Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Reorganization of Bulli Colliery with Special Reference to Haulage Problems

    The following is a brief summary of the Bulli Colliery and its method of operation when Australian Iron and Steel Ltd. took control.Bulli Colliery is situated about a mile west of the village of Bulli

    Jan 1, 1947

  • AUSIMM
    The Application of Physical Modelling Techniques to Problems in Tunnelling

    By Enever J, Walton R, Wold M

    Photoelastic and equivalent material model ling techniques for studying stresses and defor- mations and modes of failure in geological and engineering structures are described. The appli- cation of t

    Jan 1, 1976

  • AUSIMM
    Long Tunnel extended Gold Mine, Walhalla-A Recovery and Rehabilitation Project

    By Griffiths J. B

    From its mining lease at the northern end of Cohens Reef at Walhalla in the North Gippsland Mountains, the Long Tunnel Extended Gold Mining Company produced 13,695 kg of gold, which at 1980 prices

    Jan 1, 1981

  • AUSIMM
    Preliminary Safety Analysis for the Connection of a Thermal Oxidiser to a Working Coal Mine

    By D Cork, R Peet

    "Methane is a signifi cant greenhouse gas. Methane is released from coal seams during the mining process, both in surface and underground operations. This uncontrolled release is termed æfugitive emis

    Jun 1, 2012

  • AUSIMM
    Geotechnical strata characterisation using geophysics and its application for coal mine design

    By T Medhurst

    Recent developments in geophysical borehole log analysis using the Geophysical Strata Rating (GSR) are now routinely used in a number Australian coal mining operations. This allows development of 3D g

    Nov 30, 2018

  • AUSIMM
    Development – Back to Basics

    By I T. Ross

    In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic

    Mar 24, 2014

  • AUSIMM
    Elastomeric Segment Gaskets – State-of-the-Art and Future Developments

    By H Höft

    Today tunnel segment liners are sealed with corner-vulcanised gaskets made of extruded elastomeric compression profiles. The profile geometries and the elastomeric materials have been further develope

    Mar 8, 2011

  • AUSIMM
    Application of Newly Developed Shield Tunnelling Machine for Intensive Curve

    By Yoshii Y

    Many kinds of shield machines are being driven in the soft ground of Tokyo metropolitan area. Tunnel alignments for underground power transmission lines are generally planned to pass under public r

    Jan 1, 1987

  • AUSIMM
    Technical Feasibility Studies and Uses of Treated Acid Mine Drainage at Kingsmill Tunnel, Peru

    By J Chßvez, J Rosa del Castillo, J Rui

    Environmental Impact Assessment (EIA) and Feasibility Studies (FS) were carried out to evaluate the potential use of treated acid mine drainage (AMD) occurring at the Kingsmill Tunnel in the Central A

    Jan 1, 2003

  • AUSIMM
    Assessing the Feasibility of Constructing a Subsea Water Supply from the New Territories to Ma Wan Island ù Directionally Drill or Tunnel?

    By D Moy, T Carter

    This paper outlines the feasibility assessment conducted to explore the possibility of constructing two submarine water supply pipelines beneath the Ma Wan Channel in Hong Kong using either horizontal

    Jan 1, 1999

  • AUSIMM
    Digital mapping for rock mass discontinuities – opportunities and challenges

    By J Leem, S Mehrishal, J Kim, A Fereshtenejad, J Song

    Rock mass discontinuity mapping plays a crucial role in developing a reliable Discrete Fracture Network (DFN), providing insights into the distribution of geometrical and mechanical properties of disc

    Sep 1, 2024

  • AUSIMM
    Notes on the Work of an Australian Tunnelling Company in France

    IT is intended in this paper to present in broad outline to the members of the Institute a short account of the conditions and operations that constitute what is, variously known as Subterranean Warfa

    Jan 1, 1920

  • AUSIMM
    Improved Ground Control Using Hydro Scaling and In-Cycle Shotcrete

    By B Upton, J Mitchell

    The use of hydro scaling and in-cycle shotcrete to replace conventional jumbo scaling, mesh and bolting as the primary method of ground control for run of mine development has been investigated throug

    Jan 1, 2005

  • AUSIMM
    Textural Characterisation of Manganese Minerals to Improve the Geometallurgical Characterisation of Ferromanganese and Iron Ores

    By S Hapugoda, J R. Manuel, M J. Peterson, A Poliakov, E Donskoi

    The occurrence and deportment of manganese in a number of ferromanganese and Mn-bearing iron ore samples from supergene-upgraded deposits, as well as from magnetite banded iron formation (BIF) and mag

    Aug 12, 2013

  • AUSIMM
    Dust Mitigation - Changing the Paradigm

    By J Visser

    Dust mitigation has long been seen as nothing more than managing a nuisance issue, but the reality is that poor dust management can lead to one or more of the following negative consequences: an incre

    Aug 12, 2013

  • AUSIMM
    Performance and Acceptance Testing of Main Mine Ventilation Fans

    By D J. Brake

    In most underground mines, the ventilation system is a significant portion of the total mine capital and operating cost and the largest consumer of underground electrical power. The effectiveness of t

    Jul 1, 2013

  • AUSIMM
    Larger Diameter Blastholes-A Proposed Means of Increasing Advance Rates

    Where tunnel rounds are based on the burn cut, faster advance could often be achieved by increasing blasthole diameter from (the conventional)

    Jan 1, 1981

  • AUSIMM
    Theory of Safe and Efficient Co-extraction of Coal and Gas and its Applications

    By J-T Zhu, Q-Y Tu, S-L Kong, L Wang, Y-P Cheng, H-Y Liu, Q-L Yang

    China is the largest coal-producing country in the world, while the geological conditions of deep coal mining are extremely complicated with high ground stress, high gas pressure and low permeability,

    Aug 31, 2015

  • AUSIMM
    BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

    By D Ford

    BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow

    Jan 1, 2007

  • AUSIMM
    Enhancing the fairness in LoRa-Based linear wireless mesh networks in underground mining

    By A Seneviratne, Y Li, N Udugampola, X Ai, B Li

    LoRa (Long Range) is a low-power, long-range wireless communication technology that has gained significant research interest for its potential use in multi-hop linear wireless sensor networks (LWSNs)

    Sep 1, 2024