Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • ISEE
    Digitally Integrating the Blast Design with Remote Wireless Electronic Blasting

    By Charles Pretorius

    Electronic Delay Detonators (EDDs) with remote wireless programming and initiation capabilities have been successfully used for almost two years now. This system has been used in blasts mainly in Sout

    Jan 1, 2005

  • ISEE
    Some New Insights on Borehole Wall Pressure When Using De-coupled Charges

    By X Meng, W. A. Hustrulid, M. K. McCarter

    Rock excavation in both surface and underground mining is largely accomplished using the drill and blast technique. At the perimeter of such excavations, cautious blasting procedures are often employe

    Jan 1, 2005

  • ISEE
    Developments of Granular Emulsion Explosives

    By Takuya Taguchi, Toshihiro Ogata, Atsuio Inoue, Shigeyuki Sasaki

    Highly improved drilling machines and mucking machines have been used for the underground construction. To have rapid construction, the roles of blasting operation ha ve been growing more important. A

    Jan 1, 2005

  • ISEE
    Future Directions in Ground Vibration and Airblast Control within an Australian Regulatory Context

    By A Brodbeck, AT Spathis

    Australian regulatory control of ground vibration and airblast arising from mining, quarrying and civil construction operations is spread across a number of federal, state and local authorities and ac

    Jan 1, 2005

  • ISEE
    A Study of the Use Signature Holes for Smaller & Faster Moving Construction Blasting Operations

    By Dale Bartholomae, David Harrison, Edward J. Walter

    Methods that involve the use of signature blast holes in order to identify the particular frequency characteristics of a geographical area are widely available. Information acquired can be used to det

    Jan 1, 2005

  • ISEE
    Regulatory Control of Blast Vibration Levels in the UK

    By Rob Farnfield

    In the UK all new developments, including mines, quarries, tunnels, etc., are subject to a system of planning control. If the use of explosives is anticipated then such developments will attract a num

    Jan 1, 2005

  • ISEE
    Underwater Explosions Part 1. Estimation of the Test Method for the Determination of Energy Content of Explosives

    The underwater explosions have been used for several decades for the determination of energy content of explosives. This test method is the only one by which shock, fly rock and total energy can be me

    Jan 1, 2005

  • ISEE
    Swedish Standards for Ground Vibrations and Airblast

    By Roger Holmberg, Donald Jonson

    The Swedish Standard SS 460 48 66, “Vibration and shock - guidance levels for blasting induced vibration limits”, is based on more than 50 years of experience from blasting close to structures and tun

    Jan 1, 2005

  • ISEE
    Design and Testing of Bubble Curtain at Whirl Bay, BC

    By Alastair Grogan

    In October of 2002, the author was retained by Public Works and Government Services Canada, on behalf of the Department of National Defense, to design, construct and test the effectiveness of a bubble

    Jan 1, 2005

  • ISEE
    Vibration Workshop Abstract Canadian Vibration and Airblast Regulations

    By Paul McAnuff, Alastair Grogan

    In Canada, the only vibration regulations which apply across the entire country are intended to protect fish spawning areas. The Provinces and Territories regulate mines and quarries, and are responsi

    Jan 1, 2005

  • ISEE
    A Digital Surface Remote Blasting System

    By Peter Reinders, Dirk Hummel

    This paper describes a newly developed Surface Remote Blasting System (SURBS) for electronic detonators, which is currently being introduced into surface blasting applications. The rationale for devel

    Jan 1, 2005

  • ISEE
    Public Relations Program on a Deep Tunnel Project in Atlanta

    By Gregory B. Poole

    As part of a $3.5 billion program to improve the antiquated waste water system in the city of Atlanta, the Nancy Creek Tunnel is being constructed across the northwest portion of the city. This tunnel

    Jan 1, 2005

  • ISEE
    Analysis of Parameters of the Ground Vibration Produced by Bench Blasting at a Boron Open Pit Mine in Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Mehmet Aksoy, Kagan Ozdemire

    With increasing environmental constraints on the levels of disturbance induced by blasting operations upon nearby residents, there is an increasing need to be able to design cautious blasting with gre

    Jan 1, 2005

  • ISEE
    Microphone Height Effects on Blast-Induces Air Overpressure

    By Randall M. Wheeler, Kenneth K. Eltschlager

    Blasting Seismographs use microphones to measure air overpressure from blasting. The microphone height above the ground has been the object of some controversy. The current ISEE “Field Practice Guidel

    Jan 1, 2005

  • ISEE
    How Electronics Initiation has Changed the Rules of Blast Design

    By Thierry Bernard

    For many years now electronic initiation has brought the time parameter to the centre of blast designs forever. Although this parameter existed before the era of electronic detonators, Blasting engine

    Jan 1, 2005

  • ISEE
    Application of Air Decking to Blasting - Finding from Numerical Modelling

    By P. D. Katsabanish

    Air decking applications are examined using numerical modelling and the AutodynTM code. The mechanism of damage is illustrated and discussed. Air decking is shown to provide advantages over stemming w

    Jan 1, 2005

  • ISEE
    It Felt like an Earthquake

    By David Ziegler, John Babcock, Gregory Poole

    On December 9, 2003 at 3:59 PM EST an earthquake with a 4.5 magnitude occurred in central Virginia. According to a survey on the US Geological Survey website, this quake was felt as far away as Bridge

    Jan 1, 2005

  • ISEE
    Modeling of Special Blast Geometries from Open Pit to Underground

    By Dale S. Preece, Stephen H. Chung

    Explosives energy can be used effectively in breaking and displacing large volumes of rock in mining and quarrying industries in both open pit and underground. The blast result, however, may not be ec

    Jan 1, 2005

  • ISEE
    Mechanisms of Linear Shaped Charge Cutting - A New Explanation

    By Paul Worsey, Braden Lusk, Seokbin Lim

    This paper discusses the theory and experiment involved in the discovery of the mechanisms of Linear Shaped Charges, which are much different from those for Conical Shaped Charges. Linear Shaped Charg

    Jan 1, 2005

  • ISEE
    Digital Tunnel Blasting in a Sensitive Environment: N1 Porto Tunnel Project, Portugal

    By Yannick Bleuzen, Manuel Joao, Frederic Monath, Miguel Quaresma

    The N1 Porto tunnel project is a 650m segment of large-scale civil engineering plan to improve traffic flow between Porto’s downtown district, the Santo Antonio hospital district and the highway acces

    Jan 1, 2005