Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Waneta expansion project: Penstock tunnels

    By Ben Roderds

    The Waneta Expansion Project (WAX) is located near the existing Waneta Dam site at the confluence of the Pend d?Oreille and Columbia rivers, approximately 10 km (6.2 miles) south of Trail, BC, Canada.

    Mar 1, 2014

  • SME
    An Environmentalist's Views On Underground Construction

    By Joseph G. Carleton

    INTRODUCTION The increasing concern for the environment may well present far more opportunities than problems for those involved in all phases of tunneling. All too frequently in the past, environm

    Jan 1, 1974

  • SME
    Metrorail's Dual Chamber Rock Tunnel Station--Two Can Be Simpler Than One

    By Charles W. Daugherty

    INTRODUCTION The Washington Metropolitan Area Transit Authority's (WMATA's) rapid transit system, Metro, ultimately will comprise 162.5 km (101 miles) of line divided among 10 routes. As

    Jan 1, 1981

  • SME
    Lifetime of Polyethylene Geomembranes for Water Proofing of Tunnels

    By Gerald Pinter, David Nitsche, Márton Bredács, Markus Haager, Andreas Frank

    "The reliable prediction of service lifetime of tunnel constructions is of essential technical and economic interest. Polymers used for tunnel liners have to fulfill the requirement of 100 years lifet

    Jan 1, 2016

  • SME
    Tunnel Support Loading Caused By Rock Failures

    By J. J. K. Daemen, C. Fairhurst

    Two aspects of tunnel support design are considered, and for both particular attention is paid to the influence of rock failure around the tunnel on the loads developed on the supports. 1) In gener

    Jan 1, 1997

  • SME
    Geologic Model For A Tunnel Cost Model

    By Steven G. Vick, Herbert H. Einstein

    1. INTRODUCTION The Tunnel Cost Model (TCM) is a computer based model whose objective is to quantify the risks of hard rock tunneling in terms of cost and time to completion. The main feature of th

    Jan 1, 1974

  • SME
    Analysis and Observation of Keyblock Occurrence in Tunnels in Granite

    By Jesse L. . Jr. You

    Tunnels in the granitic Climax stock at the Nevada Test Site were inspected for keyblock occurrence. Thirteen relatively large pyramidal keyblocks were located in about 230 m (750 it) of tunnel. Orien

    Jan 1, 1986

  • SME
    Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023

    By Abegail Endraca, Allan Sebastian, Andrew Raine, Allan Patdu

    The project involves the construction of a new aqueduct tunnel by an Earth Pressure Balance TBM tunnel for the Novaliches-Balara Aqueduct No 4 (NBAQ4) project in Metro Manila. It comprises a 7.3 km lo

    Jun 13, 2023

  • SME
    Shielded TBM's - Matching The Machine To The Job

    By Peter B. Dowden, David T. Cass

    A shield on a tunneling machine has two basic purposes. Firstly to provide temporary support in unstable ground, maintaining the integrity of the bore and protecting the operators, and secondly, in co

    Jan 1, 1991

  • SME
    Ground Freezing As Used In The Excavation Of A Mixed Face

    By John E. Feddcck

    New York City's $360 million North River Water Pollution Control Project is part of New York State's plan to clean up the Hudson River. The project is to provide a sewage treatment facility

    Jan 1, 1970

  • SME
    Design And Construction Challenges At The Gualcamayo Mine

    By N. Ward

    The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Fig. 1). A property of Yamana Gold Inc., it declared commercial production in July 2009 and has a total mineral rese

    Jan 1, 2011

  • SME
    Full NAT 2024 Proceedings - NAT2024

    By SME SME

    NORTH AMERICAN TUNNELING 2024 PROCEEDINGS

    Jun 23, 2024

  • SME
    Is Design Build for Chicago Area Tunnel in the Cards?–Cady Marsh Drainage Ditch and Tunnel/Pipeline Project, Griffith, Indiana

    By Faruk Oksuz, Clay Haynes, David Egger

    The United States Army Corps of Engineers (USACE) has committed to solve a major drainage problem in the suburban Chicago community of Griffith, Indiana. The Cady Marsh Ditch is currently undersized a

    Jan 1, 2003

  • SME
    Excavation Equipment For Small Soft Ground Tunnels

    By Richard Lovat

    INTRODUCTION Soft ground tunnels may be above the ground water table or they may be subaqueous. The ground may be clays, silts, sands, gravels, glacial deposits, boulder tills, and any of these in

    Jan 1, 1981

  • SME
    Tunnels And Shafts, Roosevelt Road To Ogden Avenue

    By Thomas F. Martin

    Contract 75-124-211 extends along the Chicago River from Roosevelt Road on the south to Ogden Avenue on the north. In addition a branch tunnel runs east from approximately mid-project ending near Lake

    Jan 1, 1979

  • SME
    Estimating Rock Tunnel Water Inflow

    By Ronald E. Heuer

    It is not possible to accurately predict water flow into rock tunnels during construction, because all of the relevant factors cannot be accurately determined ahead of time. But an estimate is needed,

    Jan 1, 1995

  • SME
    Structural Responses To Hand-Tunnelling Procedures

    By Robert N. Evans, Delon Hampton

    During construction of the Washington Metropolitan Area Transit System, the hand-mining of a mixed-face condition was anticipated on a portion of tunnel located in the downtown area of Washington, D.C

    Jan 1, 1974

  • SME
    The English Channel Tunnel

    By C. J. Kirkland

    HISTORICAL BACKGROUND For two thousand years and more, we insular Britons have been grateful for the existence of the narrow strip of water which seperates us from mainland Europe. It has given us

    Jan 1, 1987

  • SME
    Predicting Materials Handling Properties Of Tunnel Muck

    By H. F. Haller, H. C. Pattison

    The research program described in this paper is sponsored by the Advanced Research Projects Agency of the Department of Defense and monitored by the Bureau of Mines, United States Department of the In

    Jan 1, 1997

  • SME
    Los Angeles Metro Rail Project Design Issues Related To Gassy Ground

    By James E. Monsees, Richard J. Proctor

    INTRODUCTION Los Angeles is one of the world's largest cities in area with a span of 70 km between its north and south limits. The population in the Los Angeles Basin exceeds 11 million people

    Jan 1, 1985