Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Drill Hole Logs Provide the Third Dimension for Minespoil Reclamation

    The establishment of vegetation onto open cut mine spoil is dependant on the nature of the soil and rock strata of the overburden. Experience has shown that in the Bowen Basin of Central Queenslan

    Jan 1, 1987

  • AUSIMM
    Drill hole spacing analysis for classification and cost optimisation – a critical review of techniques

    By J Levett, O Rondon, I Glacken

    Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl

    May 24, 2023

  • AUSIMM
    Drill Monitoring Investigation in a Western Canadian Surface Coal Mine

    By Peck J. P, Kennedy D

    Drill performance monitoring studies were recently completed at the Fording River mine, British Columbia. Microprocessor-based instrumen- tation and data analysis techniques were developed with the o

    Jan 1, 1989

  • AUSIMM
    Drill Steel Sharpening Practice at Lake View and Star Gold Mine

    The drill steel' sharpening shop, which stands adjacent to the Chaffers shaft, is built to the dimensions of 110 ft. 9 in. by 58 ft. wide, and is air conditioned in order to maintain reasonable w

    Jan 1, 1941

  • AUSIMM
    Drilling - Continuity - Mine Planning

    The AusIMM/AMIC code for reporting Reserves seeks to improve the calibre of professional reporting on this subject. But have they gone far enough? Should the code appreciate that the degree of reli

    Jan 1, 1989

  • AUSIMM
    Drilling and Blasting at Mount Morgan

    By McIntosh A. H, Torlach J. A

    Since the last paper on mining methods was presented to the Annual Conference of the Australasian Institute of Mining and Metallurgy in 1:960, numerous advances have been made in drilling and blasting

    Jan 1, 1965

  • AUSIMM
    Drilling and Blasting Cost Estimation

    Drilling and blasting are an essential part of most mining operations, and are commonly major operating cost centres. The effectiveness of blasting can have a significant influence on all subsequent

    Jan 1, 1990

  • AUSIMM
    Drilling and Blasting for Underground Space

    By A Robertson

    Australia has been slow in adopting the use of underground space as a part of our urban planning process. Australia has one of the highest levels of tunnel advance per capita per annum in the world, y

    Jan 1, 2007

  • AUSIMM
    Drilling and Blasting Impact on Dragline Performance

    In order to fully understand why Amax Coal puts such extreme emphasis on the drilling and blasting programs at each of our mines, we must review the past. This paper will discuss the drilling and bl

    Jan 1, 1995

  • AUSIMM
    Drilling and Blasting Operations at the Kennedy Siltstone Open Cut of Mount Isa Mines Limited

    The Kennedy Siltstone Open Cut provides graded rock for stope filling. Rotary drilling of 310 mm blastholes with a Gardner Denver GD120 is used, and the successful application of an equilateral tri

    Jan 1, 1978

  • AUSIMM
    Drilling and Blasting Techniques in Shallow Manganese Ore Deposits at Groote Eylandt û Present Performance and Future Outlook

    By Barber J

    The manganese ore of Groote Eylandt is a shallow sedimentary deposit of Cretaceous age. There are a number of deposits which vary greatly in ore texture, density, percentage of matrix and thickness

    Jan 1, 1974

  • AUSIMM
    Drilling and Blasting Through Old Underground Workings at Westside Mine

    By T Galvin

    Drilling and blasting at Westside Mine near Wallsend, NSW, has presented a challenge for Orica Explosives, Australia. The colliery produces 600 000 tonnes of steaming coal per year from two seams usin

    Jan 1, 1999

  • AUSIMM
    Drilling and Blasting to Achieve Lower Costs for Deeper Stripping

    By Lemberg D. W, Friday R. G

    Potential means of lowering overall costs to permit deeper stripping include : 1. the use of larger diameter blastholes in highly-fissured strata (to reduce drilling costs); 2. dewatering from semi-

    Jan 1, 1981

  • AUSIMM
    Drilling Equipment And Techniques In Australian Coal Exploration

    By Svenson D

    Most exploratory drilling in the N.S.W. coal fields has been conducted using convent- ional diamond drill rigs of modern design, us- ually truck or trailer mounted. Conventional diamond drill rigs ha

    Jan 1, 1977

  • AUSIMM
    Drilling Equipment for Difficult Coring Conditions A New Type Core Lifter and Triple Tube Core Barrel

    Considerable improvements in diamond drilling equipment have been made since the early 1950s. A recent drilling programme, however, at Williamtown, near Newcastle, carried out by the Joint Coal Board

    Jan 1, 1967

  • AUSIMM
    Drilling of Shallow Marine Sulfide-Sulfate Mineralisation in the South-Eastern Tyrrhenian Sea, Italy

    By R Sharpe, M D. Hannington, K Perrin, K Simpson, S Petersen, H Gibson, N Augustin, K Lackschewitz, T Monecke

    Semi-massive to massive sulfides were drilled in a shallow-water (630 m) hydrothermal system in an island arc volcanic setting at the Palinuro volcanic complex in the Tyrrhenian Sea,Italy. Overall 12.

    Jan 1, 2008

  • AUSIMM
    Drilling Practice and Investigation into Drilling Techniques at the Mine Site of Hamersley Iron Pty. Limited

    By Bradley AJ

    Hamersley Iron Pty. Limited mines and pro cesses iron ore from two orebodies at Tom Price and Paraburdoo, situated in the North West of Western Australia. Conventional open pit mining methods are u

    Jan 1, 1978

  • AUSIMM
    Drilling Six Ventilation Shafts for the Porgera Goldmine

    Difficult ground conditions in the area planned for placement of vent rises to the surface at the Porgera Goldmine led engineers directing the project to chose blind shaft boring methods of shaft cons

    Jan 1, 1993

  • AUSIMM
    Drilling Techniques for Investigation and Operation of Large Open Pit Coal Mines in the Latrobe Valley

    By Mountiney B

    The development and operation of three large open cut brown coal mines in the Latrobe Valley, Victoria, Australia, requires a wide range of drilling techniques for coal resource evaluation and strat

    Jan 1, 1989

  • AUSIMM
    Drilling Techniques for Resource Estimation of Mineral Sand Deposits

    By M Z. Abzalov

    Drilling mineral sand deposits has specific challenges, which are different from drilling hard rock deposits: Drilled sequences are represented by non-consolidated free-flowing sands to semi-conso

    Oct 5, 2011