Characteristics of the Blasted Muck and the Loader's ProductivityBy R. Narendrula, S. P. Singh
The productivity of a loading machine is affected by several factors. One of the most significant is the characteristic of the muck being loaded. A study was conducted to examine the effects of the lo
Jan 1, 2005
-
Diamonds are a Driller's Best FriendBy Langdon T. Mitchell, Karl Ingmarsson
The title is not referring to jewelry; nor is it about diamond core drilling. This article is instead about an emerging application for diamonds, hard rock percussive drilling with diamond drill bits.
Jan 1, 1999
-
Development and Blast Applications for Resolution Copper's No. 10 ShaftBy Tom Goodell, James Cox, Scott Scovira
Resolution Copper Mining is sinking a 6943 foot (2116 m) deep shaft to access and develop a new panel caving mine with approximately 1.6 billion known tons of porphyry copper resource. This mine will
Jan 1, 2014
-
Precision Blasting in the Nation's Captial: A Case History Showing the Use of a Seismograph as a Tool to Control Blasting VariablesBy Bill Rose, Alan Foster
This paper will outline blasting as undertaken at the Flour Mill project in the Georgetown area of Washington, D.C. It will discuss the vibration and blasting problems found in blasting in high risk a
Jan 1, 1979
-
Connecticut's "Call Before You Dig" System: New Laws and RegulationsBy Stephen G. Rieben
Almost everyone has at least heard of the two one-call systems which serve New England. They are "Call Before You Dig", which covers Connecticut, and "Dig Safe", which covers the remaining five New En
Jan 1, 1990
-
Tennessee's Largest Pipe InstallationBy James R. Houston, Wendel Clay Chaffin, John Loviza
During the spring and summer of 1993 the largest pipeline in Tennessee was installed as part of the upgrading of Nashville's sewage needs through the year 2035. This new 3.3 million dollar outfall pro
Jan 1, 1995
-
ICI's Computer Blasting Model SABREX - Basic Principles and CapabilitiesBy J P. Tidman, I J. Kirby, G H. Harries
The SABREX computer model is based on the fact that both shock waves and gas pressure are important in describing a blast. The treatment of explosive-rock interactions includes the influence of non-id
Jan 1, 1987
-
Use of Electric Field Measurement and a Weather Data Service for Lightning Warning at the US Bureau of Mines' Pittsburgh Research CenterBy Lon D. Santis
This paper describes a lightning warning system (LWS) in operation at the U.S. Bureau of Mines' (USBM) Pittsburgh Research Center (PRC) from December, 1989 to April, 1991. An electric field mill measu
Jan 1, 1993
-
Utility Blasting Using Atlas's Two-Component Explosive KinepakBy Carl E. Jones
This presentation discusses the properties of the two-component explosive, KinePak, and how it is used by the utility industry.
Jan 1, 1978
-
Management's Effect on Drilling and BlastingBy Alan R. Gadberry
To resolve drilling and blasting problems, rather than treating symptoms and allowing problems to grow, the mine operator needs to change the way he operates. When a mine operator discovers a drilling
Jan 1, 1985
-
Don't Wage War in the Media, or Be Silent and Forfeit It All!By S D. Cummings
"CRACKS CONCERN CORPORATION" Was the headline on the front page of the Terre Haute Tribune Star, March 1994. Having spent several years following up on blast-induced damage allegations made this artic
Jan 1, 1995
-
Explosives Cost Reduction and Fragmentation Improvement at Inco's McCreedy West MineBy Steven Townend, Don Wadden
In today's global economy the need to stay competitive is essential for commercial survival and growth. To this end Inco is committed to continuous improvement in its operations. Various aspects of th
Jan 1, 1994
-
Development, Application and Review of Ontario's Quarry Blasting Vibration GuidelinesBy Lance McAnnuff
Whatever system is devised to control noise and ground vibration from blasting operations must present an effective compromise between the rights of the individual to be undisturbed by the actions of
Jan 1, 2004
-
ICI's ExEx2000 Blasting SystemsBy Peter Duniam, Vivian Patz
History of the ExEx 1000 CAB system. l What we’ve learned using electronic timing. l Requirements for a second generation. EDD system. l The ExEx 2000 system - simple, versatile and cost effective
Jan 1, 1997
-
Mountain Mass Surrenders to Man's Initiative & DaringBy Yogesh Narula
Nevis Bluff Landslide - On September 17” 2000, a rockfall measuring lO,OOOm3 at Nevis Bluff, New Zealand, triggered a loday emergency. It ended when a hazardous column of rock that towered over State
Jan 1, 2002
-
Preblast Surveys and a Look at Today's Seismographs: A General LookBy Randall M. Wheeler
Pre-blast surveys are used to document the condition of a structure prior to the commencement of blasting activities. They provide the best means of determining the pre-existence of visible cracking a
Jan 1, 1992
-
Cast Blasting Advances and Challenges at Arco's Black Thunder MineBy Robert L. Martin, Brian W. Stump
"The Black Thunder Mine is located in the Powder River Basin of Northeastern Wyoming. Over 39.2million tons of coal were produced at the Black Thunder Mine in 1996. Just over 100 million pounds ofANFO
Jan 1, 1997
-
ICI's Computer Blasting Model SABREX - Field Calibration and ApplicationsBy G G. Paine, C V. B Cunningham, G Harries
The companies of the ICI Explosives Group have successfully used a wide variety of internal computer codes including BOBCAT, KUZ-RAM, ICRAX, XPLODE, BLEND, 3CRACK, MICBLAST, DETON, etc. In recent year
Jan 1, 1987
-
Super Accurate Detonators - A Rockblaster's DreamBy Jan Westberg, Roger Holmberg, Bernt Larsson
Over the last couple of decades there has been an increased demand from the market for precision detonators, partly because of a need for better blasting results and partly because of a need for bette
Jan 1, 1988
-
Electronic Initiation Applications at Barrick Goldstrike's Meikle MineBy Ray Slavin, Remi Proulx
The Meikle Mine is a mature underground gold mine utilizing primary and secondary longhole open stoping method with delayed backfill. Combined production with the newly developed Rodeo Mine is 4700 to
Jan 1, 2004