Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SAIMM
    Optimal Coal Processing Route For The 3 X 0,5 Mm Size Fraction? - Introduction

    By Jeremy Bosman, Johan de Korte

    Traditionally the feed to coal preparation plants was de-slimed at 0,5 mm. The +0,5 mm size fraction was processed via dense-medium cyclones and the -0,5 mm size fraction was beneficiated with froth f

    Jan 1, 2006

  • SAIMM
    Optimal Cut-Off Grade Determination Based On Variable Capacities In Open-Pit Mining - Synopsis

    By J. Abdollahisharif

    Optimal cut-off grade is one of the most critical parameters in open-pit mine design because it defines the ore and waste and thus determines the maximum net present value possible from the mining ope

    Jan 1, 2012

  • SAIMM
    Optimal planning of extracting works at the quarries of non-ferrous metallurgy of Kazakstan

    By I. V. Lunkin, E. B. Muhamedzhanov, A. B. Begalinov, B. R. Rakishev

    Almost all the ore deposits of ferrous, non-ferrous and rare metals of Kazakstan, are exploiting by the open-cast method, are the complex-structural, multi-component ones. Their rational working requi

    Jan 1, 2003

  • SAIMM
    Optimal Valuation And Kriging - 9.1 Definitions: Kriging Estimator And Kriging Error

    [Consider a square block W in an ore body S2, to be valued from one centre sample w, and one corner sample w2 (Fig. 9.1). The sample set is ws = Iw,;w21. We can estimate the block average µw by the a

    Jan 1, 1978

  • SAIMM
    Optimal Valuation Using Historical Information: A Case Study - 10.1 Introduction

    In many practical situations, calculation of the point semivariogram is not necessary. Such a case is analysed in this chapter. The purpose of this analysis is to give a better understanding of the me

    Jan 1, 1978

  • SAIMM
    Optimine™ simulation tool and its used for underground process and material flow optimization

    By T. Puhakka

    Simulation is a way to obtain quickly today future information on how planned systems will most likely behave in various selected situations. This information may then be used to optimize the system a

    Sep 1, 2001

  • SAIMM
    Optimisation and Prediction of Co3+-Enhanced Dissolution in Sulfuric Acid

    By B. Mbuya, A. F. Mulaba-Bafubianda, J. M. Mvita

    The paper explains the main effects of input leaching parameters, such as addition of a reducing agent, acidity, agitation, temperature, and leaching system potential, in relation to observed and pred

    Jan 1, 2023

  • SAIMM
    Optimisation Of Anglo Platinum?s ACP Acid Plant Catalytic Converter

    By M. K. Sichone

    Anglo Platinum?s Waterval smelting complex based in South Africa operates the Anglo Converting Process (ACP) that produces SO2 offgas. This SO2 offgas is treated in a double-contact, double-absorption

    Jan 1, 2009

  • SAIMM
    Optimisation of Circuits for Pressure Leaching of Sulfide Ores and Concentrates

    By Fadeela Saloojee, Frank K. Crundwell

    "Pressure leaching is an option for copper recovery from chalcopyrite. Leaching takes place at high temperatures and pressures in the presence of an oxidising agent. This work shows how the performanc

    Jan 1, 2015

  • SAIMM
    Optimisation Of Flotation Circuit Configuration At PT Newmont Nusa Tenggara (cfd7ecd0-efe3-4487-b843-71559e2ce6be)

    Two column flotation cells have been installed as single-stage rougher cleaners at Batu Hijau. The objective was to provide additional residence time in the cleaner circuit to maintain maximum recover

    Jan 1, 2007

  • SAIMM
    Optimisation of pit to sag mill network using mixed integer linear programming APCOM 2021

    By Z. Saw, C. Poveda, N. L. Mai

    Optimising the throughput of a mining network comprising all equipment from shovels to semi-autogenous grinding (SAG) mills is a complicated task, yet the potential benefits can be significant. Key mo

    Sep 1, 2021

  • SAIMM
    Optimisation Of SiMn Production At Transalloys

    By J. Griesel, P. H. F. Bouwer, K. Bisaka

    Transalloys produces 160 000 tons of SiMn per annum from five AC submerged-arc furnaces. The lime-ore melt from two AC open-arc furnaces is contacted with SiMn to produce 50 000 tons of medium carbon

    Jan 1, 2004

  • SAIMM
    Optimisation Of Specific Power Consumption In The Production Of Ferro Alloys Through Rationalisation Of Charge Distribution

    By S. Ranganathan

    Production of ferro-chromium in the submerged-arc furnace is highly energy-intensive. Several process rates have been attempted to reduce the specific energy consumption in the production of this allo

    Jan 1, 2007

  • SAIMM
    Optimising a Reflux Classifier circuit, P. Ramsaywok, G. Legodi, and S. Ndanduleni

    By P. Ramsaywok, S Ndanduleni, G. Legodi

    The objective of this paper is to share the optimisation journey of a pilot Reflux classifier (RC) circuit in the Exxaro GG1 plant, at Grootegeluk beneficiation complex in Lephalale, South Africa. The

    Jan 1, 2020

  • SAIMM
    Optimising Project Value And Robustness (77d01627-3b0d-44f3-b691-f65dafcd411c)

    By G. Whittle

    An important aspect of the project evaluation process is the achievement of a clear and quantitative understanding of the primary drivers influencing project value and risk. A business scenario-based

    Jan 1, 2007

  • SAIMM
    Optimising The Effective Use Of Energy In The Ferroalloy Industry Through Innovative Technology

    By A. M. Hearn, J. G. Roos

    Energy consumption, being a large proportion of the input of the ferroalloy production process, can be measured in terms of the efficiency with which the energy is utilized and the effectiveness with

    Jan 1, 2004

  • SAIMM
    Optimising the ramp design in an open pit mine APCOM 2021

    By I. Kaabachi, F. Meunier, N. Morales

    In open pit mining, ore and waste are hauled outside of the excavation area by trucks that move along a system of ramps. The design of these ramps must be carefully addressed because they have to comp

    Sep 1, 2021

  • SAIMM
    Optimization Of An Autonomous Vehicle Dispatch System In An Underground Mine

    By P. Saayman

    The mining industry has much potential for automation. A great deal of work has been done on this subject and is still ongoing. With automation comes the possibility for optimization, because more inf

    Jan 1, 2006

  • SAIMM
    Optimization of an Integrated Flowsheet for Barite Processing

    By R. Ciccu

    This paper examine the optimization of a beneficiation plant for recovering marketable barites from crude ores of different characteristics. The plant, part of a mining complex in Sardinia, consists o

    Jan 1, 1987

  • SAIMM
    Optimization of chromium precipitation from ferrochrome leach solutions

    By F. Ntuli, T. V. Nyangadzayi

    Chromium green is an essential metal with various applications in the paints, construction, electronics, and aerospace industries. The main source of chromium green is the carbo-thermic reduction of c

    Dec 11, 2024