bust in the nickel laterite industry. Most notoriously is the story of the first three Western Australian nickel laterite projects which all suffered major ram
Jan 1, 2014
-
Using liquid nitrogen for the inertisation of goafsBy D Caley
During the response to the Moura No 4 disaster, use was made of the New South Wales Mines Rescue Service’s ‘Mineshield’ inertisation equipment. The equipment had to be transported from Newcastle, appr
Aug 28, 2017
-
Risk In Project Preparation - ?Determining The Project Needs And The Effects On The Management Strategy?By A. M. Clegg
In general, overall experience has shown that the approach to the appointment of a project manager is given much attention, but little specific attention is given first to the risk associated with the
Jan 1, 2005
-
Dealing with Organic Wastes and Byproducts - One Economic and Environmentally Sound SolutionBy Keet B. A, Waid J. S
The Gippsland Basin is one of Australia's most important producers of petroleum products. An inevitable byproduct of the production, refinement and transport of the millions of barrels of oil i
Jan 1, 1992