Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
- 
                     Case studies illustrating the role of F-series mine reconciliations in production forecast improvement initiatives Case studies illustrating the role of F-series mine reconciliations in production forecast improvement initiativesBy S J. Loach F-Series reconciliations are formal comparisons of estimates and measurements of ore quantity and quality made at pre-determined points along the mining value chain. F1 is the ratio of ‘Depleted Grade Sep 18, 2023 
- 
                     Case Studies of International Copper Development Projects Case Studies of International Copper Development ProjectsBy Pollack B Four different major international copper projects are discussed. Three have recently come on line, and one is now being constructed. Each of the projects has encountered unique problems during th Jan 1, 1983 
- 
                     Case Studies on the Performance and Characterisation of the Froth Phase in Industrial Flotation Circuits Case Studies on the Performance and Characterisation of the Froth Phase in Industrial Flotation CircuitsBy S R. Grano, M Vera This paper deals with two separate case studies investigating the froth phase performance and characterisation of two industrial rougher/ scavenger flotation circuits. Froth phase performance was quan Jan 1, 2005 
- 
                     Case Studies Using Slurries and Stable Slurries with Unconventional Binders as Backfill Materials in Deep Hard Rock Tabular Mines Case Studies Using Slurries and Stable Slurries with Unconventional Binders as Backfill Materials in Deep Hard Rock Tabular MinesBy R M. Smart, A T. Harrison Backfill systems using unconventional cementitious binders have been successfully used in relatively deep and hard rock tabular mines for longwall, scattered stoping and shaft pillar removals. Two unc Jan 1, 1998 
- 
                     Case Studies Using Slurries and Stable Slurries with Unconventional Binders as Backfill Materials in Deep Hard Rock Tabular Mines Case Studies Using Slurries and Stable Slurries with Unconventional Binders as Backfill Materials in Deep Hard Rock Tabular MinesBy Harrison AT, Smart RM Backfill systems using unconventional cementitious hinders have been successfully used in relatively deep and hard rock tabular mines for longwall, scattered stoping and shaft pillar removals. Two Jan 1, 1998 
- 
                     Case Study - NWT Diamonds Project Case Study - NWT Diamonds ProjectBy Penny T. G BHP Diamonds and their joint-venture participants DiaMet Minerals, Chuck Fipke and Stewart Blusson are currently developing Canada's first commercial diamond mine in the arctic barren lands of Jan 1, 1997 
- 
                     Case Study - The Mogiana Quarry Reclamation Case Study - The Mogiana Quarry ReclamationThis article presents a proposal for the rehabilitation of the mined area of the Mogiana quarry. The Mogiana quarry produces material used in civil construction and is situated in the Brazilian State Dec 6, 2010 
- 
                     Case Study - Total Life Cycle Planning for a Greenfield Site Case Study - Total Life Cycle Planning for a Greenfield SiteCentral to any business is its Asset Management Plan which encapsulates the business context and key organisational objectives such as profitability, safety and environmental standards. Life Cycle Pl Jan 1, 2007 
- 
                     Case Study . . . Industrial Relations in Resource Development Case Study . . . Industrial Relations in Resource DevelopmentIndustrial relations on Australian and New Zealand resource projects can be volatile. Therefore investors have become increasingly aware over the years that sound industrial relations during const Jan 1, 1983 
- 
                     Case Study Assessing Alternative Data Collection Techniques and Analysis Methods to Assist with Geotechnical Slope Design Case Study Assessing Alternative Data Collection Techniques and Analysis Methods to Assist with Geotechnical Slope DesignBy C Bellia, A Maldonado, S Strong, H Baxter This paper discusses the technical and cost benefits of alternative data collection techniques used to collect lithological information, obtain laboratory testing samples and perform in situ testing. Jul 13, 2015 
- 
                     Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle Mine Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle MineBy G B. Smith Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot Mar 21, 2011 
- 
                     Case study of a practicable, risk-based solution in response to new regulatory approaches to Mining Health and Safety using Queensland Recognised Standard 22 (Management Structure for the development and implementation of the SHMS) Case study of a practicable, risk-based solution in response to new regulatory approaches to Mining Health and Safety using Queensland Recognised Standard 22 (Management Structure for the development and implementation of the SHMS)By S Amor, A Beasley This paper provides an example of how industry can respond to the implementation of new regulatory approaches to mining risk, health and safety by adopting a robust, practical, software-based approach Apr 16, 2024 
- 
                     Case Study of Installation of Compact Bucket Wheel Excavators on Ironsands at N.Z. Steel Case Study of Installation of Compact Bucket Wheel Excavators on Ironsands at N.Z. SteelBy Hogan C. J The compact BWE system set up in 1984 to mine ironsand dunes and the underlying ironsand-clay has been an effective high volume produc- tion unit for New Zealand Steel Mining Ltd at the Waikato North Jan 1, 1989 
- 
                     Case Study of Iron Ore Value Chain Optimisation Case Study of Iron Ore Value Chain OptimisationBy J Foo, T Kleinschmidt, B Reynolds, K Kennewell The consideration of complex supply chains often highlights multiple system bottlenecks that are localised and dynamic – they shift depending on what variability last influenced the system. Using the Jul 13, 2015 
- 
                     Case study of joint structure and the design and performance of open pit walls at the Kanmantoo copper mine Case study of joint structure and the design and performance of open pit walls at the Kanmantoo copper mineBy B J. Hutchison, S Gannon, J Chambers, D Oko-oboh The Kanmantoo copper mine is located in the Adelaide Hills area of South Australia and is owned and operated by Hillgrove Resources (HGO). The mine is a drill and blast, truck and shovel operation min Sep 20, 2017 
- 
                     Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway Project Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway ProjectBy W M. Tekano, T S. Coulter, N M. Hutt The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell Jan 1, 2003 
- 
                     Case Study on the Remediation of a Remote Acid Mine Drainage Site in South Africa With Emphasis on Low Cost Measures and Cost Benefit Assessments Case Study on the Remediation of a Remote Acid Mine Drainage Site in South Africa With Emphasis on Low Cost Measures and Cost Benefit AssessmentsBy N Swiegelaar Loubert Witbank is a defunct coal mine situated near Ermelo in South Africa. Mining ceased in 1992, and within a short period acidic decant occurred, with a significant impact on the regional catchmen Jan 1, 2003 
- 
                     Case Study ù Final Closure Water Balance of a Tailings Impoundment Using Direct Vegetation Case Study ù Final Closure Water Balance of a Tailings Impoundment Using Direct VegetationBy N Currey, G W. Wilson, P Ritchie Kidston Gold Mine in Queensland, Australia has a 310 ha tailings impoundment that has undergone final closure rehabilitation. Kidston Gold Mine evaluated their closure options for this low acid genera Jan 1, 2003 
- 
                     Case study – an analysis of reliability and efficiency: ultrasonic versus annubar technologies Case study – an analysis of reliability and efficiency: ultrasonic versus annubar technologiesBy M J. Shearer An investigation into the reliability of the data being collected at the Mount Isa Mines site operated by Glencore in Queensland allowed on-site ventilation personnel to scrutinise pressure and volume Aug 28, 2017 
- 
                     Case Study – Application of RISKGATE to Managing Strata Failure in an Australian Coalmine Case Study – Application of RISKGATE to Managing Strata Failure in an Australian CoalmineBy J Harris, J Turner, P Kirsch Coal mining is recognised globally as a hazardous activity, and as a result operates under high levels of regulatory and public scrutiny while managing a workforce operating in a high-risk environment Nov 5, 2014 
