Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Ore Handling for the McArthur River and Cigar Lake Projects

    By Chuck Edwards

    "The development of two large, high-grade uranium projects has been proposed for northern Saskatchewan. The projects are now under review by a joint federal/provincial panel. The McArthur River projec

    Jan 1, 1997

  • CIM
    Ore Handling Systems in Shafts

    By William James Kempson

    This paper discusses ore handling systems in shafts. These are considered from the loading facility at shaft bottom all the way through to the discharge mechanism in the headframe. These systems will

    May 1, 2013

  • CIM
    Ore Hauling Alternatives from Mine to Site

    By L. Tikasz

    The primary purpose of ore hauling model studies is to capture the variability of the ore delivery ? stockpiling process in order to improve the estimation of equipment capacities and achievable throu

    Aug 1, 2013

  • CIM
    Ore in Depth in British Columbia Mines

    By S. J. Schofield

    INTRODUCTION ONE of the greatest and most interesting problems of economic geology is to discover criteria bearing on the persistence of ore in depth. It is a question which is very much to the fore

    Jan 1, 1935

  • CIM
    Ore Microscopy Applied to the Beneficiation of Volcanogenic Massive Sulfides

    By Orlando C. Gaspar

    Abstract - The presence of fine-grained mineral intergrowths, the complex distribution of deleterious minor elements, and the variable base-metal contents in some assemblages commonly pose technical p

    Jan 1, 1997

  • CIM
    Ore Microscopy Applied to the Beneficiation of Volcanogenic Massive Sulfides (89e4320c-184a-4b9d-8a40-34c652dfef8c)

    By Orlando C. Gaspar

    The presence of ?ne-grained mineral intergrowths, the complex distribution of deleterious minor elements, and the variable base-metal contents in some assemblages commonly pose technical problems for

    Jan 1, 1997

  • CIM
    Ore pass database: Quebec underground metal mines

    By J. -F. Lessard

    Most underground mines rely on ore pass systems to ensure the transport of ore and waste. The design and operation of ore pass systems often rely on past experience, which is often anecdotal and at ti

    Jan 1, 2006

  • CIM
    Ore Pebble Regrind of Sulphide concentrates in the Hardy Concentrator, Falconbridge

    By S McQuitty

    The metallurgical treatment of Falconbridge ore re-quires an extremely fine grind of the pyrrhotite portion ? for maximum liberation and recovery of nickel. This paper describes the operation of a gra

    Jan 1, 1964

  • CIM
    Ore Pre-Concentration by Bulk Sorting Using Real Time Elemental Analysis

    "Conveyed coal flows have been diverted on the basis of real time ash analysis since the 1980s. Many coarse particle separation methods are available through screens, jigs, heavy media separation, par

    Jan 1, 2018

  • CIM
    Ore Problems and the Microscope

    By W. L. Uglow

    In recent years, the microscope has come to be recognized as a valuable aid to engineers whose business is the discovery, development, concentration or reduction of metallic ores. In many of the large

    Jan 1, 1924

  • CIM
    Ore Processing Business Experiences in Russia 2005-7

    By John Starkey

    "During the period June 2007 to March 2007, John Starkey of Starkey & Associates (Starkey) worked in Russia for High River Gold, supervising the engineering design work that was being done at the IRGI

    Jan 1, 2008

  • CIM
    Ore Relations at the Horne and Aldermac Mines, Quebec

    By H. C. Cooke

    Geological examination of the underground workings of the Horne and Aldermac mines during the summer of 1927 has brought out the following facts: (1) That the ores tend to replace bodies of breccia o

    Jan 1, 1928

  • CIM
    Ore reserve estimation at the Enterprise Gold Mine, Pine Creek, Northern Territory, Australia. Part 1: structural and variogram analysis

    By Neil Schofield

    "The Pine Creek gold mineralization is associated with saddle reefs and quartz and quartz sulphide veining within the Enterprise Anticline. The anticlinal structure is complex and the mineralization w

    Jan 1, 1988

  • CIM
    Ore reserve estimation at the Enterprise Gold Mine, Pine Creek, Northern Territory, Australia. Part 2: the multigaussian kriging model

    By Neil Schofield

    "The estimation of recoverable ore reserves for feasibility in precious metal deposits such as Pine Creek must account not only f or the extreme variability of the ore grade but also for the complexit

    Jan 1, 1988

  • CIM
    Ore reserves - the four Cs (56b43a22-2c28-47ce-ad2b-75e60bf8cf34)

    By W. P. Armstrong, O. Owens

    "The process of arriving at the size and grade of· (a) a newly discovered body of mineralization, (b) a potential ore resource, (c) an orebody proposed for mining, or (d) the ore reserves in a mine, r

    Jan 1, 1994

  • CIM
    Ore Reserves - The Four CS (a7ae3a89-7579-4c05-a8da-57a4d0a04699)

    By Owen Owens, W. P. Armstrong

    The process of arriving at the size and grade of: (a) a newly-discovered body of mineralization, (b) a potential ore resource, (c) an orebody proposed for mining, or (d) the ore reserves in a mine, re

    Jan 1, 1993

  • CIM
    Ore reserves, mining and profit

    By Hugh K. Taylor

    "With some justification, people have long complained about the indefinition of ore reserves. Perhaps they were led to expect too much; from former and easier definition practices in the once common u

    Jan 1, 1994

  • CIM
    Ore Reserves- The Four Cs

    By Owen Owens, W. P. Armstrong

    Abstract- The process of arriving at the size and grade of: (a) a newly-discovered body of mineralization, (b) a potential ore resource, (c) an orebody proposed for mining, or (d) the ore reserves in

    Jan 1, 1993

  • CIM
    Ore Sorting of Low-Grade Gold Sulphide Deposits

    By N. Schmalbein, L. von Ketelhodt, L. Kotelo

    "The mining industry continues to remain challenged. Lower commodity prices, increasing labor costs and more importantly diminishing reserves are amongst some of the primary factors contributing to th

    Jan 1, 2017

  • CIM
    Ore Thawer at Pine Point

    By R. J. Johnston

    "INTRODUCTIONPoint Mines is located about 65 miles east of Hay River on the South Shore of the Great Slave Lake. It is connected to the Northern Alberta Railway System by the Great Slave Lake Division

    Jan 1, 1972