Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    REE and background Au/Ag evidence concerning the origin of hydrothermal fluids in the Cape Ray electrum deposits, southwestern Newfoundland

    By Derek H. C. Wilton

    "The Cape Ray Fault Zone of southwestern Newfoundland contains two notable electrum/ base metal sulphide quartz vein lode occurrences hosted by two contrasting lithological units, viz. a graphite schi

    Jan 1, 1985

  • CIM
    Royalty arrangements in jeopardy

    By Robert B. Parsons

    "Draft income tax amendments aimed primarily at certain carve-out arrangements prevalent in the oil and gas industry could have devastating results for long standing royally arrangements in the mining

    Jan 1, 1985

  • CIM
    The Mechanics of Operation of Column Flotation Machines

    By R. L. Amelunxen

    "In January 1983, Gibraltar Mines Ltd. started an exploratory program on Column Flotation with hopes of improving performance of the Molybdenum Cleaning circuit. The encouraging results led to a colum

    Jan 1, 1985

  • CIM
    Case histories in tile use of Pulse EM from surface and boreholes as an aid in the detection and definition of deep ore deposits

    By J. Duncan Crone

    "A test surface Pulse EM(PEM) survey over a plunging massive sulphide lens, located in the Snow Lake area of Manitoba, has shown that it is possible to detect the body to a depth of 300 metres. Anothe

    Jan 1, 1985

  • CIM
    Cluff Lake Mill - Phase 2 Expansion

    By H. A. Schnell

    "The Phase I Mill at Cluff Lake in northern Saskatchewan was designed to accommodate a very specific high grade uranium ore. As this high grade ore was depleted, construction was undertaken on a new m

    Jan 1, 1985

  • CIM
    Lower level operations in a thick steeply pitching seam at Cadomin Coal Mine; in Cadomin, Alberta

    By N. Melnyk

    "FOREWORDThis paper provides a unique description of a method devised for mining a very thick steeply dipping seam of soft gassy coal which was prone to spontaneous combustion. The editors con¬sider t

    Jan 1, 1985

  • CIM
    Aids to design for coal preparation plants

    By D. G. Osborne

    "The paper describes current 'tools' available to the coal preparation engineer for carrying out the evaluation of data, process design, selection of equipment and layout and design of coal

    Jan 1, 1985

  • CIM
    Mining problems at La Mine Bousquet

    By Bennett McLaughlin, Gille Brousseau, John F. Cook

    "La Mine Bousquet commenced operations in October 1979. Mining has been by underground methods from two main zones which dip steeply to the south , Sub-level stoping methods with following fill are us

    Jan 1, 1985

  • CIM
    Coal preparation at Smoky River Coal Limited, Grande Cache, Alberta

    By E. L. Horner

    "Srnoky River Coal is capable ofprocessing 3 million tonnes per year ofrun-of-mine coal at the Smoky River Coal preparation facilities to produce 2.1 million tonnes of high quality, low volatile cokin

    Jan 1, 1985

  • CIM
    Performance Characteristics of an Improved Flotation Mechanism

    By George A. Lawrence, J. C. McHardy

    "Field operating experience with an improved flotation mechanism for handling various flotation applications is covered in this paper. Some aspects of designing flotation machines are also presented.

    Jan 1, 1985

  • CIM
    The New Brunswick coal resource

    By F. D. Ball, D. E. Gemmell

    "Coal mining in New Brunswick dates from the year 1639, when, as today, coal was produced from the area surrounding Grand Lake near the geographic centre of the province. Current production by N.B. Co

    Jan 1, 1985

  • CIM
    Demand and production potential of coal in Canada

    By A. Darragh

    "Past Growth The Canadian coal industry has grown rapidly during the past two decades. Coal production increased over four-fold between 1965 and 1982; consumption almost doubled, imports remained rela

    Jan 1, 1985

  • CIM
    Process for the recovery of niobium oxide from pyrochlore concentrate

    By G. Gabra

    "A process of leaching niobium oxide from pyrochlore concentrate using hydrofluoric acid is described. Variables such as acid concentration, temperature, reaction time, solid/acid ratio, agitation spe

    Jan 1, 1985

  • CIM
    Cut-off grade calculations for an open-pit mine

    By H. T. John

    "The objective of this paper is to demonstrate how the optimum cut -off grade can be calculated for typical large tonnage openpit mines. In the examples, it is assumed that the concentrator tonnage is

    Jan 1, 1985

  • CIM
    Estimation of liberation

    By T. Yalcin

    "This paper describes the development of a mathematical model for determining the liberation of an ore at various grinding sizes, based on the combined results of microscopic counting, grinding tests,

    Jan 1, 1985

  • CIM
    Use of shaped charges in mining operations

    By E. Contestabile, T. R. Craig

    "This report describes the development and effective use of shaped charges as part of the Elliot Lake Mine Roof Stability Project to remotely remove the heads from roof bolts. With a slight modificati

    Jan 1, 1985

  • CIM
    Radiation Grafted Structures - A New Tool for Recovery of Precious Metals from Dilute Solutions

    By G. Shore

    Radiation grafted structures my be fabricated to contain ion exchange groups selective to an ion complex. Proper choice of substrate and monomer will provide selective ion exchange with differing phys

    Jan 1, 1985

  • CIM
    Warrants and SPTCs add zest to new share issues

    By Robert B. Parsons

    "This month, Tax Notes focuses on two features which can potentially ""dress up"" a new issue of common shares to make the shares more attractive to investors. Attaching warrants to a share issue is a

    Jan 1, 1985

  • CIM
    Grinding mills-installation and maintenance

    By J. George Gregr

    "This paper gives a brief review of grinding mills installation procedures with special emphasis on future maintenance. The importance of cooperation between the customer, construction contractor and

    Jan 1, 1985

  • CIM
    An example of geological modelling and data manipulation with a microcomputer: Bullmoose Coal Mine, northeastern British Columbia

    By Ward E. Kilby, Bruce I. Mcclymont

    "Data from the South Fork Pit Area of the Bullmoose deposit in northeastern British Columbia are used to demonstrate the usefulness of microcomputers to the on-site geologist. The technique utilizes a

    Jan 1, 1985