The Red Hook Intercepting Sewer - A Compressed Air Tunnel Case History
By Eugene F. Casey, John G. Ruggiero
INTRODUCTION Construction of tunnels in urban areas, especially reclaimed areas, pose many problems. The Red Hook Intercepting Sewer Tunnel, Contract 1A is a portion of the Red Hook Water Pollution
Jan 1, 1981
-
An Engineering Approach To Monitoring The Performance Of Soft Ground Tunnels During Construction
By C. John Dunnicliff, Birger Schmidt
INTRODUCTION To be effective and useful, monitoring of tunnel construction must be carefully planned throughout all steps. A vital and frequently overlooked step is a clear definition of the specif
Jan 1, 1974
-
A Comparison of Grouting Techniques over 30 Years in 1969 and in 1999 for Southern Nevada Water Authority’s Lake Mead Intakes
By Jon Y. Kaneshiro, Stephen J. Navin, Jerry Ostberg
In 1968, the U.S. Bureau of Reclamation awarded S.S. Mullen Construction of Seattle, the Intake Tunnel (488 m by 4 m diameter tunnel) and Pumping Plant No. 1. In1998, the Southern Nevada Water Authori
Jan 1, 2001
-
Gas Mitigation In The Mill Creek Tunnel
By R. Switalski, M. Schafer, R. Pintabona, M. Kritzer, B. Lukajic, S. Janosko
Methane gas caused an eight-month shutdown of mining operations at the Mill Creek, Phase 3, Tunnel. The gas-related shutdown occurred as the tunnel was advanced to an approximate distance of 2,700 fee
Jan 1, 2007
-
The Fallacy of Tunnel Formwork Removal
By Wern-ping (Nick) Chen
In concrete lined tunnels, formwork removal timing may be controversial. Contractors seek to strip the form as soon as possible, and designers seek to keep the formwork in place as long as practical t
Jan 1, 2008
-
Emergency Repairs to Beach Interceptor Tunnel
By David Jurich, Joseph N. McDivitt
INTRODUCTION South Coast Water District (SCWD) operates the Beach Interceptor Sewer Tunnel(BIST) in South Laguna, Orange County, California between Monarch Beach and Aliso Beach (Figure 1). The 10,
Jan 1, 2007
-
Optimization In Large Tunnels
By H. S. Rathor
NTPC (National Thermal Power Corporation), a multi-unit organization, is generating 26% of India’s total power. This power is produced from its 14 coal based stations and 7 gas based stations. NTPC is
Jan 1, 2005
-
Beach Sewer Tunnel Rehabilitation ? Introduction
By Albert Ruiz
South Coast Water District (District) operates the Beach Interceptor Sewer Tunnel (BIST) in South Laguna, Orange County, California between Mon-arch Beach and Aliso Beach (Figure 1). The 10,424-foot l
Jan 1, 2008
-
Project Delivery Models and Risk Allocation for Whole Life Tunnel Management
By D. Caiden, C. S. Covil, P. J. Chamley
The paper describes the background to alternative delivery models, drawing on international experience, and introduces Project Alliancing/Contract Partnering, common risks and risk sharing on tunnel p
Jan 1, 2005
-
Evinos-Mornos Tunnel – Greece Construction of a 30 Km Long Hydraulic Tunnel in Less Than Three Years Under the Most Adverse Geological Conditions
By Remo Grandori, Manfred Jaeger, Fabrizio Antonini, Luis Vigl
The EVINOS-MORNOS tunnel project with its 30 km of length is one of the longest hydraulic tunnel in the world realised with TBM method. The adverse geological conditions, the high cover and the sho
Jan 1, 1995
-
Rehabilitation of the Cape Creek Highway Tunnel Under Traffic
By Roberto J. Guardia, Tim Shell, Robert A. Robinson, Steve Rodolf
Our aging infrastructure includes numerous tunnels that provide easy access through topographic and societal obstacles. These tunnels are renewable resources that require periodic maintenance and reha
Jan 1, 2005
-
Short Tunnels with Shallow Cover
By David Smith
Construction of a new transportation link frequently requires crossing under an existing highway or railroad. Although traffic diversions may permit a cut and cover structure to be built, ‘zero impact
Jan 1, 2005
-
Istanbul Strait Road Crossing Tunnel - Project Challenges and TBM Solutions
By Ergin Arioglu, Werner Burger
"SUMMARY The Istanbul Strait Road Crossing Project includes a 3.34 kilometer subsea tunnel excavated by TBM with an excavation diameter of 13.71 m. The tunnel will incorporate two road decks, each emp
Jan 1, 2016
-
Innovative Support of Cross-Passage Openings in Segmented Liner
By Karel Rössler, Petr Vítek
"The Ejpovice tunnels in Czech Republic were built by EPBM in soft Clyashale, and in weathered profile with low soil overburden. The segmented liner at the cross-passage openings required support, whi
Jan 1, 2016
-
Boston Outfall Tunnel
By Michael Gay
Right in the heart of Boston Harbor lies Deer Island, where a ten-year, 6 billion dollar sewage treatment plant is under construction. The 9.5 mile long, 25.5' diameter Effluent Outfall Tunnel is
Jan 1, 1993
-
Groundwater Inflow into Hard Rock Tunnels: A New Look at Inflow Equations
By John H. Raymer
Groundwater inflow into hard rock tunnels is strongly affected by recharge and drawdown of the water table. Previous analytical and empirical methods for estimating inflow have generally not accounted
Jan 1, 2005
-
Pneumatic-Hydraulic Material Transport System For The Rapid Excavation Of Machine-Bored Tunnels
By James W. Martin, Robert R. Faddick
INTRODUCTION Virtually every sector of society in our country feels the impact of tunnels, either through the transportation of water, commodities, or people. The economic implications are staggeri
Jan 1, 1974
-
High-Speed 3D Tunnel Inspection in Subway Tunnels— Case Study San Francisco BART - RETC2021
By Thomas Pea, Heiner Kontrus, Jérôme Steinkühler
In tunnel condition assessment, the trend is towards comprehensive 3D measurement combined with high quality image texture to document and quantify damages to the tunnel surface and to create a cohesi
Jun 13, 2021
-
Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) City of Fort Wayne Tunnel Alignment and Adit Redesign in Construction: A Schedule Driven Journey - NAT2022
By Todd S. Webster, Matthew J. Pierce, Brad D. Krumel
With the Working Shafts and Starter Tunnel under way, it became apparent this 4.7-mile, 19-foot diameter wet weather tunnel was going to live up to its name. The shaft’s pre-excavation grouting was co
Dec 1, 2022
-
Milchbuck Tunnel Application Of The Freezing Method To Drive A Three-Lane Highway Tunnel Close To The Surface
By Leonhard Schmid
INTRODUCTION In the region of Zurich several of the Swiss Interstate Highways meet and have to be linked to form a continuous network. The subalpine glacial topography with hills, ridges and lakes
Jan 1, 1981