Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Shrinkage Stoping at the Idarado Mine

    By William Hustrulid

    INTRODUCTION The Idarado mine lies high in the San Juan Moun¬tains on the divide between the Uncompahgre and San Miguel Rivers and consists of a consolidation of a number of old and prominent mining

    Jan 1, 1982

  • SME
    Analysis of SLAM‑Based Lidar Data Quality Metrics for Geotechnical Underground Monitoring (Mining, Metallurgy & Exploration)

    By LUKAS FAHLE, Andrew J. Petruska, JURGEN F. BRUNE, Gabriel Walton, Elizabeth A. Holley

    Adverse ground behavior events, such as convergence and ground falls, pose critical risks to underground mine safety and productivity. Today, monitoring of such failures is primarily conducted using l

    Aug 16, 2022

  • SME
    Rock Index Properties To Predict Tunnel Boring Machine Penetration Rates

    By P. J. Tarkoy

    To successfully bid a tunneling contract by machine, a contractor must have a reliable estimate of expected penetration rates and cutter costs. Preferably, these predictions should be independent of t

    Jan 1, 1974

  • SME
    The Entrainment, Pressure and Flow Process of a Jet Fan Modeled in a Square Section Wind Tunnel

    By Allan E. Hall, Kuda R. Mutama

    Jet fan (ductless fan) ventilation in underground mines and tunnels is a subject requiring further attention. At present there are no accepted procedures or guidelines for this type of ventilation. Th

    Jan 1, 1995

  • SME
    Implications of Using NATM in Underground Construction

    By Mohammad Irshad, Klaus Mussger, Harald Wagner

    Despite the fact that the New Austrian Tunneling Method; NATM, has been used in the United States for the past 23 years or so, still considerable misconceptions exist in the industry about the nature

    Jan 1, 2005

  • SME
    Joint Water Pollution Control Plant Tunnel and Ocean Outfall Project

    By Steve Dubnewych, Jon Kaneshiro, Calvin Jin

    The Joint Water Pollution Control Plant (JWPCP), operated by the Sanitation Districts of Los Angeles County (the Districts), treats wastewater generated by over3 million people and processes wastewate

    Jan 1, 2007

  • SME
    The MX Trench Construction Project

    By G. M. Riddle

    As an important part of the concept validation phase of the MX Advanced ICBM development program, Air Force System Command's Intercontinental Ballistic Missiles (ICBM) Program Office developed an

    Jan 1, 1979

  • SME
    Combining Proper Confinement Pressure And Adequate Slurry For Passing Beneath Existing Structures Securely With Slurry Shield - Case Study

    By M. ]. [Mohkam

    The paper describes the features of the problems encountered and the countermeasures taken for two different tunneling projects. Where, slurry shields were used to excavate, in soft heterogeneaous wat

    Jan 1, 1991

  • SME
    Production Operations

    By Lee W. Saperstien

    At the heart of the mining process are a number of basic and fundamental tasks whose regular and repeated performance constitute the mining cycle. As will be discussed presently, these tasks are the b

    Jan 1, 2008

  • SME
    Program-Wide Geo-Instrumentation Monitoring for the MTA East Side Access Project

    By Dilip I. Patel, Jesus Schabib, W. Allen Mawr, Daniel A. Louis

    East Side Access (ESA) will extend Long Island Rail Road into midtown Manhattan via 11 km of tunnels, a new terminal station and associated rail support facilities. The hard-rock tunneling in Manhatta

    Jan 1, 2007

  • SME
    Mitigating Tunnel Launch and Reception Challenges

    By Steven W. Hunt

    Appropriate seals, portal ground improvement, and compatible shaft construction techniques are vital elements for launching and receiving tunnels effectively in urban areas where adjacent property req

    Jan 1, 2008

  • SME
    Geotechnical data collection and application to the Leeville underground mine - SME Transactions 2010

    By Changshou Sun

    The Leeville underground mine has been in operation since 2006 and currently produces 3,175 t (3,500 st) of ore per day with an average gold grade of 12.6 g/t (0.4 opst). The mine has a large horizont

    Jan 1, 2010

  • SME
    Updating the GBR Gold Book - NAT2022

    By David Hatem, Paul Madsen, Daniel Adams, James Morrison, Randall Essex

    Managing commercial risks associated with subsurface construction may be the greatest challenge the underground industry faces. The Geotechnical Baseline Report (GBR) was developed in the U.S. to help

    Dec 1, 2022

  • SME
    Dewatering for the Lenox Avenue Subway Reconstruction Project

    By Paul C. Schmall, Thomas Tuozzolo, Arthur B. Corwin

    The Lenox Avenue Reconstruction Project involved the excavation and replacement of 750 m (2,500 ft) of deteriorated subway invert concrete, 5 to 7 m (15 to20 ft) below water table in very permeable gr

    Jan 1, 2001

  • SME
    Latest Information on Underground Construction Presented at 2006 NAT

    By William R. Yernberg

    The 2006 North American Tunneling (NAT) Conference was held June 10-15, 2006, in Chicago, IL. The biennial conference was the first NAT conference by the newly formed Underground Construction Associat

    Jan 1, 2006

  • SME
    Controlled Blasting At The Hanging Lake Tunnels (a8565281-d84e-475e-9694-9445db5583d2)

    By Gordon F. Revey, Dan Harrison

    Hanging Lake Joint Venture recently excavated two conventional 12.8 m (42 foot) diameter highway tunnels in the difficult ground conditions of Glenwood Canyon, Colorado. This paper outlines the type a

    Jan 1, 1991

  • SME
    The Los Rosales Water Tunnel In Bogota

    By Remo Grandori, Fabrizio Antonini, Giorgio Dolcini

    The paper describes the anticipated and the encountered geology, the TBM selection concepts and the machine special features, the tunnel sections, the achieved advance rates and the geological problem

    Jan 1, 1991

  • SME
    Relation Of Owner, Engineer And Contractor In Tunnel Work

    By Jacob Feld

    Introduction The best way to eliminate the possibility of rapid excavation in tunnel work is to start an argument between Owner Engineer and Contractor. And arguments are readily started when work

    Jan 1, 1974

  • SME
    Design And Construction Of Temporary And Permanent Lining Systems For Shield Tunnels In Germany

    By Heinz Distelmeier

    Short Historical Review Tunnelling in Germany is as old as it is in other industrial countries. Until the middle of this century German contractors had no chance to work continuously in this busine

    Jan 1, 1987

  • SME
    Advantages And Limitations Of Adaptable Tunnel Design And Construction Methods

    By Herbert H. Einstein, Edward C. Tse, David B. Ashley

    INTRODUCTION Decision-making in the design and construction of underground facilities must be made under conditions of varying geologic uncertainty, uncertainty which can have a major cost impact i

    Jan 1, 1979