Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    JWPCP Effluent Outfall Tunnel in Los Angeles, California— Anticipated Challenges and Slurry TBM Performance in the Soft Ground Section of the Alignment - NAT2024

    By Martino Scialpi, Miriam Piemontese, Claudio Cimiotti, Matt Kendall, Nicholas Karlin, Roberto Schuerch

    The Los Angeles, California JWPCP effluent outfall tunnel will transport secondary-treated effluent from the Joint Water Pollution Control Plant in Carson to the White Point Manifold. Upon completion

    Jun 23, 2024

  • SME
    Geotechnical Investigation and Design for the Sister Grove Outfall Tunnels - RETC2021

    By Michael Schultz, Gregory Sanders

    In 2017, the North Texas Municipal Water District (NTMWD) initiated the design of the Sister Grove Regional Water Resource Recovery Facility (SGRWRRF) to provide additional treatment capacity for futu

    Jun 13, 2021

  • SME
    South Cobb Tunnel - Cobb County?s Solution To Meeting Future Waste Water Capacity

    By Wojciech Klecan

    Cobb County, located on the northwest side of Atlanta, GA, is continually growing and, like many other metropolitan areas, it needs to increase the capacity of its waste water system to meet future de

    Jan 1, 2009

  • SME
    Building the East-West Cross Drift Tunnel at Yucca Mountain

    By Brian Fulcher

    In April 1997, Kiewit/Parsons Brinckerhoff (K/PB) completed the 7,600-m (25,000-ft) primary access tunnel for the Yucca Mountain, NV proposed high-level nuclear waste site. K/PB then began boring an

    Jan 1, 2000

  • SME
    Environmental Impact of Groundwater Discharge During Tunnel Construction

    By James A. Pappas, Francis L. Fong, Tracy K. Lundin

    The impact of environmental regulations on the quality of tunnel groundwater discharges is examined in this paper. Tunnel contractors usually depend on specialty contractors or outside consultants to

    Jan 1, 1995

  • SME
    Conditions Encountered in the Construction of Stanley Canyon Tunnel Colorado Springs, Colorado

    By Levent Ozdemir, Roy H. Spitzer, Don W. Deere, John B. Blyler

    This paper documents the construction of the Stanley Canyon Tunnel, the geologic conditions encountered, boreability of the rock, and the impacts of the conditions encountered on the construction. The

    Jan 1, 1995

  • SME
    Conceptual Design Of The First Segment Of Tunnels For The Superconducting Super Collider Project The Prototype Installation Facility

    By Jon Y. Kaneshiro, Donald W. Scapuzzi

    The primary purpose of the Prototype Installation Facility (PIF) for the Superconducting Super Collider (SSC) in this conceptual design was to test the magnets and other physics equipment. PIF was loc

    Jan 1, 1991

  • SME
    Passaic River Basin Tunnel, New Jersey

    By Douglas J. Pendrell, Marvin D. Simmons, E. Raymond Boc

    The U. S. Army Corps of Engineers is in the early stages of design for an estimated 14 m (46 ft) diameter tunnel in northeast New Jersey. This tunnel will carry flood waters from the upper end of the

    Jan 1, 1991

  • SME
    Rapid Construction Of The Syar Tunnel Central Utah Project

    By P. R. Busmann, D. J. Rogers

    The Bureau of Reclamation's Syar Tunnel project included excavation of a 9.2 kilometer (5.7 mile) long, 3.6 meter (11.8 ft) diameter tunnel through gently dipping sedimentary rocks consisting of

    Jan 1, 1991

  • SME
    The Design Challenges of a Soft-Ground Twin-Bore Tunnel on a Connection Motorway in NW Italy

    By Shulin Xu, Moreno Pescara, Nicola Avagnina, Piergiorgio Grasso

    The Roreto Tunnel is a shallow, twin-bore, road tunnel on the connection between the A6 and the A21 motorway in NW Italy. The challenges faced the design and construction of this tunnel derive from 1)

    Jan 1, 2003

  • SME
    Geotechnical Aspects Of The Mt. Baker Ridge Tunnel Design

    By Robert A. Robinson, Steven R. Thompson, Harvey W. Parker

    The Mt. Baker Ridge Tunnel, under construction in Seattle, will be the world's largest-diameter soil tunnel with an inside diameter of 19.2 m (63 ft) and an effective outside diameter of about 24

    Jan 1, 1983

  • SME
    Managing the Groundwater Impacts of Tunnel Construction

    By Thomas H. Hibner, Daniel Tempelis, John E. Shamma

    Environmental protection of nearby resources is an issue that can not be ignored in tunnel construction. The Inland Feeder Arrowhead Tunnels Project is no exception. With keen interest from various st

    Jan 1, 2003

  • SME
    Design and Construction of the Weehawken Tunnel and Bergenline Avenue Station

    By Leon J. Jacobs, Kyle R. Ott

    This paper discusses design and construction aspects of the tunnel, shaft and station for the Weehawken Tunnel and Bergen line Avenue Station. The project consists of a 1,269 m (4,156 ft) long existin

    Jan 1, 2003

  • SME
    Mining Using NATM Techniques in the Toukoshan Formation on C230 Taiwan High Speed Rail

    By Gary B. Hemphill

    The 345 km long Taiwan High Speed Rail Project will connect the island’s two most populated cities, Taipei and Kaohsiung. Kaohsiung is the world’s third busiest port. The 23 km of alignment on Cont

    Jan 1, 2003

  • SME
    Geotechnical Conditions and TBM Selection for the Bay Tunnel

    By Luke Erickson

    San Francisco Public Utilities Commission is planning to replace 5 miles of pipeline under San Francisco Bay. The tunnel will be constructed using an Earth Pressure Balance (EPB) TBM and will be the f

    Jan 1, 2008

  • SME
    Monitoring Successful NATM in Singapore

    By K. Zeidler, T. Schwind

    The Fort Canning Tunnel, Singapore, is an approximately 50 feet (15m) wide vehicular tunnel under shallow ground cover that has been constructed according to the principles of the NATM. Its shallow lo

    Jan 1, 2007

  • SME
    Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, California

    By Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan

    Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E

    Jan 1, 2007

  • SME
    Carbon Footprint Reduction in Montreal Blue Line Extension - RETC2023

    By V. Nasri, P. Jarast, M. Bakhshi

    The Montreal metro Blue Line Extension toward the northeast consists of the construction of five new underground stations. The project includes 6 kilometers of the tunnel which will be constructed usi

    Jun 13, 2023

  • SME
    The Northeast Boundary Tunnel—A TBM Performance Review - NAT2022

    By Elisa Comis, Jeffrey Peterson, Yama Ebrahimi

    Construction of the Northeast Boundary Tunnel (NEBT), the last leg of the Anacostia River Tunnel System on DC Water’s Clean Rivers Project, started in September 2018 and was completed in April 2021. T

    Dec 1, 2022

  • SME
    Design and Construction of the DLR Extension to Woolwich Arsenal, London, UK

    By Andy Alder

    The Docklands Light Railway (DLR) Extension to Woolwich Arsenal provides a much-needed public transport link to this area of London. The project includes construction of 5.3mID running tunnels under t

    Jan 1, 2008