Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    The Use of Computers in the Analysis and Steady State Optimization of Metallurgical Concentrations

    By Weller KR

    Computer programs are described which help the metallurgist to process sample data from a plant survey; to carry out simple mass balance calculations; to present the results of circuit and equipmen

    Jan 1, 1983

  • AUSIMM
    New Data for Trace Element Concentrations in Australian Bituminous Coals

    By Mills J. C

    Concentration ranges are presented for 15 trace elements not previously reported in Australian bituminous coals. The results were obtained by instrumental neutron activation analysis, which has suffic

    Jan 1, 1983

  • AUSIMM
    Computerised Deposit Modelling, Volumetrics, and Production Scheduling

    By Davey CJ

    An integrated computer software system has been developed by Fluor Australia for modelling, mine planning and production scheduling of single or multi-strata deposits. Modelling of both quantitative

    Jan 1, 1983

  • AUSIMM
    The Rise And Fall Of Mt Keast-Locating Feed For Current Retreatment Operations From A Study Of Processing History At The Zinc Corporation, Limited

    In 1976, The Zinc Corporation Limited Broken Hill set up a plant to re-process a hill of tailing (Mt. Keast) from the original treatment operations. With the likely disappearance of this source of

    Jan 1, 1983

  • AUSIMM
    The Bucket Wheel Excavator at Goonyella-A Case Study

    Utah's Blackwater mine began operations in 1967. The four CQCA mines controlled by Utah followed over the period 1971 to 1979. Project feasibility studies for all these were based on open cut

    Jan 1, 1983

  • AUSIMM
    Mineralogical, Petrographical and Geochemical Investigations of Outbursting in Australian Coal Mines

    By Hart G. H

    In tectonically disturbed zones within coal seams, decreases in the amount of kaolinite in the cellular structure of inertiniterich coal are accompanied by increasing kaolinite contents in fractures w

    Jan 1, 1983

  • AUSIMM
    Use and Abuse of Geological Data for Mine Project Development

    This paper sets out to discuss some of the more common forms of geological data abuse in project development. The paper illustrates various types of abuse and the reasons behind that misuse of dat

    Jan 1, 1983

  • AUSIMM
    A 2000 Channel Mine-Wide Data Acquisition System

    By Smith I. K

    A Data Acquisition System with a capacity to monitor 2000 analog instruments has been installed at the mines operated by the Zinc Lorporation, Limited and New broken hill Consolidated Limited (ZC/

    Jan 1, 1983

  • AUSIMM
    A Process for the Recovery of Cobalt from Speiss

    By Fennell B

    A process for the recovery of cobalt from a speiss produced at Sulphide Corporation is presented. The speiss is leached in oxygenated sulphuric acid to dissolve the metallic iron at a pH of around 4.

    Jan 1, 1983

  • AUSIMM
    The Development And Application Of techniques For The Assessment And Control Of Longhole Open Stope Stability At ZC/NBHC

    The causes and impact of stability problems associated with longhole open stoping (LHOS) at The Zinc Corporation, Limited (ZC) and New Broken Hill Consolidated Limited (NBHC) are discussed and LHOS

    Jan 1, 1983

  • AUSIMM
    Network Analysis of Pre Development Regulatory Procedures

    By Hughes DC

    Coal development in New South Wales can involve a complex series of government approvals, a requirement that results from the coincidence of many development sites with environmentally sensitive ar

    Jan 1, 1983

  • AUSIMM
    Case Study . . . Industrial Relations in Resource Development

    Industrial relations on Australian and New Zealand resource projects can be volatile. Therefore investors have become increasingly aware over the years that sound industrial relations during const

    Jan 1, 1983

  • AUSIMM
    The Environmental Component in Mining Project Development

    Programmes of environmental investigations to identify and minimise impacts and satisfy government and community requirements have become an integral and rate determining component in the planning

    Jan 1, 1983

  • AUSIMM
    Designing for Maximum Production from Trucks and Loaders

    In many mining operations, the truck and loader equipment represents the bulk of the invested capital and the majority of the mine operating cost. The profitability of these mines is therefore crit

    Jan 1, 1983

  • AUSIMM
    Mining and the Environmental Protection Legislation in N.S.W.

    In September 1980 the N.S.W. Environ- mental Planning and Assessment Act was gazetted. This legislation created a new arena of government involvement in the procedure for obtaining approval to open

    Jan 1, 1983

  • AUSIMM
    Australian Iron & Steel Pty Ltd Experience with Ladle Injection

    A pilot steel ladle injection facility designed to assist in the production of high quality steels suitable for use in pipelines has been built and commissioned at the Basic Oxygen Steelmaking (BOS) p

    Jan 1, 1983

  • AUSIMM
    Use of Computerised Management Systems for the Blair Athol Coal mine Project

    As Project Managers for the Blair Athol Coal Mine Project, CMPS selected a number of computer systems to assist in project control. The areas where computers were used were: 1) Planning & Schedulin

    Jan 1, 1983

  • AUSIMM
    Broken Hill At The Cross Roads

    A review is given of the development of the author's ideas on the relationship of ore occurrence to regional dislocations in the earth's crust, presently identifiable in particular areas

    Jan 1, 1983

  • AUSIMM
    Case Studies of International Copper Development Projects

    By Pollack B

    Four different major international copper projects are discussed. Three have recently come on line, and one is now being constructed. Each of the projects has encountered unique problems during th

    Jan 1, 1983

  • AUSIMM
    Preassembly Concepts to Reduce Project Capital Costs

    By Kruse JW, Kjar AR

    Recently there has been increased recognition o'f the cost savings that can be achieved by the greater use of offsite preassembly for the construction of industrial plants. Preassembly is a me

    Jan 1, 1983