Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Use of Ferro-Wastes in Sinter MakingBy P S. Datta, V N. Misra
Higher bed height up to 680 mm, including 30 mm hearth layer of sized return sinter and high suction below the grate bars up to 1400 mm WG have resulted in increasing the productivity to a level of 33
Jan 1, 2002
-
Design Of NATM Tunnels And Stations Of Silver Line Phase III Project In BostonBy Verya Nasri
The Silver Line Phase III Project is the final one mile underground segment of the new Bus Rapid Transit in downtown Boston. The project is expected to significantly reduce existing and anticipated tr
-
Recent Metallurgical Developments and their Impact on Minerals Project ExecutionThis paper discusses the impacts that advances in metallurgy and process engineering have on minerals project execution. Ausenco's business is focused on integrating minerals processing technolog
Sep 13, 2010
-
Discussion – Determination of the Optimum Lifetime of a Mining Project Using Discounted Cash Flow and Option Pricing Techniques – ME Vol.44, No.10 1992, pp.1262-1268 – Cavender, B.By G. Le Bel
The paper proposes three methods to determine optimum lifetime of a mining project1. The conclusion is that the three methods arrive at the same optimum production rate (by coincidence). It is also st
Jan 1, 1993
-
Mineral deposit modelling in relation to crustal reservoirs of the ore-forming elements: summaries of presentations and reports of discussion at sessions held in Keyworth, UK, on 22-23 April 1992By NA NA
Reports of discussion at sessions held in Keyworth, UK, on 22-23 April 1992.
Jan 12, 1992
-
Inclusões Na Formação Da Ferrita Acicular: Caracterização Por Microscopia Eletrônica De TransmissãoBy Juno Gallego
A soldagem de peças de aço por arco submerso é um dos processos mais tradicionalmente usados na fabricação de componentes estruturais. A microestrutura do metal de solda é importante na definição das
Aug 7, 2018
-
Towards Sustainability In Ferroalloy Production ? SynopsisBy L. Holappa
Ferroalloy production is an energy-intensive industrial sector with significant CO2 emissions. In this paper the current situation in ferroalloy processes is discussed from the standpoint of global en
Jan 1, 2010
-
The grate-kiln induration machine - history, advantages, and drawbacks, and outline for the futureBy J. C. Ion, O. Isaksson, J. Stjernberg
Iron ore pellets are a preferred feedstock for ironmaking. One method used for pelletizing is the grate-kiln process, first established in 1960.During the past decade, the establishment of new grate-k
Jan 1, 2015
-
Refractory Design Increases Rotary Kiln EfficiencyBy W. F. Rochow, W. C. Burke
Numerous designs of linings and accessories, including dams, lifters, and heat exchangers, contribute greatly to kiln efficiencies. Greater conductivity is achieved with basic brick than with fireclay
Jan 3, 1955
-
Cyclic Degradation Of Pile Foundations For Offshore Wind TurbinesBy Fabian Kirsch
Cyclic behaviour of axially loaded piles has been an issue since studies revealed that the capability to transfer skin friction into the ground is highly depending on the level and the number of load
Jan 1, 2011
-
Rahmenbedingungen für eine nachhaltige Kohlenutzung in DeutschlandBy F. -J. Wodopia
Sustainability of energy supplies has been an issue of general interest for a long time. Whilst in the past the continuous productive use of natural commodities was in the fore, its compatibility with
Jan 1, 2011
-
Effect Of Some Heating Parameters On Volume Expansion Of BoraxBy B. Kahraman
About 70% of the world?s total boron reserves are located in Turkey. Boron minerals are typically concentrated by attrition scrubbing followed by screening and classification to remove clay minerals a
Jan 1, 2008
-
Lateral Dynamic Response Of Single Inclined PilesBy Amalia Giannakou
This paper utilises 3-D finite-element modeling to study the static and dynamic lateral harmonic response of inclined piles, in a homogenous and a non-homogenous soil, modeled as a linear hysteretic m
Jan 1, 2006
-
Asset Optimisation through Process Control at Xstrata Alloys – Eland Platinum ‘Optimal Doesn’t Always Rhyme with Capital’By Neo Molelekeng, Jocelyn Bouchard, Rebecca Monnapula, Martin Émond
"Xstrata Alloys – Eland Platinum concentrator (South Africa) has recently been commissioned and is now initiating a challenging optimisation program encompassing the entire operation. Process control
Jan 1, 2010
-
Discussion - On nonnegative weights of linear kriging estimationBy Y. C. Kim, F. Szidarovszky
G.M. Philip and D.F. Watson The article cited above reflects the difficulty that is often encountered in interpreting different aspects of kriging. Baafi et al. write : "Due to negative kriging wei
Jan 2, 1987
-
Optimization and Increasing Throughput at JacobinaBy Alexandra Kozak, Rodrigo Costa, Bob Fukuhara
"The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje
Jan 1, 2008
-
Influences of Alkali Fluxes on Direct Reduction of Chromite for Ferrochrome ProductionBy D. Yu, Y. Thibault, D. Paktunc
"Prereduction and flux-aided direct reduction of chromite provide significant advantages in reducing energy consumption and greenhouse gas emissions during ferrochrome production. In this investigatio
Dec 1, 2018
-
Addressing the challenges associated with the modelling of iron ore in vibrating screensBy S Reid, W Chen, T J. Donohue, A Katterfeld
The use of discrete element modelling (DEM) is widespread in the materials handling field, and is used for many applications. One of the important limitations in using DEM is the number of particles t
Jul 24, 2017
-
Variation of Horizontal Stresses and Strains in Mines in Bedded Deposits in the Eastern and Midwestern United StatesBy Dennis R. Dolinar
In general, the direction of the maximum horizontal stress in the eastern United States is fairly well defined. However, the variation of the magnitudes of the horizontal stresses is not very well un
-
The Respirable Dust Center Research Program"The U.S. Bureau of Mines established on August 15, 1983, The Generic Mineral Technology Center for Respirable Dust (Dust Center) within the Mining and Mineral Resource Research Institutes (MRIs) at T
Jan 1, 1988